Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel Search

 
Parcel Attributes
Parcel14022003J
JurisdictionTucson
City of Tucson ZoningR-3
Tucson WardWard 5
Major Streets & Routes

Arterial or Collector

,

Intersection Buffer

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address

Annexations & Original City Zoning (OCZ)

Date - 12/23/2024 11:48 a.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-60-39 West To Silverbell Road And South To San Xavier Indian Reservation 2014 03/18/1960 2045

Rezoning Cases

Date - 12/23/2024 11:48 a.m.
Total Number Of Rezone Cases - (1)
Case No. Description New Zone Status Status Date Address
C9-85-62 Pima Savings - Bilby Road R-3 Effectuated 05/20/2010 S CAMPBELL

Special Development Requests & Requirements

Date - 12/23/2024 11:48 a.m.
Total Number Of Special Development Permits - (6)
Activity Number Status Apply Date Expired Date Type Description
H000011226 Closed N/A
T13SA00156 Complete N/A
T15SA00238 Complete N/A
T16SA00425 Complete N/A
T20SA00021 Complete N/A ZONING LETTER
T22SA00434 Complete N/A Zoning Compliance Letter for Multifamily

Permits

Parcel Number - 14022003J
Date - 12/23/2024 11:48 a.m.
Total Number Of Permits - (594)
Permit Permit Status Entered Date Expired Date Unit Type Description
TR-UTL-0324-00435 Complete 03/04/2024 08/18/2024 BLDG 1 Right-of-Way (ROW) - Utility PRJ265729-1 Cox to Place new PED and transfer riser to new pole.
TR-ROW-0323-00502 Complete 03/16/2023 05/10/2023 Right-of-Way (ROW) Perform 7-inch diameter soil borings to depths of approximately 3 feet below existing site grade along Bilby Road between 12th Avenue and Country Club Road to obtain soil samples for a pavement section design
TR-ROW-0323-00502 Complete 03/16/2023 05/10/2023 BLDG 6 UNIT 6106 Right-of-Way (ROW) Perform 7-inch diameter soil borings to depths of approximately 3 feet below existing site grade along Bilby Road between 12th Avenue and Country Club Road to obtain soil samples for a pavement section design
TR-ROW-0323-00502 Complete 03/16/2023 05/10/2023 UNIT 12 Right-of-Way (ROW) Perform 7-inch diameter soil borings to depths of approximately 3 feet below existing site grade along Bilby Road between 12th Avenue and Country Club Road to obtain soil samples for a pavement section design
TR-ROW-0323-00502 Complete 03/16/2023 05/10/2023 UNIT 36 Right-of-Way (ROW) Perform 7-inch diameter soil borings to depths of approximately 3 feet below existing site grade along Bilby Road between 12th Avenue and Country Club Road to obtain soil samples for a pavement section design
TC-COM-0424-00666 Issued 04/12/2024 10/12/2024 BLDG 6 UNIT 6306 Commercial Building Electrical reconnect
TC-RES-0524-03219 Void 05/28/2024 N/A BLDG 8 UNIT 8207 Residential Building - One or Two Family VOID:YL - Unable to process, incorrect permit type. A property with more than 2 units is multi-family and considered to be commercial. Please re-apply under "Commercial Trade Permit" and utilize the commercial reconnect form linked below. Commercial reconnect Form: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/commercial-permits/electrical-reconnect-information-sheet-commercial.pdf For questions: Building_Official@tucsonaz.gov -reconnect Eletric
TC-RES-0624-03474 Void 06/10/2024 N/A BLDG 7 UNIT 7202 Residential Building - One or Two Family VOID:YL - Unable to process, incorrect permit type. A property with more than 2 units is multi-family and considered to be commercial. Please re-apply under "Commercial Trade Permit" and utilize the commercial reconnect form linked below. Commercial reconnect Form: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/commercial-permits/electrical-reconnect-information-sheet-commercial.pdf For questions: Building_Official@tucsonaz.gov ** -ELECTRIC RECONNECT
TC-RES-0624-03476 Void 06/10/2024 N/A BLDG 8 UNIT 8207 Residential Building - One or Two Family VOID:YL - Unable to process, incorrect permit type. A property with more than 2 units is multi-family and considered to be commercial. Please re-apply under "Commercial Trade Permit" and utilize the commercial reconnect form linked below. Commercial reconnect Form: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/commercial-permits/electrical-reconnect-information-sheet-commercial.pdf For questions: Building_Official@tucsonaz.gov -RECONNECT ELETRIC
TC-RES-0624-03498 Issued 06/10/2024 02/16/2025 BLDG 7 UNIT 7202 Residential Building - One or Two Family ELECTRIC RECINNECT
TC-RES-0624-03499 Complete 06/10/2024 02/11/2025 BLDG 8 UNIT 8207 Residential Building - One or Two Family ELECTRIC RECONNECT
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 0 UNIT 1 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 0 UNIT 2 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 0 UNIT 3 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 0 UNIT 4 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1105 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1106 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1107 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1108 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1201 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1202 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1203 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1204 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1205 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1206 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1207 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1208 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1301 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1302 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1303 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1304 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1305 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1306 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1307 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 1 UNIT 1308 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 10 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 10 UNIT 10101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 10 UNIT 10102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 10 UNIT 10103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 10 UNIT 10104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 100 UNIT 150 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 100 UNIT 170 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11105 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11106 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11107 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11108 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11201 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11202 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11203 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11204 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11205 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11206 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11207 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11208 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11301 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11302 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11303 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11304 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11305 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11306 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11307 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 11 UNIT 11308 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12105 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12106 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12107 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12108 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12201 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12202 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12203 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12204 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12205 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12206 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12207 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12208 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12301 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12302 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12303 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12304 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12305 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12306 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12307 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 12 UNIT 12308 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13105 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13106 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13107 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13108 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13201 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13202 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13203 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13204 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13205 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13206 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13207 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13208 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13301 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13302 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13303 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13304 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13305 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13306 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13307 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 13 UNIT 13308 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 14 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 14 UNIT 14101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 14 UNIT 14102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 14 UNIT 14103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 14 UNIT 14104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 15 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 15 UNIT 15101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 15 UNIT 15102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 15 UNIT 15103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 15 UNIT 15104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 16 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 16 UNIT 16101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 16 UNIT 16102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 16 UNIT 16103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 16 UNIT 16104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 17 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 17 UNIT 17101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 17 UNIT 17102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 17 UNIT 17103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 17 UNIT 17104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 18 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 18 UNIT 18101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 18 UNIT 18102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 18 UNIT 18103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 18 UNIT 18104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 19 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 19 UNIT 19101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 19 UNIT 19102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 19 UNIT 19103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 19 UNIT 19104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2105 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2106 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2107 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2108 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2201 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2202 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2203 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2204 