Permit Details

Status:
In Review
Type:
Right-of-Way (ROW) - Utility
Address:
9521 S WILMOT RD
Address NEW:
9521 S WILMOT RD
Apply Date:
10/23/2026
Applicant:
Angeline Trejo
Description:
Lash new 72 CT aerial fiber from pole 2 to pole 3 through new 10M strand 336’. Riser p on pole 1, 20’. Lash new 72 CT aerial fiber from pole 1 to pole 2, 302’. Pull new fiber from existing HH_14816 to base of pole 1, 15’. Continue to lash aerial fiber from pole 3 to pole 4, 315’. From pole 2 to pole 3, 336’. Pole 5 to pole 4, 274’. Pole 3 to pole 4, 315’. Pole 4 to pole 5, 274’. Pole 5 to pole 6, 164’. Hand Dig 4x4 bore pit at base of pole 6 to place new 30x48 HH, 6’. Overlash new aerial fiber from pole 6 to pole 7, through existing copper facility, 207’ and from pole 7 to ROW, 2’. This project is for Lumen and will not be conveyed to any other company.

Permit Reviews

Permit Number - TR-UTL-1026-01839
Permit Status: In review
Permit Description: Lash new 72 CT aerial fiber from pole 2 to pole 3 through new 10M strand 336’. Riser p on pole 1, 20’. Lash new 72 CT aerial fiber from pole 1 to pole 2, 302’. Pull new fiber from existing HH_14816 to base of pole 1, 15’. Continue to lash aerial fiber from pole 3 to pole 4, 315’. From pole 2 to pole 3, 336’. Pole 5 to pole 4, 274’. Pole 3 to pole 4, 315’. Pole 4 to pole 5, 274’. Pole 5 to pole 6, 164’. Hand Dig 4x4 bore pit at base of pole 6 to place new 30x48 HH, 6’. Overlash new aerial fiber from pole 6 to pole 7, through existing copper facility, 207’ and from pole 7 to ROW, 2’. This project is for Lumen and will not be conveyed to any other company.
Start Date Submittal Complete Date Status  
10/26/2026 RIGHT-OF-WAY REVIEW v.1 N/A IN REVIEW Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-1026-01839
Permit Status: In review
Permit Description: Lash new 72 CT aerial fiber from pole 2 to pole 3 through new 10M strand 336’. Riser p on pole 1, 20’. Lash new 72 CT aerial fiber from pole 1 to pole 2, 302’. Pull new fiber from existing HH_14816 to base of pole 1, 15’. Continue to lash aerial fiber from pole 3 to pole 4, 315’. From pole 2 to pole 3, 336’. Pole 5 to pole 4, 274’. Pole 3 to pole 4, 315’. Pole 4 to pole 5, 274’. Pole 5 to pole 6, 164’. Hand Dig 4x4 bore pit at base of pole 6 to place new 30x48 HH, 6’. Overlash new aerial fiber from pole 6 to pole 7, through existing copper facility, 207’ and from pole 7 to ROW, 2’. This project is for Lumen and will not be conveyed to any other company.
Total Outstanding Activity Conditions - 3
Date Name
10/29/2026 Traffic control set-up approved between 9AM - 3:30PM
10/29/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control.
10/29/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.