Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Parcel Search: 14022003J
Parcel Search
Annexations & Original City Zoning (OCZ)
Date - 12/23/2024 11:48 a.m.
Total Number Of OZC Plans - (1)
Rezoning Cases
Date - 12/23/2024 11:48 a.m.
Total Number Of Rezone Cases - (1)
Case No. | Description | New Zone | Status | Status Date | Address |
---|---|---|---|---|---|
C9-85-62 | Pima Savings - Bilby Road | R-3 | Effectuated | 05/20/2010 | S CAMPBELL |
Special Development Requests & Requirements
Date - 12/23/2024 11:48 a.m.
Total Number Of Special Development Permits - (6)
Activity Number | Status | Apply Date | Expired Date | Type | Description |
---|---|---|---|---|---|
H000011226 | Closed | N/A | |||
T13SA00156 | Complete | N/A | |||
T15SA00238 | Complete | N/A | |||
T16SA00425 | Complete | N/A | |||
T20SA00021 | Complete | N/A | ZONING LETTER | ||
T22SA00434 | Complete | N/A | Zoning Compliance Letter for Multifamily |
Permits
Parcel Number - 14022003J
Date - 12/23/2024 11:48 a.m.
Total Number Of Permits - (594)
Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TR-UTL-0324-00435 | Complete | 03/04/2024 | 08/18/2024 | BLDG 1 | Right-of-Way (ROW) - Utility | PRJ265729-1 Cox to Place new PED and transfer riser to new pole. |
TR-ROW-0323-00502 | Complete | 03/16/2023 | 05/10/2023 | Right-of-Way (ROW) | Perform 7-inch diameter soil borings to depths of approximately 3 feet below existing site grade along Bilby Road between 12th Avenue and Country Club Road to obtain soil samples for a pavement section design | |
TR-ROW-0323-00502 | Complete | 03/16/2023 | 05/10/2023 | BLDG 6 UNIT 6106 | Right-of-Way (ROW) | Perform 7-inch diameter soil borings to depths of approximately 3 feet below existing site grade along Bilby Road between 12th Avenue and Country Club Road to obtain soil samples for a pavement section design |
TR-ROW-0323-00502 | Complete | 03/16/2023 | 05/10/2023 | UNIT 12 | Right-of-Way (ROW) | Perform 7-inch diameter soil borings to depths of approximately 3 feet below existing site grade along Bilby Road between 12th Avenue and Country Club Road to obtain soil samples for a pavement section design |
TR-ROW-0323-00502 | Complete | 03/16/2023 | 05/10/2023 | UNIT 36 | Right-of-Way (ROW) | Perform 7-inch diameter soil borings to depths of approximately 3 feet below existing site grade along Bilby Road between 12th Avenue and Country Club Road to obtain soil samples for a pavement section design |
TC-COM-0424-00666 | Issued | 04/12/2024 | 10/12/2024 | BLDG 6 UNIT 6306 | Commercial Building | Electrical reconnect |
TC-RES-0524-03219 | Void | 05/28/2024 | N/A | BLDG 8 UNIT 8207 | Residential Building - One or Two Family | VOID:YL - Unable to process, incorrect permit type. A property with more than 2 units is multi-family and considered to be commercial. Please re-apply under "Commercial Trade Permit" and utilize the commercial reconnect form linked below. Commercial reconnect Form: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/commercial-permits/electrical-reconnect-information-sheet-commercial.pdf For questions: Building_Official@tucsonaz.gov -reconnect Eletric |
TC-RES-0624-03474 | Void | 06/10/2024 | N/A | BLDG 7 UNIT 7202 | Residential Building - One or Two Family | VOID:YL - Unable to process, incorrect permit type. A property with more than 2 units is multi-family and considered to be commercial. Please re-apply under "Commercial Trade Permit" and utilize the commercial reconnect form linked below. Commercial reconnect Form: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/commercial-permits/electrical-reconnect-information-sheet-commercial.pdf For questions: Building_Official@tucsonaz.gov ** -ELECTRIC RECONNECT |
TC-RES-0624-03476 | Void | 06/10/2024 | N/A | BLDG 8 UNIT 8207 | Residential Building - One or Two Family | VOID:YL - Unable to process, incorrect permit type. A property with more than 2 units is multi-family and considered to be commercial. Please re-apply under "Commercial Trade Permit" and utilize the commercial reconnect form linked below. Commercial reconnect Form: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/commercial-permits/electrical-reconnect-information-sheet-commercial.pdf For questions: Building_Official@tucsonaz.gov -RECONNECT ELETRIC |
TC-RES-0624-03498 | Issued | 06/10/2024 | 02/16/2025 | BLDG 7 UNIT 7202 | Residential Building - One or Two Family | ELECTRIC RECINNECT |
TC-RES-0624-03499 | Complete | 06/10/2024 | 02/11/2025 | BLDG 8 UNIT 8207 | Residential Building - One or Two Family | ELECTRIC RECONNECT |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project | |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 0 UNIT 1 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 0 UNIT 2 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 0 UNIT 3 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 0 UNIT 4 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1105 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1106 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1107 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1108 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1201 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1202 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1203 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1204 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1205 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1206 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1207 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1208 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1301 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1302 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1303 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1304 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1305 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1306 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1307 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1308 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 10 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 10 UNIT 10101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 10 UNIT 10102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 10 UNIT 10103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 10 UNIT 10104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 100 UNIT 150 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 100 UNIT 170 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11105 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11106 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11107 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11108 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11201 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11202 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11203 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11204 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11205 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11206 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11207 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11208 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11301 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11302 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11303 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11304 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11305 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11306 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11307 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11308 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12105 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12106 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12107 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12108 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12201 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12202 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12203 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12204 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12205 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12206 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12207 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12208 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12301 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12302 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12303 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12304 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12305 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12306 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12307 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12308 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13105 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13106 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13107 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13108 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13201 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13202 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13203 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13204 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13205 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13206 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13207 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13208 