Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel Search

 
Parcel Attributes
Parcel140362510
City of Tucson ZoningPAD-21
Tucson WardWard 5
Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address

Rezoning Cases

Date - 11/15/2024 7:54 a.m.
Total Number Of Rezone Cases - (1)
Case No. Description New Zone Status Status Date Address
C9-12-03 Valencia Crossing PAD PAD Effectuated 02/14/2012 E JULIAN WASH

Permits

Parcel Number - 140362510
Date - 11/15/2024 7:54 a.m.
Total Number Of Permits - (4)
Permit Permit Status Entered Date Expired Date Unit Type Description
TR-ANN-0124-00042 Complete 01/19/2024 01/22/2025 Right-of-Way (ROW) - Annual Driveway pad/ sidewalk installation of lot # 65 (SFR MERI156021 T21-M0063) Approximately 40' of sidewalk and driveway apron
TC-RES-0824-04566 Issued 08/05/2024 03/17/2025 Residential Building - One or Two Family INSTALLATION OF NEW PHOTOVOLTAIC SYSTEM (10.92kW DC, 9.10kW AC) CONSISTING OF 28 MEYER BERGER SOLAR MODULES (390W) AND 28 ENPHASE MICRO-INVERTERS (240V).<br /> UTILITY GRID INTERCONNECTION SHALL BE ACHIEVED VIA BACK-FED BREAKER.
TC-SOL-0824-00428 Void 08/22/2024 02/18/2025 Solar There is an existing permit (TC-RES-0824-04566) for solar at this address. The property owner needs to contact building_official@tucsonaz.gov to have the permit withdrawn. The property owner will need to provide a letter of documentation in the email stating that they are the property owner and show proof that they are indeed the property owner to be added to the existing permit if they are not currently attached to the existing permit. Once they have been added to the existing permit they may process the withdrawal of the existing permit. Please note: no withdrawal will be processed if fees are due. If there are fees due, they must be paid prior to any withdrawal of the permit. Once the withdrawal of the existing permit has been processed, the hold will be removed from the SolarApp permit and it will be processed in a timely manner. If you have any questions about this, please email building_offcial@tucsonaz.gov Residential installation of a 20.280kW DC, 16.900kW AC rooftop solar system. New 175A derate main breaker on an existing 225A main service panel.
TC-MDP-0523-01016 Complete 09/12/2023 03/16/2025 Model Building Permit SFR MERI156021 T21-M0063