Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Parcel Search
 
Parcel Attributes
Parcel14125004B
JurisdictionTucson, Pima County
City of Tucson ZoningRX-1
Tucson WardWard 5
Major Street & Route

Arterial or Collector

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Date - 11/08/2026 12:25 a.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C15-95-03 Harrison/I-10 8562 09/21/1995 8625

Permits

Parcel Number - 14125004B
Date - 11/08/2026 12:25 a.m.
Total Number Of Permits - (3)
Permit Permit Status Entered Date Expired Date Unit Type Description
TR-UTL-1026-01790 Withdrawn 10/15/2026 N/A Right-of-Way (ROW) - Utility ACCESSSING (2) EXISTING HH TO SPLICE FIBER. ACCESSING (7) EXISTING POLE TO SPLICE FIBER. LASH NEW FIBER FROM POLE 2 TO POLE 3 THROUGH NEW 10M STRAND (336'). RISER ON POLE 1 (20') LASH NEW FIBER FROM POLE 1 TO POLE 2 THROUGH NEW 10M STRAND (302'). PULL NEW FIBER FROM EXISTING HH TO BASE OF POLE 1 (15'). PLACE NEW DG&A. LASH NEW FIBER FROM POLE 3 TO POLE 4 THROUGH NEW 10M STRAND (315'). LASH NEW FIBER FROM POLE 2 TO POLE 3 THROUGH NEW 10M STRAND (336'). LASH NEW FIBER FROM POLE 4 TO POLE 5 THROUGH NEW 10M STRAND (274'). LASH NEW FIBER FROM POLE 3 TO POLE 3 THROUGH NEW 10M STRAND (315'). LASH NEW FIBER FROM POLE 5 TO POLE 6 THROUGH NEW 10M STRAND (164'). HAND DIG WITH NEW AERIAL FIBER FROM BASE OF POLE 6 TO NEW HH (6'). DIG 4X4 BORE PIT TO OVERSET BORE PIT W/ NEW 30X48 HH. OVERLASH NEW FIBER FROM POLE 6 TO POLE 7 THROUGH EXISTING COPPER FACILITY (207'). OVERLASH NEW FIBER FROM POLE 7 TO ROW THROUGH EXISTING COPPER FACILITY (2'). This project is for Lumen and will not be conveyed to any other company ** WITHDRAWN AS OF 10/26/2026 **
TR-UTL-1026-01839 In review 10/23/2026 N/A Right-of-Way (ROW) - Utility Lash new 72 CT aerial fiber from pole 2 to pole 3 through new 10M strand 336’. Riser p on pole 1, 20’. Lash new 72 CT aerial fiber from pole 1 to pole 2, 302’. Pull new fiber from existing HH_14816 to base of pole 1, 15’. Continue to lash aerial fiber from pole 3 to pole 4, 315’. From pole 2 to pole 3, 336’. Pole 5 to pole 4, 274’. Pole 3 to pole 4, 315’. Pole 4 to pole 5, 274’. Pole 5 to pole 6, 164’. Hand Dig 4x4 bore pit at base of pole 6 to place new 30x48 HH, 6’. Overlash new aerial fiber from pole 6 to pole 7, through existing copper facility, 207’ and from pole 7 to ROW, 2’. This project is for Lumen and will not be conveyed to any other company.
T00CM04293 Final 08/29/2000 08/05/2001 COMBO MODULAR BUILDING OLD #T99CM005344