9521 S WILMOT RD
Address NEW:
9521 S WILMOT RD
Apply Date:
10/23/2026
Applicant:
Angeline Trejo
Description:
Lash new 72 CT aerial fiber from pole 2 to pole 3 through new 10M strand 336’. Riser p on pole 1, 20’. Lash new 72 CT aerial fiber from pole 1 to pole 2, 302’. Pull new fiber from existing HH_14816 to base of pole 1, 15’. Continue to lash aerial fiber from pole 3 to pole 4, 315’. From pole 2 to pole 3, 336’. Pole 5 to pole 4, 274’. Pole 3 to pole 4, 315’. Pole 4 to pole 5, 274’. Pole 5 to pole 6, 164’. Hand Dig 4x4 bore pit at base of pole 6 to place new 30x48 HH, 6’. Overlash new aerial fiber from pole 6 to pole 7, through existing copper facility, 207’ and from pole 7 to ROW, 2’. This project is for Lumen and will not be conveyed to any other company.

Permit Reviews

Permit Number - TR-UTL-1026-01839
Permit Status: Inspections
Permit Description: Lash new 72 CT aerial fiber from pole 2 to pole 3 through new 10M strand 336’. Riser p on pole 1, 20’. Lash new 72 CT aerial fiber from pole 1 to pole 2, 302’. Pull new fiber from existing HH_14816 to base of pole 1, 15’. Continue to lash aerial fiber from pole 3 to pole 4, 315’. From pole 2 to pole 3, 336’. Pole 5 to pole 4, 274’. Pole 3 to pole 4, 315’. Pole 4 to pole 5, 274’. Pole 5 to pole 6, 164’. Hand Dig 4x4 bore pit at base of pole 6 to place new 30x48 HH, 6’. Overlash new aerial fiber from pole 6 to pole 7, through existing copper facility, 207’ and from pole 7 to ROW, 2’. This project is for Lumen and will not be conveyed to any other company.
Start Date Submittal Complete Date Status  
10/26/2026 RIGHT-OF-WAY REVIEW v.1 11/13/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-1026-01839
Permit Status: Inspections
Permit Description: Lash new 72 CT aerial fiber from pole 2 to pole 3 through new 10M strand 336’. Riser p on pole 1, 20’. Lash new 72 CT aerial fiber from pole 1 to pole 2, 302’. Pull new fiber from existing HH_14816 to base of pole 1, 15’. Continue to lash aerial fiber from pole 3 to pole 4, 315’. From pole 2 to pole 3, 336’. Pole 5 to pole 4, 274’. Pole 3 to pole 4, 315’. Pole 4 to pole 5, 274’. Pole 5 to pole 6, 164’. Hand Dig 4x4 bore pit at base of pole 6 to place new 30x48 HH, 6’. Overlash new aerial fiber from pole 6 to pole 7, through existing copper facility, 207’ and from pole 7 to ROW, 2’. This project is for Lumen and will not be conveyed to any other company.
Total Outstanding Activity Conditions - 4
Date Name
10/29/2026 Traffic control set-up approved between 9AM - 3:30PM
10/29/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control.
10/29/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
11/13/2026 All excavations shall be secured for safety at the end of each shift. If pedestrian access cannot be maintained, a temporary protected pedestrian route shall be provided. All open trenches shall be protected by Type II barricades with Type A flashers and surrounded by a barrier fence. Trenches deeper than 4 feet shall be surrounded by chain-link fence. Excavations may need to be covered with steel plates or other approved materials at the end of each shift.

Completed Inspections

Permit Status: Inspections
Permit Number: TR-UTL-1026-01839
Permit Description: Lash new 72 CT aerial fiber from pole 2 to pole 3 through new 10M strand 336’. Riser p on pole 1, 20’. Lash new 72 CT aerial fiber from pole 1 to pole 2, 302’. Pull new fiber from existing HH_14816 to base of pole 1, 15’. Continue to lash aerial fiber from pole 3 to pole 4, 315’. From pole 2 to pole 3, 336’. Pole 5 to pole 4, 274’. Pole 3 to pole 4, 315’. Pole 4 to pole 5, 274’. Pole 5 to pole 6, 164’. Hand Dig 4x4 bore pit at base of pole 6 to place new 30x48 HH, 6’. Overlash new aerial fiber from pole 6 to pole 7, through existing copper facility, 207’ and from pole 7 to ROW, 2’. This project is for Lumen and will not be conveyed to any other company.
Total Completed Inspections - 2
Date Description Inspector Results Comments
11/23/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed I spoke with Johnathan from Pauley over the phone and he informed me that work would begin on Dec 7 Monday and that the crossing of Wilmot would occur by Wed or Thurs of that week. He will have his crew lead contact me when traffic control is set up.
11/22/2026 Required: Start Work Notice - Notify your DTM Inspector of your work start date. Notification only; you will be contacted if a Pre-Activity Meeting is needed. Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
DESIGN PLAN-E.1600.0033516_SATELLITE_PLAN_WILMOT RD-D1_V1.PDF DOCUMENTS VIEW
E.1600.0033516 _CAD_WILMOT RD_TUCSON_V1.PDF DOCUMENTS VIEW
QWS240611_V1.PDF DOCUMENTS VIEW
QWS240612_V1.PDF DOCUMENTS VIEW