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2205 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2206 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2207 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2208 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2301 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2302 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2303 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2304 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2305 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2306 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2307 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 2 UNIT 2308 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 20 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 20 UNIT 20101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 20 UNIT 20102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 20 UNIT 20103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 20 UNIT 20104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 200 UNIT 240 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 21 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 21 UNIT 21101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 21 UNIT 21102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 21 UNIT 21103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 21 UNIT 21104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 22 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 22 UNIT 22101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 22 UNIT 22102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 22 UNIT 22103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 22 UNIT 22104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 23 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 23 UNIT 23101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 23 UNIT 23102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 23 UNIT 23103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 23 UNIT 23104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 24 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 24 UNIT 24101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 24 UNIT 24102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 24 UNIT 24103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 24 UNIT 24104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 25 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 25 UNIT 25101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 25 UNIT 25102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 25 UNIT 25103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 25 UNIT 25104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 26 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 26 UNIT 26101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 26 UNIT 26102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 26 UNIT 26103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 26 UNIT 26104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 27 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 27 UNIT 27101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 27 UNIT 27102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 27 UNIT 27103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 27 UNIT 27104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 28 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 28 UNIT 28101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 28 UNIT 28102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 28 UNIT 28103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 28 UNIT 28104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 29 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 29 UNIT 29101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 29 UNIT 29102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 29 UNIT 29103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 29 UNIT 29104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3105 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3106 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3107 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3108 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3201 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3202 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3203 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3204 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3205 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3206 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3207 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3208 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3301 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3302 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3303 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3304 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3305 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3306 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3307 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 3 UNIT 3308 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 30 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 30 UNIT 30101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 30 UNIT 30102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 30 UNIT 30103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 30 UNIT 30104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 31 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 31 UNIT 31101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 31 UNIT 31102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 31 UNIT 31103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 31 UNIT 31104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 32 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 32 UNIT 32101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 32 UNIT 32102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 32 UNIT 32103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 32 UNIT 32104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 33 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 33 UNIT 33101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 33 UNIT 33102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 33 UNIT 33103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 33 UNIT 33104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 34 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 34 UNIT 34101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 34 UNIT 34102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 34 UNIT 34103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 34 UNIT 34104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 35 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 35 UNIT 35101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 35 UNIT 35102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 35 UNIT 35103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 35 UNIT 35104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 36 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 36 UNIT 36101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 36 UNIT 36102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 36 UNIT 36103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 36 UNIT 36104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 37 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 37 UNIT 37101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 37 UNIT 37102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 37 UNIT 37103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 37 UNIT 37104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 38 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 38 UNIT 38101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 38 UNIT 38102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 38 UNIT 38103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 38 UNIT 38104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 39 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4105 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4106 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4107 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4108 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4201 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4202 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4203 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4204 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4205 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4206 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4207 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4208 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4301 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4302 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4303 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4304 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4305 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4306 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4307 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 4 UNIT 4308 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5105 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5106 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5107 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5108 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5201 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5202 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5203 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5204 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5205 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5206 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5207 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5208 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5301 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5302 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5303 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5304 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5305 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5306 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5307 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 5 UNIT 5308 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6105 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6106 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6107 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6108 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6201 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6202 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6203 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6204 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6205 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6206 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6207 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6208 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6301 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6302 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6303 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6304 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6305 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6306 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6307 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 6 UNIT 6308 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7105 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7106 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7107 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7108 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7201 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7202 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7203 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7204 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7205 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7206 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7207 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7208 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7301 