Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Parcel Search: 140280030
Parcel Search
Annexations & Original City Zoning (OCZ)
Date - 11/23/2024 11:30 a.m.
Total Number Of OZC Plans - (1)
Special Development Requests & Requirements
Date - 11/23/2024 11:30 a.m.
Total Number Of Special Development Permits - (1)
Activity Number | Status | Apply Date | Expired Date | Type | Description |
---|---|---|---|---|---|
H000005827 | Closed | N/A | RECORD TO SHOW BILLBOARD AZ488/CLEAR CHANNEL #301 REMOVED DUE TO STORM DAMAGE |
Permits
Parcel Number - 140280030
Date - 11/23/2024 11:30 a.m.
Total Number Of Permits - (595)
Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
DP21-0008 | Complete | 01/11/2021 | 04/24/2022 | Development Package | SITE - CAID, Meter 4, solar photovoltaic shade canopy. | |
DP21-0032 | Complete | 02/02/2021 | 01/24/2023 | Development Package | SITE - CAID, Meter 3, solar parking canopies. | |
TR-ROW-0323-00502 | Complete | 03/16/2023 | 05/10/2023 | Right-of-Way (ROW) | Perform 7-inch diameter soil borings to depths of approximately 3 feet below existing site grade along Bilby Road between 12th Avenue and Country Club Road to obtain soil samples for a pavement section design | |
TR-ROW-0323-00502 | Complete | 03/16/2023 | 05/10/2023 | BLDG 6 UNIT 6106 | Right-of-Way (ROW) | Perform 7-inch diameter soil borings to depths of approximately 3 feet below existing site grade along Bilby Road between 12th Avenue and Country Club Road to obtain soil samples for a pavement section design |
TR-ROW-0323-00502 | Complete | 03/16/2023 | 05/10/2023 | UNIT 12 | Right-of-Way (ROW) | Perform 7-inch diameter soil borings to depths of approximately 3 feet below existing site grade along Bilby Road between 12th Avenue and Country Club Road to obtain soil samples for a pavement section design |
TR-ROW-0323-00502 | Complete | 03/16/2023 | 05/10/2023 | UNIT 36 | Right-of-Way (ROW) | Perform 7-inch diameter soil borings to depths of approximately 3 feet below existing site grade along Bilby Road between 12th Avenue and Country Club Road to obtain soil samples for a pavement section design |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project | |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 0 UNIT 1 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 0 UNIT 2 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 0 UNIT 3 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 0 UNIT 4 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1105 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1106 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1107 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1108 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1201 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1202 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1203 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1204 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1205 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1206 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1207 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1208 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1301 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1302 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1303 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1304 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1305 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1306 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1307 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1308 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 10 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 10 UNIT 10101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 10 UNIT 10102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 10 UNIT 10103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 10 UNIT 10104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 100 UNIT 150 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 100 UNIT 170 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11105 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11106 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11107 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11108 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11201 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11202 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11203 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11204 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11205 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11206 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11207 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11208 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11301 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11302 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11303 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11304 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11305 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11306 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11307 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11308 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12105 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12106 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12107 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12108 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12201 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12202 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12203 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12204 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12205 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12206 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12207 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12208 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12301 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12302 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12303 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12304 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12305 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12306 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12307 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12308 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13105 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13106 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13107 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13108 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13201 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13202 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13203 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13204 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13205 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13206 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13207 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13208 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13301 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13302 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13303 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13304 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13305 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13306 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13307 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13308 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 14 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 14 UNIT 14101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 14 UNIT 14102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 14 UNIT 14103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 14 UNIT 14104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 15 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 15 UNIT 15101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 15 UNIT 15102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 15 UNIT 15103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 15 UNIT 15104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 16 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 16 UNIT 16101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 16 UNIT 16102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 16 UNIT 16103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 16 UNIT 16104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 17 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 17 UNIT 17101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 17 UNIT 17102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 17 UNIT 17103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 17 UNIT 17104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 18 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 18 UNIT 18101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 