Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Parcel Search
 
Parcel Attributes
Parcel141195070
JurisdictionTucson, Pima County
City of Tucson ZoningR-2
Tucson WardWard 4
Tucson Registered NeighborhoodRita Ranch
Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Date - 11/23/2026 6:04 p.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-64-84 Area 7 6142 01/17/1985 6143

Permits

Parcel Number - 141195070
Date - 11/23/2026 6:04 p.m.
Total Number Of Permits - (4)
Permit Permit Status Entered Date Expired Date Unit Type Description
TC-SOL-0125-00100 Inspections 01/27/2025 04/06/2026 Solar *Revision 1: 07/25/2025* -- *Review 1: 01/28/2025: Due to the fact that this project may be within a regulated floodplain and requires a Floodplain Use Review (FUP.), we have moved this project into a standard 30 Day Review Time Frame. Please start a new FUP at our permit application web page: https://tdc-online.tucsonaz.gov/#/home NOTE: Documentation of a cost estimate will be required for solar installations. The cost estimate must have a cost breakdown, it must include both the cost of materials and the cost of labor, and it may not be a leasing document. Instructions: 1. Navigate into the current project in the “My Work” tab. Within the permit, navigate to the “Sub-Records” tab and click “Apply” on the Floodplain Use Permit Sub-Record 2. Locations -> Confirm the location is accurate to the project. Click “Next” 3. Type -> Fill in the “Square Feet” and “Valuation” boxes with the project area and a contractor-provided cost estimate (See note above: for new structures, input 0). Click “Next” 4. Contacts -> Confirm contacts and add any additional contacts if applicable. Click “Next” 5. More Info -> This will be filled in by the engineer assigned to your case, Click “Next” 6. Attachments -> Please attach the project plan, supporting documentation for the cost estimate (if applicable), and a drainage/hydrology report (if applicable). Click “Next” 7. Signature -> Read the statement and type your name. Sign your name below (You may Enable Type Signature to have the software sign for you.) Click “Next” 8. Review and Submit -> Review all information to ensure accuracy. Click “Submit” Contact Michael Ortiz at michael.ortiz@tucsonaz.gov if you have any questions about the FUP.* -- Solarapp - Installation of 5.74kW PV System with Existing System
T00BU01442 Final 05/09/2000 12/17/2000 POOL/SPA POOL:GUNITE BYOP TD# 13-56-81
T18CM02954 Final 04/19/2018 12/29/2018 COMBO INSTALL ROOF MOUNTED SOLAR PV SYSTEM
T97CM03544 Final 11/03/1997 07/20/1998 COMBO SFR:TD#13-14-76