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7302 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7303 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7304 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7305 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7306 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7307 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 7 UNIT 7308 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8105 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8106 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8107 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8108 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8201 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8202 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8203 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8204 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8205 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8206 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8207 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8208 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8301 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8302 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8303 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8304 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8305 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8306 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8307 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 8 UNIT 8308 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10105 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10106 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10107 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10108 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10201 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10202 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10203 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10204 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10205 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10206 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10207 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10208 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10301 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10302 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10303 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10304 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10305 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10306 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10307 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 10308 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9101 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9102 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9103 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9104 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9105 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9106 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9107 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9108 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9201 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9202 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9203 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9204 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9205 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9206 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9207 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9208 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9301 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9302 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9303 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9304 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9305 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9306 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9307 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG 9 UNIT 9308 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG A Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG B Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG C Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 BLDG C UNIT 300 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 1 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 10 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 100 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 11 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 110 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 12 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 13 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 14 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 15 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 150 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 15A Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 16 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 16A Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 16B Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 17 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 18 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 180 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 19 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 2 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 20 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 21 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 22 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 23 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 24 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 25 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 26 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 27 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 28 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 29 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 3 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 31 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 32 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 33 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 34 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 35 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 36 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 38 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 39 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 4 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 40 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 41 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 42 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 43 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 44 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 45 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 46 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 47 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 48 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 49 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 5 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 51 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 52 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 53 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 54 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 56 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 6 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 7 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 8 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT 9 Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT A Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT B Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT C Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT D Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT E Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT F Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT G Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT H Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT I Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT J Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT K Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT L Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT M Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT N Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT O Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT P Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT Q Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT R Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT S Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT T Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT U Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT V Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT W Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT X Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TR-ROW-0623-00898 Complete 06/22/2023 08/27/2023 UNIT Y Right-of-Way (ROW) Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project
TC-RES-0823-07615 Complete 08/25/2023 04/02/2024 BLDG 5 UNIT 5303 Residential Building - One or Two Family Apartment with no power for six months
DP13-0043 Closed 03/13/2013 N/A DEVPKG SITE ONLY
T01AN00339 Issued 04/24/2001 N/A #13 ADDRNEW
T01EL01464 Final 06/07/2001 12/08/2001 08 ELECT RECONNECT:ELECTRIC:APT
T01EL01530 Final 06/12/2001 12/11/2001 1 ELECT RECONNECT:ELECTRIC APARTMENTS
T01EL01918 Final 07/20/2001 01/19/2002 5 ELECT RECONNECT:ELECTRICAL
T02EL01902 Final 09/19/2002 03/25/2003 3 ELECT ELECTRIC:RECONNECT
T02EL02210 Final 11/12/2002 05/13/2003 4 ELECT RECONNECT:ELECTRIC APARTMENT
T03EL02265 Final 11/19/2003 05/18/2004 5 ELECT RECONNECT:ELECTRIC:APARTMENT
T06EL00358 Final 02/22/2006 09/24/2006 ELECT ELECTRIC:SERVICE & RECPT
T06EL02190 Expired 11/02/2006 05/08/2007 7 ELECT RECONNECT:ELECTRIC APARTMENT
T08EL01159 Final 06/24/2008 01/04/2009 1 ELECT ELECTRIC:RECONNECT APARTMENT
T08EL01160 Final 06/24/2008 01/04/2009 2 ELECT ELECTRIC:RECONNECT APARTMENT
T08EL01161 Final 06/24/2008 01/04/2009 9 ELECT ELECTRIC:RECONNECT APARTMENT
T08EL01377 Final 07/23/2008 01/25/2009 #11 ELECT ELECTRICAL RECONNECT
T08EL01809 Final 09/16/2008 03/18/2009 4 ELECT RECONNECT:ELECTRIC APARTMENT
T08EL01924 Final 10/07/2008 04/08/2009 9 ELECT ELECTRICAL RECONNECT
T09EL01172 Final 05/15/2009 11/15/2009 #11 ELECT RECONNECT: ELECTRIC; APT# 11103
T12CM06142 Final 10/02/2012 10/06/2013 1 COMBO REPAIR:STAIR CASES BLDG 1 THUR 13 T12DV06660
T12OT00809 Expired 05/24/2012 12/29/2012 SIGN SIGN (MONUMENT SIGN) 20492
T13CM01253 Final 03/05/2013 09/04/2013 4 COMBO RECONNECT ELECTRIC; APT # 4205
T13CM01441 Expired 03/13/2013 11/20/2013 COMBO INSTALL NEW GUARD AND ENTRY GATES
T14CM01691 Final 03/26/2014 03/23/2015 COMBO REPAIR SEWER LINE IN PARKING LOT
T15CM00430 Expired 01/21/2015 07/21/2015 #12 COMBO INSTALL 100 AMP MAIN BREAKER - TEP METER CHANGEOUT PROGRAM - APTS (APA)
T15CM02296 Final 04/08/2015 10/14/2015 7 COMBO REPLACE MAIN ELECTRIC BREAKER
T15CM08337 Final 11/27/2015 07/24/2016 #11 COMBO (T15DV05929) CAR IN TO BLDG
T16CM08252 Final 10/31/2016 05/02/2017 7 COMBO ELECTRIC RECONNECT
T17CM04707 L of c 06/16/2017 04/09/2018 #13 COMBO (T17DV02445) FIRE DAMAGE
T18CM01115 Final 02/13/2018 08/25/2018 #13 COMBO ELECTRICAL RECONNECT
T20RW05765 Final 10/21/2020 12/20/2020 ROW Starting on the South/West side of Bilby and Campbell Repair Cable 90' going East continue going South 2578' and Riser down. BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
T22CM00969 Final 02/08/2022 09/25/2022 COMBO Replaced Glulam beam damaged by fire. Cigarette was put out between the two beams which caught fire. Beam is supported by steel post with 3" top plate which supports the beams. Replaced damaged beams and fascia with like for like. Damage on second story next to unit 13208. Roof jack up existing stairs and deck, demo existing damaged beams and fascia, replaced with like for like, install new lags and bolts. Documents attached are 1. property map showing where repairs were done on property unit 13208. 2. Delmar 1-3 pictures are damage before repairs. 3. Repairs 1-5 are pictures after repairs done.
T22CM03476 Final 05/06/2022 11/09/2022 8308 COMBO Reconnect

