Address Search: 2275 E GANLEY RD
Search
Annexations & Original City Zoning (OCZ)
Address: 2275 E GANLEY RD
Date - 12/25/2024 6:33 p.m.
Total Number Of Annexations & Original City Zoning (1)
Special Development Requests & Requirements
Address: 2275 E GANLEY RD
Date - 12/25/2024 6:33 p.m.
Total Number Of Special Development Permits - (1)
Activity Number | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
H000005827 | CLOSED | 06/11/2014 | N/A | Historical Information | RECORD TO SHOW BILLBOARD AZ488/CLEAR CHANNEL #301 REMOVED DUE TO STORM DAMAGE |
Permits
Address: 2275 E GANLEY RD
Date - 12/25/2024 6:33 p.m.
Total Number Of Permits - (35)
Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TC-COM-1223-02816 | Issued | 12/12/2023 | 08/19/2024 | Commercial Building | New water line | |
T19RW07513 | Approved | 12/12/2019 | N/A | Right-of-Way (ROW) | Non-construction permit. This permit serves as City of Tucson approval of the Lighting Service Plan; Work Order: 6269865 | |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project | |
DP21-0032 | Complete | 02/02/2021 | 01/24/2023 | Development Package | SITE - CAID, Meter 3, solar parking canopies. | |
P96AN00033 | ISSUED | 09/09/1996 | N/A | ADDRNEW | ||
T00ME01122 | FINAL | 10/16/2000 | 12/23/2000 | MECH | PRESSURE VESSEL INSPECTION: TUC-24218, 23374 | |
T01BU02602 | FINAL | 09/06/2001 | 03/10/2002 | SPKLR | FIRE:SPKR:RELOCATE 1 & ADD 1 | |
T03PL00396 | FINAL | 02/28/2003 | 11/04/2003 | PLUMB | INSTALL:NEW GAS LINE & METER | |
T04BU01992 | FINAL | 08/11/2004 | 02/15/2005 | SPKLR | FIRE SPKR:ADD 9 | |
T06BU01459 | CLOSED | 06/09/2006 | 04/01/2007 | SPKLR | FIRE SPRINKLER: 10 NEW, 16 RELOCATE | |
T06BU01462 | CLOSED | 06/09/2006 | 12/12/2006 | SPKLR | FIRE SPRINKLERS: ADD 15' OF 4" PIPE | |
T06BU01902 | FINAL | 08/01/2006 | 03/21/2007 | SPKLR | FIRE SPRINKLER: ADD 90'0" NEW 6" UNDERGROUND PIPIING ADD 160 NEW FIRE SPRINKLERS | |
T08BU01117 | CLOSED | 06/17/2008 | 06/27/2009 | SPKLR | Relocate 1 fire sprinkler | |
T08BU01120 | FINAL | 06/17/2008 | 12/24/2008 | SPKLR | Install 34 fire sprinklers | |
T08BU01862 | EXPIRED | 10/16/2008 | 07/07/2011 | SPKLR | Install 7 new fire sprinkler heads. | |
T08EL02029 | FINAL | 10/24/2008 | 05/19/2009 | ELECT | UPGRADE: 800 AMP TO 1200 AMP | |
T09BU00940 | EXPIRED | 06/26/2009 | 06/26/2011 | SPKLR | INSTALL 1 NEW FIRE SPRINKLER HEAD. | |
T09BU01246 | FINAL | 08/21/2009 | 02/28/2010 | SPKLR | Install 20 fire sprinklers | |
T11BU00255 | FINAL | 02/24/2011 | 05/16/2012 | SPKLR | INSTALL 6 NEW FIRE SPRINKLERS AND REPLACE 14. | |
T11BU01391 | FINAL | 10/20/2011 | 09/04/2012 | GRADSWPP | GRADING | |
T13BU00616 | FINAL | 05/29/2013 | 12/08/2013 | SPKLR | SPRINKLERS | |
T14BU00328 | WITHDRWN | 03/26/2014 | N/A | TANKS | REMOVE/REPLACE PROPANE TANKS | |
T17CM02627 | EXPIRED | 04/05/2017 | 10/02/2017 | COMBO | REPL 400AMP DISCONNECT WITH IR HOT SPOT | |
T19RW04155 | FINAL | 07/26/2019 | 11/25/2019 | ROW | JOB WILL REQUIRE 161' BORE, 1,358 AERIAL CABLE PLACEMENT, 11' TRENCHING AND PLACEMENT OF 2 NEW 3048 HH's. | |
T19RW05983 | FINAL | 10/10/2019 | 12/09/2019 | ROW | JOB WILL REQUIRE 161' BORE. 1358 AERIAL CABLE PLACEMENT, 11' TRENCHING AND PLACEMENT OF 2 NEW 3048 HH A NOTICE OF TEMPORARY HOLIDAY RESTRICTION APPLIES TO THIS PERMIT AND WILL BE IN EFFECT FROM THANKSGIVING DAY TO JANUARY 2. DUE TO THE INCREASING TRAFFIC VOLUME ON MANY OF THE CITY'S ROADS, IT IS NECESSARY TO RESTRICT LANE CLOSURES ON CERTAIN ROADS DURING THE HOLIDAY SEASON. | |
T20RW03120 | FINAL | 06/02/2020 | 10/13/2020 | ROW | N.734984 JOB WILL REQUIRE 10' OF TRENCHING AND 16SQFT OF ASPHALT REMOVAL/REPLACEMENT AND ACCESS TO HH#'S 2201 AND 15208 TO SPLICE FIBER | |
T20RW05269 | FINAL | 09/29/2020 | 03/28/2021 | ROW | TEP WILL BE INSTALLING 3 CONCRETE POLES IN ELECTRICAL UTILITY EASEMENT FOR DUSK TO DAWN LIGHTING. TRUCKS WILL WE PARKED R.O.W. WITH NO LANE CLOSURES NECESSARY NOTE: GANLEY RD, SEARS BL & BILBY RD is under a pavement moratorium, any new asphalt that is disturbed will require a 2” mill and overlay for 50’ in each direction from the outside of the cut for all effected travel lanes. | |
T22CM01222 | L OF C | 02/17/2022 | 01/24/2023 | COMBO | 325kW AC Photovoltaic Parking Canopy Installation | |
T22RW02030 | FINAL | 06/01/2022 | 08/12/2022 | ROW | Installation of (2) 3" SCH 40 PVC conduit, (1) 3/4" SCH 40 PVC conduit and, (1) 1" SCH 40 PVC conduit to house electrical and data cables. Related to DP21-0032 | |
T96EX00607 | CLOSED | 12/26/1996 | 02/24/1997 | EXCAV | LANDSCAPING | |
T97BU00429 | FINAL | 04/10/1997 | 11/04/1997 | SPKLR | FIRE SPKR:ADD 8 | |
T99CM02063 | FINAL | 04/29/1999 | 05/21/2000 | COMBO | STORAGE BUILDING | |
T99EL03093 | CLOSED | 11/29/1999 | 05/27/2000 | ELECT | SIGNS:CIRCUIT:TS199911-152 | |
TUC-23374 | CERTIFIC | 06/17/1997 | 06/26/2003 | VESSEL | ||
TUC-24218 | CERTIFIC | 07/01/1997 | 06/26/2003 | VESSEL |