18 UNIT 18102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 18 UNIT 18103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 18 UNIT 18104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 19 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 19 UNIT 19101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 19 UNIT 19102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 19 UNIT 19103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 19 UNIT 19104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2105 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2106 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2107 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2108 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2201 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2202 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2203 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2204 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2205 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2206 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2207 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2208 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2301 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2302 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2303 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2304 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2305 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2306 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2307 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2308 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 20 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 20 UNIT 20101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 20 UNIT 20102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 20 UNIT 20103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 20 UNIT 20104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 200 UNIT 240 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 21 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 21 UNIT 21101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 21 UNIT 21102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 21 UNIT 21103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 21 UNIT 21104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 22 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 22 UNIT 22101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 22 UNIT 22102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 22 UNIT 22103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 22 UNIT 22104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 23 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 23 UNIT 23101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 23 UNIT 23102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 23 UNIT 23103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 23 UNIT 23104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 24 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 24 UNIT 24101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 24 UNIT 24102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 24 UNIT 24103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 24 UNIT 24104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 25 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 25 UNIT 25101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 25 UNIT 25102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 25 UNIT 25103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 25 UNIT 25104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 26 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 26 UNIT 26101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 26 UNIT 26102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 26 UNIT 26103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 26 UNIT 26104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 27 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 27 UNIT 27101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 27 UNIT 27102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 27 UNIT 27103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 27 UNIT 27104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 28 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 28 UNIT 28101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 28 UNIT 28102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 28 UNIT 28103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 28 UNIT 28104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 29 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 29 UNIT 29101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 29 UNIT 29102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 29 UNIT 29103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 29 UNIT 29104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3105 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3106 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3107 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3108 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3201 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3202 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3203 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3204 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3205 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3206 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3207 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3208 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3301 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3302 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3303 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3304 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3305 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3306 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3307 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3308 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 30 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 30 UNIT 30101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 30 UNIT 30102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 30 UNIT 30103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 30 UNIT 30104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 31 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 31 UNIT 31101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 31 UNIT 31102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 31 UNIT 31103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 31 UNIT 31104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 32 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 32 UNIT 32101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 32 UNIT 32102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 32 UNIT 32103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 32 UNIT 32104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 33 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 33 UNIT 33101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 33 UNIT 33102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 33 UNIT 33103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 33 UNIT 33104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 34 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 34 UNIT 34101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 34 UNIT 34102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 34 UNIT 34103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 34 UNIT 34104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 35 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 35 UNIT 35101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 35 UNIT 35102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 35 UNIT 35103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 35 UNIT 35104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 36 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 36 UNIT 36101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 36 UNIT 36102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 36 UNIT 36103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 36 UNIT 36104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 37 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 37 UNIT 37101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 37 UNIT 37102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 37 UNIT 37103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 37 UNIT 37104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 38 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 38 UNIT 38101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 38 UNIT 38102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 38 UNIT 38103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 38 UNIT 