Code Enforcement

Parcel Number - 14022003J
Date - 12/23/2024 11:48 a.m.
Total Number Of Code Cases - 444
Case Number Case Status Entered Date Closed Date Unit Type Description
CE-VIO1123-06370 Closed - resolved 11/05/2023 11/05/2023 BLDG 11 Code Enforcement Case TFD-EMERGENCY CALL OUT FOR WATER INTRUSION TO UNIT 11-206
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 9 UNIT 10204 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 11 UNIT 11302 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 1 UNIT 1203 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 5 UNIT 5304 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 5 UNIT 5205 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 8 UNIT 8102 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 4 UNIT 4104 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 11 UNIT 11204 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 7 UNIT 7305 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 4 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 1 UNIT 1201 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 8 UNIT 8208 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 13 UNIT 13305 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 9 UNIT 10101 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 1 UNIT 1103 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 5 UNIT 5204 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 9 UNIT 9306 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 12 UNIT 12101 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 9 UNIT 10206 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 1 UNIT 1105 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 1 UNIT 1102 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 9 UNIT 9207 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 3 UNIT 3108 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 5 UNIT 5108 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 9 UNIT 9305 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 5 UNIT 5102 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 4 UNIT 4308 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 8 UNIT 8304 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 5 UNIT 5302 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 4 UNIT 4108 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 6 UNIT 6105 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 6 UNIT 6307 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 7 UNIT 7207 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 2 UNIT 2305 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 2 UNIT 2107 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 2 UNIT 2104 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 13 UNIT 13306 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 3 UNIT 3301 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 2 UNIT 2301 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 5 UNIT 5307 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 3 UNIT 3207 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 8 UNIT 8104 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 6 UNIT 6205 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 6 UNIT 6102 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 13 UNIT 13208 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 13 UNIT 13105 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 5 UNIT 5208 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 8 UNIT 8107 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 12 UNIT 12201 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 11 UNIT 11201 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 4 UNIT 4301 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 8 UNIT 8305 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 4 UNIT 4306 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 2 UNIT 2205 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 1 UNIT 1304 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 8 UNIT 8202 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 7 UNIT 7104 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 12 UNIT 12207 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 9 UNIT 10107 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 2 UNIT 2103 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 8 UNIT 8108 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 9 UNIT 9203 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 9 UNIT 9302 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 7 UNIT 7201 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 8 UNIT 8302 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 2 UNIT 2106 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 6 UNIT 6107 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 2 UNIT 2201 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 7 UNIT 7206 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 9 UNIT 10208 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 12 UNIT 12305 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 4 UNIT 4201 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 9 UNIT 9104 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 8 UNIT 8106 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 1 UNIT 1204 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 3 UNIT 3104 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 9 UNIT 10105 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 4 UNIT 4102 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 13 UNIT 13207 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 11 UNIT 11205 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 8 UNIT 8103 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 7 UNIT 7302 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 2 UNIT 2105 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 9 UNIT 10304 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 1 UNIT 1108 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 7 UNIT 7307 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 2 UNIT 2203 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 1 UNIT 1107 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 12 UNIT 12102 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 13 UNIT 13106 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 11 UNIT 11104 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 4 UNIT 4205 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 4 UNIT 4303 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 2 UNIT 2202 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 13 UNIT 13304 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 1 UNIT 1205 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 13 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 9 UNIT 10205 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 6 UNIT 6308 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 5 UNIT 5104 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 4 UNIT 4204 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 12 UNIT 12103 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 4 UNIT 4206 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 13 UNIT 13307 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 13 UNIT 13201 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 3 UNIT 3308 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 11 UNIT 11305 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 6 UNIT 6306 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 6 UNIT 6106 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 9 UNIT 9101 