Permit: TC-SOL-0125-00100
Permit Details
Status:
Inspections
Type:
Solar
Address:
10136 E PASEO SAN ROSENDO
Address NEW:
10136 E PASEO SAN ROSENDO
Apply Date:
01/27/2025
Applicant:
Marytine Ramos
Description:
*Revision 1: 07/25/2025* -- *Review 1: 01/28/2025: Due to the fact that this project may be within a regulated floodplain and requires a Floodplain Use Review (FUP.), we have moved this project into a standard 30 Day Review Time Frame. Please start a new FUP at our permit application web page: https://tdc-online.tucsonaz.gov/#/home NOTE: Documentation of a cost estimate will be required for solar installations. The cost estimate must have a cost breakdown, it must include both the cost of materials and the cost of labor, and it may not be a leasing document. Instructions: 1. Navigate into the current project in the “My Work” tab. Within the permit, navigate to the “Sub-Records” tab and click “Apply” on the Floodplain Use Permit Sub-Record 2. Locations -> Confirm the location is accurate to the project. Click “Next” 3. Type -> Fill in the “Square Feet” and “Valuation” boxes with the project area and a contractor-provided cost estimate (See note above: for new structures, input 0). Click “Next” 4. Contacts -> Confirm contacts and add any additional contacts if applicable. Click “Next” 5. More Info -> This will be filled in by the engineer assigned to your case, Click “Next” 6. Attachments -> Please attach the project plan, supporting documentation for the cost estimate (if applicable), and a drainage/hydrology report (if applicable). Click “Next” 7. Signature -> Read the statement and type your name. Sign your name below (You may Enable Type Signature to have the software sign for you.) Click “Next” 8. Review and Submit -> Review all information to ensure accuracy. Click “Submit” Contact Michael Ortiz at michael.ortiz@tucsonaz.gov if you have any questions about the FUP.* -- Solarapp - Installation of 5.74kW PV System with Existing System
Permit Reviews
Permit Number - TC-SOL-0125-00100
Permit Status: Inspections
Permit Description: *Revision 1: 07/25/2025* --
*Review 1: 01/28/2025: Due to the fact that this project may be within a regulated floodplain and requires a Floodplain Use Review (FUP.), we have moved this project into a standard 30 Day Review Time Frame. Please start a new FUP at our permit application web page: https://tdc-online.tucsonaz.gov/#/home NOTE: Documentation of a cost estimate will be required for solar installations. The cost estimate must have a cost breakdown, it must include both the cost of materials and the cost of labor, and it may not be a leasing document. Instructions: 1. Navigate into the current project in the “My Work” tab. Within the permit, navigate to the “Sub-Records” tab and click “Apply” on the Floodplain Use Permit Sub-Record 2. Locations -> Confirm the location is accurate to the project. Click “Next” 3. Type -> Fill in the “Square Feet” and “Valuation” boxes with the project area and a contractor-provided cost estimate (See note above: for new structures, input 0). Click “Next” 4. Contacts -> Confirm contacts and add any additional contacts if applicable. Click “Next” 5. More Info -> This will be filled in by the engineer assigned to your case, Click “Next” 6. Attachments -> Please attach the project plan, supporting documentation for the cost estimate (if applicable), and a drainage/hydrology report (if applicable). Click “Next” 7. Signature -> Read the statement and type your name. Sign your name below (You may Enable Type Signature to have the software sign for you.) Click “Next” 8. Review and Submit -> Review all information to ensure accuracy. Click “Submit” Contact Michael Ortiz at michael.ortiz@tucsonaz.gov if you have any questions about the FUP.* --
Solarapp - Installation of 5.74kW PV System with Existing System
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/28/2025 | RESIDENTIAL SOLAR v.1 | 02/27/2025 | APPROVED |
| 07/25/2025 | RESIDENTIAL SOLAR REVISION v.1 | 07/25/2025 | APPROVED |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-SOL-0125-00100
Permite Description: *Revision 1: 07/25/2025* --
*Review 1: 01/28/2025: Due to the fact that this project may be within a regulated floodplain and requires a Floodplain Use Review (FUP.), we have moved this project into a standard 30 Day Review Time Frame. Please start a new FUP at our permit application web page: https://tdc-online.tucsonaz.gov/#/home NOTE: Documentation of a cost estimate will be required for solar installations. The cost estimate must have a cost breakdown, it must include both the cost of materials and the cost of labor, and it may not be a leasing document. Instructions: 1. Navigate into the current project in the “My Work” tab. Within the permit, navigate to the “Sub-Records” tab and click “Apply” on the Floodplain Use Permit Sub-Record 2. Locations -> Confirm the location is accurate to the project. Click “Next” 3. Type -> Fill in the “Square Feet” and “Valuation” boxes with the project area and a contractor-provided cost estimate (See note above: for new structures, input 0). Click “Next” 4. Contacts -> Confirm contacts and add any additional contacts if applicable. Click “Next” 5. More Info -> This will be filled in by the engineer assigned to your case, Click “Next” 6. Attachments -> Please attach the project plan, supporting documentation for the cost estimate (if applicable), and a drainage/hydrology report (if applicable). Click “Next” 7. Signature -> Read the statement and type your name. Sign your name below (You may Enable Type Signature to have the software sign for you.) Click “Next” 8. Review and Submit -> Review all information to ensure accuracy. Click “Submit” Contact Michael Ortiz at michael.ortiz@tucsonaz.gov if you have any questions about the FUP.* --
Solarapp - Installation of 5.74kW PV System with Existing System
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/08/2025 | BULD - Electrical Clearance | N/A | Partial Pass | 10/08/25 TEP CLEARANCE: DGL, verbal clearance. Called TEP @ 11:42. Partial, pending solar. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-SOL-0125-00100
Permit Description: *Revision 1: 07/25/2025* --
*Review 1: 01/28/2025: Due to the fact that this project may be within a regulated floodplain and requires a Floodplain Use Review (FUP.), we have moved this project into a standard 30 Day Review Time Frame. Please start a new FUP at our permit application web page: https://tdc-online.tucsonaz.gov/#/home NOTE: Documentation of a cost estimate will be required for solar installations. The cost estimate must have a cost breakdown, it must include both the cost of materials and the cost of labor, and it may not be a leasing document. Instructions: 1. Navigate into the current project in the “My Work” tab. Within the permit, navigate to the “Sub-Records” tab and click “Apply” on the Floodplain Use Permit Sub-Record 2. Locations -> Confirm the location is accurate to the project. Click “Next” 3. Type -> Fill in the “Square Feet” and “Valuation” boxes with the project area and a contractor-provided cost estimate (See note above: for new structures, input 0). Click “Next” 4. Contacts -> Confirm contacts and add any additional contacts if applicable. Click “Next” 5. More Info -> This will be filled in by the engineer assigned to your case, Click “Next” 6. Attachments -> Please attach the project plan, supporting documentation for the cost estimate (if applicable), and a drainage/hydrology report (if applicable). Click “Next” 7. Signature -> Read the statement and type your name. Sign your name below (You may Enable Type Signature to have the software sign for you.) Click “Next” 8. Review and Submit -> Review all information to ensure accuracy. Click “Submit” Contact Michael Ortiz at michael.ortiz@tucsonaz.gov if you have any questions about the FUP.* --
Solarapp - Installation of 5.74kW PV System with Existing System
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/28/2025 | COT - RSOL - Electrical Final Solar Project | Passed |