38104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 39 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4105 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4106 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4107 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4108 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4201 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4202 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4203 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4204 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4205 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4206 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4207 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4208 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4301 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4302 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4303 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4304 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4305 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4306 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4307 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4308 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5105 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5106 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5107 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5108 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5201 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5202 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5203 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5204 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5205 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5206 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5207 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5208 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5301 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5302 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5303 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5304 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5305 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5306 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5307 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5308 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6105 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6106 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6107 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6108 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6201 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6202 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6203 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6204 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6205 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6206 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6207 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6208 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6301 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6302 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6303 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6304 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6305 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6306 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6307 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6308 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7105 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7106 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7107 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7108 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7201 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7202 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7203 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7204 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7205 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7206 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7207 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7208 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7301 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7302 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7303 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7304 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7305 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7306 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7307 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7308 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8105 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8106 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8107 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8108 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8201 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8202 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8203 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8204 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8205 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8206 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8207 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8208 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8301 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8302 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8303 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8304 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8305 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8306 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8307 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8308 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10105 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10106 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10107 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10108 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10201 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10202 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10203 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10204 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10205 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10206 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10207 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10208 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10301 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10302 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10303 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10304 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10305 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10306 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10307 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10308 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9105 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9106 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9107 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9108 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9201 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9202 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9203 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9204 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9205 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9206 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9207 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9208 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9301 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9302 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9303 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9304 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9305 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9306 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9307 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9308 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG A | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG B | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG C | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG C UNIT 300 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 1 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 10 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 100 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 11 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 110 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 12 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 13 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 14 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 15 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 150 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 