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 3 UNIT 3304 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 6 UNIT 6301 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 8 UNIT 8203 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 5 UNIT 5105 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 5 UNIT 5207 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 6 UNIT 6303 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 6 UNIT 6305 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 1 UNIT 1104 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 7 UNIT 7108 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 11 UNIT 11208 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 12 UNIT 12303 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 5 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 9 UNIT 9308 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 4 UNIT 4103 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 11 UNIT 11303 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 5 UNIT 5101 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 13 UNIT 13308 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 2 UNIT 2204 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 9 UNIT 10308 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 12 UNIT 12203 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 13 UNIT 13202 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 8 UNIT 8307 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 9 UNIT 9106 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 12 UNIT 12106 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 7 UNIT 7308 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 3 UNIT 3206 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 1 UNIT 1308 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 2 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 8 UNIT 8301 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 6 UNIT 6302 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 5 UNIT 5201 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 9 UNIT 9107 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 5 UNIT 5106 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 6 UNIT 6208 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 7 UNIT 7301 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 7 UNIT 7205 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 8 UNIT 8101 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 3 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 11 UNIT 11202 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 7 UNIT 7303 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 5 UNIT 5303 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 9 UNIT 10207 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 4 UNIT 4203 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 13 UNIT 13103 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 7 UNIT 7103 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 9 UNIT 9208 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 11 UNIT 11107 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 12 UNIT 12306 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 9 UNIT 10106 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 11 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 5 UNIT 5308 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 12 UNIT 12302 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 9 UNIT 10203 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 3 UNIT 3205 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 3 UNIT 3105 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 11 UNIT 11307 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 3 UNIT 3306 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 1 UNIT 1202 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 1 UNIT 1106 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 9 UNIT 9301 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 5 UNIT 5301 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 9 UNIT 10202 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 1 UNIT 1307 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 12 UNIT 12304 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 7 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 12 UNIT 12205 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 11 UNIT 11103 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 3 UNIT 3202 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 2 UNIT 2101 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 8 UNIT 8306 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 8 UNIT 8303 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 1 UNIT 1207 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 5 UNIT 5305 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 5 UNIT 5202 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 9 UNIT 9205 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 8 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 6 UNIT 6201 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 7 UNIT 7105 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 5 UNIT 5103 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 6 UNIT 6304 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 7 UNIT 7203 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 8 UNIT 8105 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 3 UNIT 3204 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 8 UNIT 8207 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 8 UNIT 8308 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 2 UNIT 2304 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 11 UNIT 11203 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 9 UNIT 9303 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 13 UNIT 13203 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 12 UNIT 12108 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 11 UNIT 11304 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 3 UNIT 3101 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 9 UNIT 10102 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 8 UNIT 8201 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 4 UNIT 4307 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 2 UNIT 2302 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 13 UNIT 13206 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 11 UNIT 11108 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 2 UNIT 2102 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 4 UNIT 4101 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 8 UNIT 8205 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 9 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 3 UNIT 3203 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 4 UNIT 4302 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 7 UNIT 7102 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 1 UNIT 1306 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 12 UNIT 12206 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 9 UNIT 10306 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 9 UNIT 10302 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 13 UNIT 13102 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 4 UNIT 4107 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 11 UNIT 11308 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 12 UNIT 12107 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 6 UNIT 6101 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 4 UNIT 4202 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 9 UNIT 9102 