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13301 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13302 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13303 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13304 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13305 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13306 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13307 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13308 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 14 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 14 UNIT 14101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 14 UNIT 14102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 14 UNIT 14103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 14 UNIT 14104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 15 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 15 UNIT 15101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 15 UNIT 15102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 15 UNIT 15103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 15 UNIT 15104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 16 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 16 UNIT 16101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 16 UNIT 16102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 16 UNIT 16103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 16 UNIT 16104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 17 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 17 UNIT 17101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 17 UNIT 17102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 17 UNIT 17103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 17 UNIT 17104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 18 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 18 UNIT 18101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 18 UNIT 18102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 18 UNIT 18103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 18 UNIT 18104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 19 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 19 UNIT 19101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 19 UNIT 19102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 19 UNIT 19103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 19 UNIT 19104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2105 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2106 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2107 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2108 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2201 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2202 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2203 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2204 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2205 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2206 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2207 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2208 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2301 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2302 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2303 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2304 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2305 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2306 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2307 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2308 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 20 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 20 UNIT 20101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 20 UNIT 20102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 20 UNIT 20103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 20 UNIT 20104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 200 UNIT 240 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 21 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 21 UNIT 21101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 21 UNIT 21102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 21 UNIT 21103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 21 UNIT 21104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 22 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 22 UNIT 22101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 22 UNIT 22102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 22 UNIT 22103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 22 UNIT 22104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 23 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 23 UNIT 23101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 23 UNIT 23102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 23 UNIT 23103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 23 UNIT 23104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 24 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 24 UNIT 24101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 24 UNIT 24102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 24 UNIT 24103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 24 UNIT 24104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 25 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 25 UNIT 25101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 25 UNIT 25102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 25 UNIT 25103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 25 UNIT 25104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 26 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 26 UNIT 26101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 26 UNIT 26102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 26 UNIT 26103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 26 UNIT 26104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 27 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 27 UNIT 27101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 27 UNIT 27102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 27 UNIT 27103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 27 UNIT 27104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 28 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 28 UNIT 28101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 28 UNIT 28102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 28 UNIT 28103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 28 UNIT 28104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 29 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 29 UNIT 29101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 29 UNIT 29102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 29 UNIT 29103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 29 UNIT 29104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3105 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3106 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3107 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3108 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3201 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3202 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3203 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3204 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3205 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3206 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3207 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3208 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3301 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3302 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3303 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3304 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3305 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3306 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3307 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3308 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 30 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 30 UNIT 30101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 30 UNIT 30102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 30 UNIT 30103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 30 UNIT 30104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 31 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 31 UNIT 31101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 31 UNIT 31102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 31 UNIT 31103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 31 UNIT 31104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 32 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 32 UNIT 32101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 32 UNIT 32102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 32 UNIT 32103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 32 UNIT 32104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 33 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 33 UNIT 33101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 33 UNIT 33102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 33 UNIT 33103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 33 UNIT 33104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 34 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 34 UNIT 34101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 34 UNIT 