15A | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 16 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 16A | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 16B | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 17 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 18 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 180 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 19 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 2 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 20 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 21 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 22 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 23 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 24 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 25 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 26 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 27 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 28 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 29 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 3 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 31 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 32 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 33 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 34 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 35 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 36 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 38 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 39 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 4 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 40 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 41 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 42 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 43 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 44 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 45 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 46 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 47 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 48 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 49 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 5 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 51 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 52 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 53 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 54 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 56 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 6 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 7 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 8 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 9 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT A | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT B | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT C | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT D | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT E | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT F | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT G | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT H | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT I | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT J | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT K | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT L | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT M | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT N | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT O | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT P | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT Q | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT R | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT S | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT T | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT U | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT V | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT W | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT X | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT Y | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
T19RW07513 | Approved | 12/12/2019 | N/A | Right-of-Way (ROW) | Non-construction permit. This permit serves as City of Tucson approval of the Lighting Service Plan; Work Order: 6269865 | |
TC-COM-1223-02816 | Issued | 12/12/2023 | 08/19/2024 | Commercial Building | New water line | |
P96AN00033 | Issued | 09/09/1996 | N/A | ADDRNEW | ||
T00ME01122 | Final | 10/16/2000 | 12/23/2000 | MECH | PRESSURE VESSEL INSPECTION: TUC-24218, 23374 | |
T01BU02602 | Final | 09/06/2001 | 03/10/2002 | SPKLR | FIRE:SPKR:RELOCATE 1 & ADD 1 | |
T02AN00623 | Issued | 07/10/2002 | N/A | ADDRNEW | ||
T03EL01772 | Final | 09/02/2003 | 08/15/2005 | ELECT | SERVICE:ELECTRIC FOR AIR COMPRESSOR | |
T03PL00396 | Final | 02/28/2003 | 11/04/2003 | PLUMB | INSTALL:NEW GAS LINE & METER | |
T04BU01992 | Final | 08/11/2004 | 02/15/2005 | SPKLR | FIRE SPKR:ADD 9 | |
T04EX01051 | Closed | 11/04/2004 | 01/03/2005 | EXCAV | EXCAV:80 LF TRENCH FOR ELECTRIC CONDUIT | |
T06BU01459 | Closed | 06/09/2006 | 04/01/2007 | SPKLR | FIRE SPRINKLER: 10 NEW, 16 RELOCATE | |
T06BU01462 | Closed | 06/09/2006 | 12/12/2006 | SPKLR | FIRE SPRINKLERS: ADD 15' OF 4" PIPE | |
T06BU01902 | Final | 08/01/2006 | 03/21/2007 | SPKLR | FIRE SPRINKLER: ADD 90'0" NEW 6" UNDERGROUND PIPIING ADD 160 NEW FIRE SPRINKLERS | |
T08BU01117 | Closed | 06/17/2008 | 06/27/2009 | SPKLR | Relocate 1 fire sprinkler | |
T08BU01120 | Final | 06/17/2008 | 12/24/2008 | SPKLR | Install 34 fire sprinklers | |
T08BU01862 | Expired | 10/16/2008 | 07/07/2011 | SPKLR | Install 7 new fire sprinkler heads. | |
T08EL02029 | Final | 10/24/2008 | 05/19/2009 | ELECT | UPGRADE: 800 AMP TO 1200 AMP | |
T09BU00940 | Expired | 06/26/2009 | 06/26/2011 | SPKLR | INSTALL 1 NEW FIRE SPRINKLER HEAD. | |
T09BU01246 | Final | 08/21/2009 | 02/28/2010 | SPKLR | Install 20 fire sprinklers | |
T11BU00255 | Final | 02/24/2011 | 05/16/2012 | SPKLR | INSTALL 6 NEW FIRE SPRINKLERS AND REPLACE 14. | |
T11BU01391 | Final | 10/20/2011 | 09/04/2012 | GRADSWPP | GRADING | |
T13BU00616 | Final | 05/29/2013 | 12/08/2013 | SPKLR | SPRINKLERS | |
T14BU00328 | Withdrwn | 03/26/2014 | N/A | TANKS | REMOVE/REPLACE PROPANE TANKS | |
T17CM02627 | Expired | 04/05/2017 | 10/02/2017 | COMBO | REPL 400AMP DISCONNECT WITH IR HOT SPOT | |
T19RW02596 | Final | 05/08/2019 | 07/05/2019 | ROW | N.523606 JOB WILL REQUIRE ACCESS TO HH # 14866 AND MH # 15434 TO SPLICE FIBER ADDRESS ON APPLICATION- 2469 E BILBY | |
T19RW04155 | Final | 07/26/2019 | 11/25/2019 | ROW | JOB WILL REQUIRE 161' BORE, 1,358 AERIAL CABLE PLACEMENT, 11' TRENCHING AND PLACEMENT OF 2 NEW 3048 HH's. | |
T19RW05983 | Final | 10/10/2019 | 12/09/2019 | ROW | JOB WILL REQUIRE 161' BORE. 1358 AERIAL CABLE PLACEMENT, 11' TRENCHING AND PLACEMENT OF 2 NEW 3048 HH A NOTICE OF TEMPORARY HOLIDAY RESTRICTION APPLIES TO THIS PERMIT AND WILL BE IN EFFECT FROM THANKSGIVING DAY TO JANUARY 2. DUE TO THE INCREASING TRAFFIC VOLUME ON MANY OF THE CITY'S ROADS, IT IS NECESSARY TO RESTRICT LANE CLOSURES ON CERTAIN ROADS DURING THE HOLIDAY SEASON. | |
T19RW07138 | Final | 11/21/2019 | 12/26/2019 | ROW | TEP WILL BE INSTALLING A NEW SINGLE PHASE TRANSFORMER ON POLE #11 ADDRESS ON THE APPLICATION IS 2350 E BILBY RD. | |
T20RW00914 | Final | 02/12/2020 | 05/26/2020 | ROW | SEWER REHABILITATION NO EXCAVATION | |
T20RW03120 | Final | 06/02/2020 | 10/13/2020 | ROW | N.734984 JOB WILL REQUIRE 10' OF TRENCHING AND 16SQFT OF ASPHALT REMOVAL/REPLACEMENT AND ACCESS TO HH#'S 2201 AND 15208 TO SPLICE FIBER | |
T20RW05269 | Final | 09/29/2020 | 03/28/2021 | ROW | TEP WILL BE INSTALLING 3 CONCRETE POLES IN ELECTRICAL UTILITY EASEMENT FOR DUSK TO DAWN LIGHTING. TRUCKS WILL WE PARKED R.O.W. WITH NO LANE CLOSURES NECESSARY NOTE: GANLEY RD, SEARS BL & BILBY RD is under a pavement moratorium, any new asphalt that is disturbed will require a 2” mill and overlay for 50’ in each direction from the outside of the cut for all effected travel lanes. | |
T21CM04889 | Final | 06/11/2021 | 02/20/2022 | COMBO | Adding air compressor # 2 and providing signage as follows, "THIS EQUIPMENT SHALL NOT OPERATE IN CONJUNCTION WITH AIR COMPRESSOR # 1. ONLY A QUALIFIED ELECTRICIAN SHALL PUT THIS EQUIPMENT INTO/OUT OF SERVICE." | |
T22CM01222 | L of c | 02/17/2022 | 01/24/2023 | COMBO | 325kW AC Photovoltaic Parking Canopy Installation | |
T22RW02030 | Final | 06/01/2022 | 08/12/2022 | ROW | Installation of (2) 3" SCH 40 PVC conduit, (1) 3/4" SCH 40 PVC conduit and, (1) 1" SCH 40 PVC conduit to house electrical and data cables. Related to DP21-0032 | |
T96EX00607 | Closed | 12/26/1996 | 02/24/1997 | EXCAV | LANDSCAPING | |
T97BU00429 | Final | 04/10/1997 | 11/04/1997 | SPKLR | FIRE SPKR:ADD 8 | |
T99CM02063 | Final | 04/29/1999 | 05/21/2000 | COMBO | STORAGE BUILDING | |
T99EL03093 | Closed | 11/29/1999 | 05/27/2000 | ELECT | SIGNS:CIRCUIT:TS199911-152 |