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 2 UNIT 2308 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 6 UNIT 6207 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 9 UNIT 9108 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 6 UNIT 6108 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 4 UNIT 4207 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 4 UNIT 4106 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 9 UNIT 9206 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 12 UNIT 12202 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 7 UNIT 7208 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 3 UNIT 3102 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 1 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 7 UNIT 7204 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 13 UNIT 13204 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 13 UNIT 13205 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 9 UNIT 10307 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 7 UNIT 7202 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 4 UNIT 4208 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 13 UNIT 13108 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 11 UNIT 11106 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 12 UNIT 12301 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 13 UNIT 13302 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 9 UNIT 9103 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 4 UNIT 4304 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 13 UNIT 13107 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 3 UNIT 3208 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 3 UNIT 3106 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 9 UNIT 10103 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 12 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 5 UNIT 5306 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 3 UNIT 3201 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 8 UNIT 8204 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 9 UNIT 10303 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 9 UNIT 9201 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 2 UNIT 2303 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 6 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 3 UNIT 3307 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 6 UNIT 6204 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 1 UNIT 1305 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 9 UNIT 9105 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 11 UNIT 11301 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 9 UNIT 10201 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 7 UNIT 7106 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 12 UNIT 12104 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 11 UNIT 11206 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 12 UNIT 12105 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 8 UNIT 8206 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 9 UNIT 10301 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 2 UNIT 2108 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 9 UNIT 9202 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 1 UNIT 1302 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 12 UNIT 12204 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 9 UNIT 9204 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 10 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 13 UNIT 13303 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 11 UNIT 11101 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 7 UNIT 7107 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 2 UNIT 2306 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 4 UNIT 4105 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 11 UNIT 11207 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 4 UNIT 4305 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 2 UNIT 2307 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 6 UNIT 6103 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 7 UNIT 7101 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 6 UNIT 6104 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 3 UNIT 3305 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 13 UNIT 13101 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 5 UNIT 5107 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 5 UNIT 5206 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 2 UNIT 2206 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 5 UNIT 5203 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 2 UNIT 2208 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 1 UNIT 1303 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 12 UNIT 12308 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 6 UNIT 6203 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 1 UNIT 1206 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 11 UNIT 11306 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 1 UNIT 1208 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 9 UNIT 10104 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 7 UNIT 7306 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 3 UNIT 3302 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 11 UNIT 11105 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 1 UNIT 1301 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 2 UNIT 2207 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 3 UNIT 3107 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 9 UNIT 9307 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 7 UNIT 7304 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 1 UNIT 1101 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 11 UNIT 11102 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 12 UNIT 12208 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 6 UNIT 6202 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 13 UNIT 13301 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 13 UNIT 13104 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 3 UNIT 3303 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 12 UNIT 12307 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 6 UNIT 6206 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 9 UNIT 10108 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 9 UNIT 10305 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 9 UNIT 9304 Code Enforcement Case .
CE-VIO0324-01187 Void 03/28/2024 N/A BLDG 3 UNIT 3103 Code Enforcement Case .
CE-VIO0424-01391 Closed - resolved 04/16/2024 05/23/2024 BLDG 4 Code Enforcement Case High Priority / 3rd Level of Bldg 4 / Bees / Active bee swarm
CE-VIO1123-06369 Closed - resolved 11/05/2023 11/05/2023 BLDG 11 Code Enforcement Case TPD CALL OUT-WATER INTRUSION TO UNIT 11-106 FROM UNIT 11-206
T01VL00946 Closed 04/09/2001 N/A #13 CODEVIOL MIN HOUSING:ROACHES
T01VL02509 Closed 08/30/2001 N/A 3 CODEVIOL MIN HOUSING:PLUMBING
T03DV00628 Complian 07/10/2003 N/A 08 DNR_VIOL COMPLAINT:MIN HOUSING-BEES AND BIRDS
T03DV01175 Complian 12/04/2003 N/A DNR_VIOL COMPLAINT:MIN HOUSING-BEES
T05DV00072 Invalid 01/31/2005 N/A DNR_VIOL COMPLAINT RE: MIN HOUSING- HAS 1 HOLE IN KITCHEN BEHIND REFRIGERATOR, 2ND HOLE UNDER KITCHEN SINK & 3RD HOLE IN BATHROOM BEHIND TOILET. ALL DUE TO PREVIOUS REPAIRS MADE TO PLUMBING. MAINT. PERSON NEVER RETURNED TO REPAIR OR PATCH UP THE HOLES.
T06DV01061 Complian 08/07/2006 N/A DNR_VIOL PLAYGROUND AREA UNSAFE AROUND ROCK CLIMBING EQUIP// HAS 2 FT WIDE AREA WHERE CHILDREN FALL INTO//REPORTED LAST YEAR, STILL NOT REPAIRED OTHER CHILDREN HAVE FALLEN INTO ALSO.
