Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Parcel Search
 
Parcel Attributes
Parcel11508007F
JurisdictionTucson, Pima County
City of Tucson ZoningOCR-1
Tucson WardWard 3
Tucson Downtown Incentive ZoneDowntown Infill Incentive District
Tucson Registered NeighborhoodFeldman's
Major Street & Route

Arterial or Collector
-
Intersection Buffer

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Date - 08/21/2026 6:50 p.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
1/4 Mile Each Direction (N, E, S, W) 202 08/17/1905

Permits

Parcel Number - 11508007F
Date - 08/21/2026 6:50 p.m.
Total Number Of Permits - (3)
Permit Permit Status Entered Date Expired Date Unit Type Description
TR-UTL-0226-00224 Issued 02/06/2026 05/05/2026 Right-of-Way (ROW) - Utility Zayo Contractor (ADB Companies) to install conduit/fiber for an estimated 5,261 LF within City of Tucson ROW. Zayo Handholes to be installed every 2,000 LF to future maintenance/access. Renew permit for 90 days as of 05/05/2026, new expiration date is 08/03/2026.
T16EX01834 Final 05/11/2016 03/28/2017 EXCAV REMOVE EXISTING ASPHALT ROADWAY, CURB, SIDEWALK, CURB ACCESS RAMPS, DRIVEWAYS, STREETLIGHTS AND THE TRAFFIC SIGNALS AT STONE/DRACHMAN AND STONE/SPEEDWAY. A NEW ASPHALT ROADWAY WILL BE CONSTRUCTED WITH NEW CURB, SIDEWALKS, CURB ACCESS RAMPS, DRIVEWAYS, STREETLIGHTS AND TRAFFIC SIGNALS AT THE INTERSECTIONS. NEW BUS BULLOUTS ON THE SW CORNER OF STONE/DRACHMAN, AS WELL AS THE SW AND NE CORNERS OF STONE/SPEEDWAY. ADDITIONALLY, NEW MEDIAN ISLANDS, LANDSCAPING, IRRIGATION, WATER MAINS, AND A DRAINAGE STRUCTURE AT STONE/MABEL. 10/12/2016- RENEWED R1
T16TC01158 Expired 05/11/2016 N/A BARRICAD REMOVE EXISTING ASHALT ROADWAY, CURB, SIDEWALK, CURB ACCESS RAMPS, DRIVEWAYS, STREETLIGHTS AND THE TRAFFIC SIGNALS AT STONE/DRACHMAN AND STONE/SPEEDWAY. A NEW ASPHALT ROADWAY WILL BE CONSTRUCTED WITH NEW CURB, SIDEWALKS, CURB ACCESS RAMPS, DRIVEWAYS, STREETLIGHTS AND TRAFFIC SIGNALS AT THE INTERSECTIONS. NEW BUS BULLOUTS ON THE SW CORNER OF STONE/DRACHMAN, AS WELL AS THE SW AND NE CORNERS OF STONE/SPEEDWAY. ADDITIONALLY, NEW MEDIAN ISLANDS, LANDSCAPING, IRRIGATION, WATER MAINS, AND A DRAINAGE STRUCTURE AT STONE/MABEL.