34102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 34 UNIT 34103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 34 UNIT 34104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 35 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 35 UNIT 35101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 35 UNIT 35102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 35 UNIT 35103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 35 UNIT 35104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 36 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 36 UNIT 36101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 36 UNIT 36102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 36 UNIT 36103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 36 UNIT 36104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 37 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 37 UNIT 37101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 37 UNIT 37102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 37 UNIT 37103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 37 UNIT 37104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 38 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 38 UNIT 38101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 38 UNIT 38102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 38 UNIT 38103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 38 UNIT 38104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 39 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4105 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4106 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4107 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4108 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4201 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4202 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4203 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4204 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4205 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4206 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4207 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4208 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4301 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4302 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4303 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4304 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4305 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4306 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4307 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4308 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5105 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5106 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5107 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5108 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5201 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5202 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5203 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5204 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5205 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5206 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5207 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5208 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5301 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5302 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5303 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5304 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5305 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5306 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5307 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5308 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6105 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6106 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6107 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6108 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6201 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6202 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6203 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6204 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6205 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6206 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6207 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6208 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6301 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6302 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6303 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6304 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6305 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6306 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6307 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6308 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7105 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7106 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7107 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7108 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7201 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7202 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7203 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7204 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7205 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7206 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7207 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7208 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7301 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7302 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7303 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7304 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7305 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7306 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7307 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7308 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8105 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8106 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8107 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8108 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8201 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8202 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8203 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8204 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8205 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8206 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8207 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8208 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8301 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8302 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8303 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8304 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8305 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8306 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8307 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8308 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10105 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10106 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10107 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10108 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10201 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10202 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10203 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10204 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10205 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10206 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10207 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10208 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10301 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10302 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10303 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10304 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10305 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10306 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10307 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10308 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9105 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9106 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9107 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9108 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9201 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9202 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9203 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9204 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9205 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9206 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9207 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9208 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9301 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9302 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9303 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9304 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9305 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9306 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9307 