T06DV01282 Complian 09/29/2006 N/A 9 DNR_VIOL A/C HAS NOT BEEN WORKING FOR 24 HOURS, TEMPORARY COOLING, HAS FANS. TENANT IS 48 YEARS OLD AND DISABLED.
T07DV01545 Void 02/14/2007 N/A 5 DNR_VIOL ROACH INFESTATION, ROACHES ALL OVER, HAS 4 MONTH OLD BABY, //REPORTED SINCE DEC 2006 TO MGR
T07DV05014 Complian 06/04/2007 N/A 7 DNR_VIOL RAT INFESTATION, HOLES IN THE WALL. REPORTED TO MGMT ABOUT 3 WEEKS AGO. NOTHING HAS BEEN DONE & MGMT ADVISED TENANT TO SET TRAPS. HAS 8 MONTH OLD CHILD; SPANISH SPEAKING. 7-10-07 CALLING ?'NG WHEN INSPECTOR DUE? CONCERNED FOR CHILD REGARDING RATS. RE-SHEDULED FROM 8-1 TO 7-13. RR
T07DV07869 Complian 08/17/2007 N/A DNR_VIOL 6200 S CAMPBELL AVE APT#8304. A/C UNIT DOES NOT BLOW OUT AIR SUFFICIENTLY AND AIR IS NOT COOLING ENOUGH/CALLER SAYS SHE WAS TOLD COILS WERE NEEDED BUT HAVE NOT BEEN FIXED. OCCUPANT HAS DIABETES AND A 5 MONTH OLD BABY. GT CSR HLUCCA
T07DV08411 Noverify 08/24/2007 N/A DNR_VIOL ROACH INFESTATION, REPORTED IN JUNE, SENT PEST CONTROL, SPRAYED APARTMENT.
T07DV08714 Invalid 09/04/2007 N/A 9 DNR_VIOL MAJOR ROACH INFESTATION. SO UNINHABITABLE THAT TENANT HAD TO LEAVE APT. CAN'T WALK IN APT W/O STEPPING ON ROACHES. WL GV TO INSPECTOR SUPV.
T07DV08863 Void 09/07/2007 N/A 7 DNR_VIOL A/C HASN'T WORKED IN OVER A MONTH. MGMNT WORKS ON PERIODICLY BUT HAS'NT FIXED. GTI SUPV L.VALDEZ
T07DV10632 Noverify 10/05/2007 N/A DNR_VIOL ROOF LEAKS. MANAGEMENT SAYS THEY WILL SEND SOMEONE OVER BUT NEVER DO. HAS BEEN LEAKING ALL SUMMER. HALLWAY, DINING ROOM AREA, BUBBLE IN THE CEILING BETWEEN THE DINING ROOM AND KITCHEN. IS LEAKING NOW WITHOUT RAIN. CALLER DID NOT KNOW MANAGER PHONE NUMBER, SHE ALWAYS WALKS TO OFFICE. LOS MONTANYOS APTS.
T07DV13383 Complian 12/28/2007 N/A 3 DNR_VIOL ELECTRICAL OUTLETS ARE LOOSE FROM WALL. WHEN CORD IS PLUGGED IN IT HANGS A LITTLE BUT IS STILL ON THE WALL NOT EXPOSING WIRES. ROACH INFESTATION, WEATHER STRIPPING NOT ON PROPERLY AND CAUSING HEAT LOSS. TENANT IS USING PORTABLE HEATERS TO KEEP WARM, WHEN TENANT USES TO MANY OUTLETS THE ELECT. TURNS OFF. TENANT HAS CHILD OF FOUR MONTHS. TEANT HAS CALLED AND REPORTED TO MANG. MANG SAID THEY WOULD SEND SOMEONE THE NEXT DAY AND NEVER DID. REPORTED MANY TIMES AFTER THAT WITH NO APPT OR WORK ORDER FOR MAINT. TO COME AND FIX. GTI SUPER SM 12/28/07
T07FR01419 Field 07/30/2007 N/A FIREINSP Per Captain Mike Ward there is an access gate on the NW end of the complex (on Bilby) that has a knox box on it but the key does not work. The gate is in bad shape Captain Ward thinks that if a better gate system were placed there Fire would be more efficient in entering the property from the north in event of a fire. it might also make it worth while for us to use that entrance for medical calls (lots of speed bumps, crs kids) as it stands now, we would have to cut one or more chains and toss the gate to get through making it impractical to use of medical calls. another concern captain ward has is with the wires over the same entrance and the height restrictions cause by the wires and getting a ladder through
T07FR02172 Complete 10/23/2007 N/A FIREINSP Complaint received from E14A
T08DV05737 Complian 07/09/2008 N/A #13307 DNR_VIOL MIN HOUSING: FRONT DOOR FRAME CRACKED, NO WEATHER STRIPPING, A COUPLE ELECTRICAL OUTLETS DON'T WORK OR HAVE SOCKETS COMING OUT, BURNER ON STOVE DOESN'T WORK, CARPET IS BURNT AND HAS FOUL ODOR. OCCUPANT STATES IS CURRENT WITH RENT; STATES REPORTED TO MGMT SINCE MOVE IN AND AGAIN LAST WEEK & NOTHING HAS BEEN REPAIRED. OCCUPANT STATES GIRLFRIEND IS PREGNANT & DOESN'T FEEL SAFE DUE TO FRONT DOOR NOT BEING FULLY SECURED. NOTE: INSPECTOR PLEASE CALL OCCUPANT PRIOR TO INSPECTION TO ENSURE SOMEONE IS HOME.
T08DV08251 Noverify 09/08/2008 N/A #12 DNR_VIOL ROOF/ COOLER LEAK, WATER DAMAGE, WALL CUT OPEN BY MANAGEMENT, NO REPAIRS AS OF YET MADE. CALLER HAS TWO INFANTS.
T09DV02547 Cancel 05/05/2009 N/A 1 DNR_VIOL APT #1204 - FLOOD DAMAGE DUE TO WATER PIPE IN WALL BREAKING
T09DV02550 Cancel 05/06/2009 N/A 1 DNR_VIOL APT #1104 FLOOD DAMAGE DUE TO WATER PIPE BREAKING IN WALL
T09DV02551 Complian 05/06/2009 N/A 1 DNR_VIOL APT #1103 - FLOOD DAMAGE DUE TO WATER PIPE BREAKING IN WALL
T09DV03959 Complian 07/13/2009 N/A 1 DNR_VIOL A COUPLE OF WEEKS AGO LEAK IN BEDROOM; INFORMED MGMT AND MAINTENANCE A FEW WEEKS AGO AND NOTHING HAS BEEN REPAIRED. STATES NOW SMELL OF MOLD; ADVISED NOT A PART OF OUR JURISDICTION. HAS 4-YEAR OLD CHILD. CURRENT WITH RENT.
T10DV00813 Complian 02/24/2010 N/A #12 DNR_VIOL Roof leaks in the master bedroom. Recent rains last week caused further interior damage. Management says the leak is fixed, and then the roof leaks again when it rains. Kitchen lights spark when the switch is turned on. Bathroom tiles do not stay attached to the shower wall. (Mold growing in the shower - caller told we do not inspect for mold). Stover burners not functioning correctly - caller told we can not assist with appliances. Tenant states he has not been offered another unit to live in. He feels it is unsafe to live in the apartment. He has a younger son living with him.
T10FR01718 Complete 08/13/2010 N/A FIREINSP complaint came by Maricruz Valenzuela manager of Del Moral Town Homes he states Las Montanas who is managed by Case Enterprise decided to put up a fence to separate properties, his concern is that they blocked an entrance so now Del Moral Apartments only has one entrance and exit to both the properties he states he has 152 units and Las Montanas has about 200+units. His concern is the access needed for emergencies. also the fire hydrants and access to them with this fence up
T11DV00856 Complian 02/11/2011 N/A 5 DNR_VIOL LAS MONTANAS APARTMENTS #5105 LEAK IN CLOSED LAST SUNDAY 02.06.11. MANAGEMENT INSTALLED A FAN AND REMOVED CAPRETING; HOWEVER, THEY ARE NOT DOING ANY FURTHER REPAIRS. MAINTENANCE DOES NOT KNOW HOW OR WHERE THE LEAK CAME FROM AND IS NOT CHECKING FOR INITIAL PROBLEM.
T11DV04036 Noverify 06/06/2011 N/A DNR_VIOL Los Montañes Apartments: Tree Fire on Sunday, 5/29/11. Electrical light pole near pool and club house by 3 palm trees is a possible safety hazard.
T11DV05078 Complian 07/06/2011 N/A 7 DNR_VIOL Roof is leaking. Maintenace has been out twice to fix the roof, but it still leaks from the second floor into unit. Kitchen sink is flooding. Faucet is not turned on and water is flowing out of the sink. Holes in kitchen wall that have not been patched. Maintenance has not resolved issues, kitchen sink can not be used at all.
T11DV07280 Noverify 09/13/2011 N/A DNR_VIOL Water leaks into apt when it rains. Porch area fills with water and comes in through windows and under sliding glass door.
T11DV09144 Noverify 11/08/2011 N/A DNR_VIOL APT #5105, WATER LEAK FROM CEILING, COCKROACH INFESTATION
T11DV09528 Complian 11/28/2011 N/A 1 DNR_VIOL UNIT 1204 HAD BROKEN WATER LINE AND WATER WENT INTO THE UNIT OF 1103
T11DV09530 Complian 11/28/2011 N/A 1 DNR_VIOL UNIT HAD BROKEN WATER LINE IN THE BATHROOM BEHIND THE TOILET AND FLOODED UNIT
T11DV09532 Complian 11/28/2011 N/A 1 DNR_VIOL COMMUNICATION CALLED AND T.F.D. ON SITE WITH A BROKEN WATER LINE, ALARM # 11-72044
T12DV00780 Complian 02/06/2012 N/A 1 DNR_VIOL Pipe broke. TFD called out for water damage on 2/05/2012. Water damage all over apartment. Carpet is still wet. A piece of drywall fell off the bathroom wall.
T12DV01328 Complian 02/21/2012 N/A 3 DNR_VIOL BROKEN WATER LINE (CE05 AREA)
T12DV01329 Complian 02/21/2012 N/A 3 DNR_VIOL FLOODED BY BROKEN WATER LINE UPSTAIRS
T12DV01330 Complian 02/21/2012 N/A 3 DNR_VIOL FLOODED BY BROKEN WATER LINE UPSTAIRS
T12DV04263 Complian 05/23/2012 N/A DNR_VIOL TRASH AND DEBRIS
