Permit: TR-UTL-1026-01839
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
9521 S WILMOT RD
Address NEW:
9521 S WILMOT RD
Apply Date:
10/23/2026
Applicant:
Angeline Trejo
Description:
Lash new 72 CT aerial fiber from pole 2 to pole 3 through new 10M strand 336’. Riser p on pole 1, 20’. Lash new 72 CT aerial fiber from pole 1 to pole 2, 302’. Pull new fiber from existing HH_14816 to base of pole 1, 15’. Continue to lash aerial fiber from pole 3 to pole 4, 315’. From pole 2 to pole 3, 336’. Pole 5 to pole 4, 274’. Pole 3 to pole 4, 315’. Pole 4 to pole 5, 274’. Pole 5 to pole 6, 164’. Hand Dig 4x4 bore pit at base of pole 6 to place new 30x48 HH, 6’. Overlash new aerial fiber from pole 6 to pole 7, through existing copper facility, 207’ and from pole 7 to ROW, 2’. This project is for Lumen and will not be conveyed to any other company.
Permit Reviews
Permit Number - TR-UTL-1026-01839
Permit Status: Inspections
Permit Description: Lash new 72 CT aerial fiber from pole 2 to pole 3 through new 10M strand 336’. Riser p on pole 1, 20’. Lash new 72 CT aerial fiber from pole 1 to pole 2, 302’. Pull new fiber from existing HH_14816 to base of pole 1, 15’. Continue to lash aerial fiber from pole 3 to pole 4, 315’. From pole 2 to pole 3, 336’. Pole 5 to pole 4, 274’. Pole 3 to pole 4, 315’. Pole 4 to pole 5, 274’. Pole 5 to pole 6, 164’. Hand Dig 4x4 bore pit at base of pole 6 to place new 30x48 HH, 6’. Overlash new aerial fiber from pole 6 to pole 7, through existing copper facility, 207’ and from pole 7 to ROW, 2’.
This project is for Lumen and will not be conveyed to any other company.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/26/2026 | RIGHT-OF-WAY REVIEW v.1 | 11/13/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1026-01839
Permit Status: Inspections
Permit Description: Lash new 72 CT aerial fiber from pole 2 to pole 3 through new 10M strand 336’. Riser p on pole 1, 20’. Lash new 72 CT aerial fiber from pole 1 to pole 2, 302’. Pull new fiber from existing HH_14816 to base of pole 1, 15’. Continue to lash aerial fiber from pole 3 to pole 4, 315’. From pole 2 to pole 3, 336’. Pole 5 to pole 4, 274’. Pole 3 to pole 4, 315’. Pole 4 to pole 5, 274’. Pole 5 to pole 6, 164’. Hand Dig 4x4 bore pit at base of pole 6 to place new 30x48 HH, 6’. Overlash new aerial fiber from pole 6 to pole 7, through existing copper facility, 207’ and from pole 7 to ROW, 2’.
This project is for Lumen and will not be conveyed to any other company.
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 10/29/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 10/29/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. |
| 10/29/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 11/13/2026 | All excavations shall be secured for safety at the end of each shift. If pedestrian access cannot be maintained, a temporary protected pedestrian route shall be provided. All open trenches shall be protected by Type II barricades with Type A flashers and surrounded by a barrier fence. Trenches deeper than 4 feet shall be surrounded by chain-link fence. Excavations may need to be covered with steel plates or other approved materials at the end of each shift. |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-UTL-1026-01839
Permit Description: Lash new 72 CT aerial fiber from pole 2 to pole 3 through new 10M strand 336’. Riser p on pole 1, 20’. Lash new 72 CT aerial fiber from pole 1 to pole 2, 302’. Pull new fiber from existing HH_14816 to base of pole 1, 15’. Continue to lash aerial fiber from pole 3 to pole 4, 315’. From pole 2 to pole 3, 336’. Pole 5 to pole 4, 274’. Pole 3 to pole 4, 315’. Pole 4 to pole 5, 274’. Pole 5 to pole 6, 164’. Hand Dig 4x4 bore pit at base of pole 6 to place new 30x48 HH, 6’. Overlash new aerial fiber from pole 6 to pole 7, through existing copper facility, 207’ and from pole 7 to ROW, 2’.
This project is for Lumen and will not be conveyed to any other company.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/23/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | I spoke with Johnathan from Pauley over the phone and he informed me that work would begin on Dec 7 Monday and that the crossing of Wilmot would occur by Wed or Thurs of that week. He will have his crew lead contact me when traffic control is set up. | |
| 11/22/2026 | Required: Start Work Notice - Notify your DTM Inspector of your work start date. Notification only; you will be contacted if a Pre-Activity Meeting is needed. | Passed |