Permit: TC-MDP-0523-01016
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
4840 E JULIAN WASH DR
Address NEW:
4840 E JULIAN WASH DR
Apply Date:
09/12/2023
Applicant:
Description:
SFR MERI156021 T21-M0063
Permit Reviews
Permit Number - TC-MDP-0523-01016
Permit Status: Complete
Permit Description: SFR MERI156021 T21-M0063
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/16/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/17/2024 | APPROVED |
| 09/12/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 09/14/2023 | APPROVED |
Conditions
Permit Number - TC-MDP-0523-01016
Permit Status: Complete
Permit Description: SFR MERI156021 T21-M0063
| Date | Description | Comments |
|---|---|---|
| 09/12/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 09/12/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 09/12/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 09/12/2023 | Post-Tension Inspection Report is required. | |
| 05/11/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 09/17/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 09/12/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 09/12/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0523-01016
Permite Description: SFR MERI156021 T21-M0063
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/08/2023 | COT - RSBU - Roof Nailing | N/A | Re-inspection required | 12/8/24 still working on clip and nail |
| 12/08/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Re-inspection required | 12/8/23 still working on home |
| 01/31/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Canceled | Cancelled by Trent. Not ready for inspection. |
| 01/31/2024 | BULD - Electrical Clearance | N/A | Canceled | Cancelled by Trent. Not ready for inspection. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0523-01016
Permit Description: SFR MERI156021 T21-M0063
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/08/2023 | COT - RSPL - Backwater Valve | Passed | Backwater valves have been installed in sewer line to main city sewer. | |
| 11/08/2023 | COT - RSPL - Rough Soil | Passed | Underground plumbing is complete and under a water column test. Okay to shade pipes and backfill trenches. | |
| 11/08/2023 | COT - RSPL - Sewer | Passed | Sewer line from house is connected into the City main sewer line. Okay to shade pipe and backfill trench. | |
| 11/08/2023 | COT - RSPL - Yard Water Line | Passed | Main water supply line is connected to the City water meter and is under pressure with no leaks. Okay to shade pipe and backfill trench. | |
| 11/14/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 11/14/2023 | COT - RSBU - Preslab | Passed | ||
| 11/14/2023 | COT - RSEL - Electrical Underground | Passed | ||
| 11/14/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
| 12/12/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 01/26/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 01/31/2024 | COT - RSPL - Gas Pressure Test | Passed | Gas line is under air pressure at 15#.. | |
| 02/09/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 02/09/2024 | BULD - Electrical Clearance | Passed | ||
| 02/26/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 04/05/2024 | COT - BULD - SWG Clearance | Passed | ||
| 04/22/2024 | COT - RSEL - Electrical Final | Passed | ||
| 04/22/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
| 04/22/2024 | COT - RSME - Mechanical Final | Passed | ||
| 04/22/2024 | COT - RSPL - Plumbing Final | Passed | ||
| 04/22/2024 | RSBU - Building Final | Passed | ||
| 04/22/2024 | RSBU - Building Progress | Passed | ||
| 04/22/2024 | ENGR Engineering Final | Passed | everything looks good, no issues |