T12DV05149 Complian 06/20/2012 N/A DNR_VIOL RAIL ON THE STAIRWELL
T12DV05169 Complian 06/20/2012 N/A DNR_VIOL aPT #10308---> sink no draining for one week now. starting to smell inside apartment......weather stripping missing, water damage on ceilings, wasps nest on balcony
T12DV05502 Complian 06/28/2012 N/A 4 DNR_VIOL Floor unsecure. The floor under the bath tub and in the kitchen sinks down. Also complains about roaches, but did say the management sprays once a week. No filter in the A/C, but A/C works ok.
T12DV05674 Complian 07/05/2012 N/A DNR_VIOL CEILING COLLAPSED AND ACTIVE WATER LEAK
T12DV05694 Complian 07/06/2012 N/A DNR_VIOL ROOF LEAK INTO THE UNIT
T12DV05695 Complian 07/06/2012 N/A DNR_VIOL ROOF LEAK INTO THE UNIT
T12DV05710 Complian 07/06/2012 N/A DNR_VIOL WATER LEAK IN THE WALL AND LEAKING TO BOTTOM UNIT
T12DV05854 Complian 07/13/2012 N/A 5 DNR_VIOL AIR CONDITIONER LEAKING
T12DV05891 Complian 07/16/2012 N/A 4 DNR_VIOL LEAKS THROUGH FROM PATIO INTO HOUSE.
T12DV05969 Noverify 07/18/2012 N/A 4 DNR_VIOL APARTMENT HAS FLOODED TWICE IN TWO WEEKS. WATER COMING THROUGH WALLS FROM NEIGHBORING APARTMENT. MANAGEMENT DID NOT REMOVE WATER (VACUUM ONLY) UNTIL AFTER TWO DAYS OF SITTING STAGNANT. OCCUPANT IS REQUESTING ANOTHER APARTMENT AND MANAGEMENT IS NOT RESPONDING.
T12DV06416 Complian 07/31/2012 N/A #12 DNR_VIOL Leak in bathroom behind toilet, toilet constantly runs, faucet in kitchen doesn't not turn off completely.
T12DV06438 Complian 08/01/2012 N/A DNR_VIOL COOLER MAKING EXTREMELY LOUD NOISES -
T12DV06459 Complian 08/02/2012 N/A 1 DNR_VIOL EMMERGENCY CALL OUT PERSON FELL THOUGH LANDING
T12DV06573 Complian 08/06/2012 N/A 3 DNR_VIOL Cockroach infestation, carpet has damage due to leak in A/C that went on for over a month, states mushrooms growing. Advised no jurisdiction over mold. States reported to manager about 2 weeks ago.
T12DV06618 Complian 08/07/2012 N/A 1 DNR_VIOL HAZARDOUS LANDINGS / STAIRCASES
T12DV06636 Void 08/07/2012 N/A 2 DNR_VIOL HAZARDOUS LANDINGS / STAIRCASES
T12DV06637 Void 08/07/2012 N/A 3 DNR_VIOL HAZARDOUS LANDINGS / STAIRCASES
T12DV06638 Void 08/07/2012 N/A DNR_VIOL HAZARDOUS LANDINGS / STAIRCASES
T12DV06650 Complian 08/07/2012 N/A 2 DNR_VIOL HAZARDOUS LANDINGS / STAIRCASES
T12DV06651 Complian 08/07/2012 N/A 3 DNR_VIOL HAZARDOUS LANDINGS / STAIRCASES
T12DV06652 Complian 08/07/2012 N/A 4 DNR_VIOL HAZARDOUS LANDINGS / STAIRCASES
T12DV06653 Complian 08/07/2012 N/A 5 DNR_VIOL HAZARDOUS LANDINGS / STAIRCASES
T12DV06654 Complian 08/07/2012 N/A 6 DNR_VIOL HAZARDOUS LANDINGS / STAIRCASES
T12DV06655 Complian 08/07/2012 N/A 7 DNR_VIOL HAZARDOUS LANDINGS / STAIRCASES
T12DV06656 Complian 08/07/2012 N/A 8 DNR_VIOL HAZARDOUS LANDINGS / STAIRCASES
T12DV06657 Complian 08/07/2012 N/A 9 DNR_VIOL HAZARDOUS LANDINGS / STAIRCASES
T12DV06658 Complian 08/07/2012 N/A 9 DNR_VIOL HAZARDOUS LANDINGS / STAIRCASES
T12DV06660 Complian 08/07/2012 N/A #11 DNR_VIOL HAZARDOUS LANDINGS / STAIRCASES
T12DV06661 Complian 08/07/2012 N/A #12 DNR_VIOL HAZARDOUS LANDINGS / STAIRCASES
T12DV06662 Complian 08/07/2012 N/A #13 DNR_VIOL HAZARDOUS LANDINGS / STAIRCASES
T12DV06733 Complian 08/08/2012 N/A DNR_VIOL NO ELECTRICITY IN APT AND AC IS LEAKING
T12DV07388 Complian 08/21/2012 N/A DNR_VIOL AIR CONDITIONING OUT 11 DAYS
T12DV07454 Complian 08/22/2012 N/A DNR_VIOL Unit #3205 ---> A/C been out for two weeks
T12DV09774 Noverify 10/17/2012 N/A 1 DNR_VIOL No A/C in the apartment, management has not successfully fixed the unit.
T12DV09791 Complian 10/18/2012 N/A 6 DNR_VIOL Air conditioner not working 2900E
T12DV09792 Complian 10/18/2012 N/A #12 DNR_VIOL Apt# 12206 ----> A/C leaking for past two months
T12DV10642 Complian 11/20/2012 N/A #12 DNR_VIOL RANCHO DEL MAR APARTMENTS - Unit #12201 (tenant spanish speaker) Cockroach infestation, missing cabinet doors in kitchen, water leaking into wall from bath tub faucet.
T13DV02197 Complian 04/08/2013 N/A DNR_VIOL SEWAGE BACKING UP INTO APTS
T13DV02198 Complian 04/08/2013 N/A DNR_VIOL SEWAGE BACKING UP INTO APTS
T13DV02199 Complian 04/08/2013 N/A DNR_VIOL SEWAGE BACKING UP INTO APTS
T13DV02229 Complian 04/08/2013 N/A 8 DNR_VIOL Tenant has killed over 100 roaches within 10 ten days. Management is not addressing roach issue. Also the bathroom toilet is not secure. It is tilted and not working well. Also reported to management.
T13DV03005 Complian 05/07/2013 N/A DNR_VIOL ROACHES/ SHOWER- USED DUCT TO FIX/ STOVE- ONLY ONE BURNER WORKS- UNIT 6201
T13DV03172 Complian 05/09/2013 N/A DNR_VIOL MAIN WALL DETERIORATED
T13DV04168 Complian 06/14/2013 N/A 1 DNR_VIOL No Cooling in the apt.
T13DV04253 Complian 06/19/2013 N/A DNR_VIOL INTERIOR WATER DAMAGE, WALLS CARPET FLOORING
T13DV04552 Complian 07/01/2013 N/A DNR_VIOL Water leak from ceiling to floor through ventilation unit
T13DV04746 Complian 07/08/2013 N/A #13 DNR_VIOL Leaks from window frames, flooring damaged from water, paint is peeling.
T13DV04789 Complian 07/09/2013 N/A DNR_VIOL CEILING DAMAGE FROM THE RAINS
T13DV04792 Complian 07/09/2013 N/A DNR_VIOL ROOF DAMAGE unit # 9
T13DV04910 Complian 07/11/2013 N/A 6 DNR_VIOL Ceiling damage from the storm.
T13DV04989 Complian 07/12/2013 N/A 7 DNR_VIOL A/c not working, ceiling leaking. The shower tiles are off in the bathroom, been off for three months. Managment's solution was to duct tape platic up on the walls.
T13DV05293 Complian 07/23/2013 N/A #11 DNR_VIOL MINIMAL HOUSOING CONDITIONS-DRYWALL DETERIORATION
T13DV05294 Complian 07/23/2013 N/A #11 DNR_VIOL ROOF IS DAMAGED
T13DV05329 Complian 07/24/2013 N/A 7 DNR_VIOL ROOF DAMAGE
T13DV05330 Complian 07/24/2013 N/A 6 DNR_VIOL ROOF DAMAGE
T13DV05333 Complian 07/24/2013 N/A DNR_VIOL ROOF DAMAGE
T14DV00648 Complian 02/04/2014 N/A DNR_VIOL SECURITY FENCE FOR POOL IS DETERIORATED
T14DV01976 Complian 03/26/2014 N/A 5 DNR_VIOL BACKED UP SEWER LINE
T14DV01980 Complian 03/26/2014 N/A 5 DNR_VIOL PLUGGED SEWER LINE
T14DV01982 Complian 03/26/2014 N/A 5 DNR_VIOL CLOGGED SEWER LINE
T14DV04169 Complian 06/24/2014 N/A 7 DNR_VIOL BATHROOM TILE IS FALLING DOWN
T15DV05477 Complian 07/24/2015 N/A DNR_VIOL GRAFFITI- ALL OVER WALL FACING BILBY RD AND FACING SUNNYSIDE HIGH SCHOOL.
T15DV09792 Complian 12/21/2015 N/A DNR_VIOL Plumbing-kitchen sink, a/c, heat, cochroach infestation
T16DV05427 Complian 09/07/2016 N/A DNR_VIOL Excessive vegetation and/or weeds
T16DV07478 Complian 10/26/2016 N/A DNR_VIOL UNIT 9304: LEAKING CEILING AND WINDOWS, ISSUE HAS BEEN BROUGHT TO LANDLORD IN MARCH, LANDLORD CONTINUES TO SAY THAT IT WILL BE FIXED, THOUGH NEVER GETS AROUND TO IT.
T17DV02443 Complian 06/11/2017 N/A #13 DNR_VIOL FIRE DAMAGE
T17DV02444 Complian 06/11/2017 N/A #13 DNR_VIOL INTERIOR INSPECTION REQUIRED
T17DV02445 Complian 06/11/2017 N/A #13 DNR_VIOL FIRE DAMAGE
T18DV05815 Complian 09/17/2018 N/A 8 DNR_VIOL LEAK COMING IN THROUGH THE CEILING
T20DV01515 Void 02/27/2020 N/A 8 DNR_VIOL roaches infestation
T20DV04562 Complian 07/06/2020 N/A 6 DNR_VIOL ROACHES INFESTATION IN UNIT
T20DV06303 Complian 09/16/2020 N/A #13 DNR_VIOL person at this address is working on vehicles in the parking lot of apartment complex suburban 1970s model white 4 door 1990s impala busted windows and a little black sedan import maybe running a mechanic business
T21DV01046 Complian 02/25/2021 N/A DNR_VIOL BANNER HAS BEEN PLACED ON THE MASONARY WALL ON THE FRONT OF THE PROPERTY
T21DV01156 Complian 03/02/2021 N/A 2 DNR_VIOL pest control and caulking not being down
T21DV08145 Complian 11/15/2021 N/A DNR_VIOL FIRE DAMAGE TO GLULAM BEAM NEXT TO UNIT 13208
T22DV02369 Complian 04/11/2022 N/A 9 DNR_VIOL Open wall after fixing leak
T99VL02212 Complian 08/17/1999 N/A CODEVIOL COMPLAINT:SIGN:FLAGS/A-FRAMES