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9308 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG A | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG B | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG C | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG C UNIT 300 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 1 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 10 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 100 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 11 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 110 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 12 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 13 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 14 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 15 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 150 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 15A | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 16 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 16A | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 16B | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 17 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 18 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 180 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 19 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 2 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 20 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 21 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 22 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 23 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 24 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 25 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 26 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 27 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 28 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 29 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 3 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 31 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 32 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 33 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 34 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 35 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 36 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 38 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 39 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 4 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 40 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 41 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 42 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 43 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 44 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 45 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 46 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 47 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 48 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 49 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 5 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 51 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 52 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 53 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 54 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 56 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 6 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 7 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 8 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT 9 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT A | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT B | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT C | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT D | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT E | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT F | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT G | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT H | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT I | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT J | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT K | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT L | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT M | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT N | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT O | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT P | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT Q | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT R | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT S | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT T | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT U | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT V | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT W | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT X | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | UNIT Y | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TC-RES-0823-07615 | Complete | 08/25/2023 | 04/02/2024 | BLDG 5 UNIT 5303 | Residential Building - One or Two Family | Apartment with no power for six months |
DP13-0043 | Closed | 03/13/2013 | N/A | DEVPKG | SITE ONLY | |
T01AN00339 | Issued | 04/24/2001 | N/A | #13 | ADDRNEW | |
T01EL01464 | Final | 06/07/2001 | 12/08/2001 | 08 | ELECT | RECONNECT:ELECTRIC:APT |
T01EL01530 | Final | 06/12/2001 | 12/11/2001 | 1 | ELECT | RECONNECT:ELECTRIC APARTMENTS |
T01EL01918 | Final | 07/20/2001 | 01/19/2002 | 5 | ELECT | RECONNECT:ELECTRICAL |
T02EL01902 | Final | 09/19/2002 | 03/25/2003 | 3 | ELECT | ELECTRIC:RECONNECT |
T02EL02210 | Final | 11/12/2002 | 05/13/2003 | 4 | ELECT | RECONNECT:ELECTRIC APARTMENT |
T03EL02265 | Final | 11/19/2003 | 05/18/2004 | 5 | ELECT | RECONNECT:ELECTRIC:APARTMENT |
T06EL00358 | Final | 02/22/2006 | 09/24/2006 | ELECT | ELECTRIC:SERVICE & RECPT | |
T06EL02190 | Expired | 11/02/2006 | 05/08/2007 | 7 | ELECT | RECONNECT:ELECTRIC APARTMENT |
T08EL01159 | Final | 06/24/2008 | 01/04/2009 | 1 | ELECT | ELECTRIC:RECONNECT APARTMENT |
T08EL01160 | Final | 06/24/2008 | 01/04/2009 | 2 | ELECT | ELECTRIC:RECONNECT APARTMENT |
T08EL01161 | Final | 06/24/2008 | 01/04/2009 | 9 | ELECT | ELECTRIC:RECONNECT APARTMENT |
T08EL01377 | Final | 07/23/2008 | 01/25/2009 | #11 | ELECT | ELECTRICAL RECONNECT |
T08EL01809 | Final | 09/16/2008 | 03/18/2009 | 4 | ELECT | RECONNECT:ELECTRIC APARTMENT |
T08EL01924 | Final | 10/07/2008 | 04/08/2009 | 9 | ELECT | ELECTRICAL RECONNECT |
T09EL01172 | Final | 05/15/2009 | 11/15/2009 | #11 | ELECT | RECONNECT: ELECTRIC; APT# 11103 |
T12CM06142 | Final | 10/02/2012 | 10/06/2013 | 1 | COMBO | REPAIR:STAIR CASES BLDG 1 THUR 13 T12DV06660 |
T12OT00809 | Expired | 05/24/2012 | 12/29/2012 | SIGN | SIGN (MONUMENT SIGN) 20492 | |
T13CM01253 | Final | 03/05/2013 | 09/04/2013 | 4 | COMBO | RECONNECT ELECTRIC; APT # 4205 |
T13CM01441 | Expired | 03/13/2013 | 11/20/2013 | COMBO | INSTALL NEW GUARD AND ENTRY GATES | |
T14CM01691 | Final | 03/26/2014 | 03/23/2015 | COMBO | REPAIR SEWER LINE IN PARKING LOT | |
T15CM00430 | Expired | 01/21/2015 | 07/21/2015 | #12 | COMBO | INSTALL 100 AMP MAIN BREAKER - TEP METER CHANGEOUT PROGRAM - APTS (APA) |
T15CM02296 | Final | 04/08/2015 | 10/14/2015 | 7 | COMBO | REPLACE MAIN ELECTRIC BREAKER |
T15CM08337 | Final | 11/27/2015 | 07/24/2016 | #11 | COMBO | (T15DV05929) CAR IN TO BLDG |
T16CM08252 | Final | 10/31/2016 | 05/02/2017 | 7 | COMBO | ELECTRIC RECONNECT |
T17CM04707 | L of c | 06/16/2017 | 04/09/2018 | #13 | COMBO | (T17DV02445) FIRE DAMAGE |
T18CM01115 | Final | 02/13/2018 | 08/25/2018 | #13 | COMBO | ELECTRICAL RECONNECT |
T20RW05765 | Final | 10/21/2020 | 12/20/2020 | ROW | Starting on the South/West side of Bilby and Campbell Repair Cable 90' going East continue going South 2578' and Riser down. BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. | |
T22CM00969 | Final | 02/08/2022 | 09/25/2022 | COMBO | Replaced Glulam beam damaged by fire. Cigarette was put out between the two beams which caught fire. Beam is supported by steel post with 3" top plate which supports the beams. Replaced damaged beams and fascia with like for like. Damage on second story next to unit 13208. Roof jack up existing stairs and deck, demo existing damaged beams and fascia, replaced with like for like, install new lags and bolts. Documents attached are 1. property map showing where repairs were done on property unit 13208. 2. Delmar 1-3 pictures are damage before repairs. 3. Repairs 1-5 are pictures after repairs done. | |
T22CM03476 | Final | 05/06/2022 | 11/09/2022 | 8308 | COMBO | Reconnect |
Code Enforcement
Parcel Number - 14022003J
Date - 12/23/2024 11:48 a.m.
Total Number Of Code Cases - 444
Case Number | Case Status | Entered Date | Closed Date | Unit | Type | Description |
---|---|---|---|---|---|---|
CE-VIO1123-06370 | Closed - resolved | 11/05/2023 | 11/05/2023 | BLDG 11 | Code Enforcement Case | TFD-EMERGENCY CALL OUT FOR WATER INTRUSION TO UNIT 11-206 |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 9 UNIT 10204 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 11 UNIT 11302 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 1 UNIT 1203 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 5 UNIT 5304 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 5 UNIT 5205 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 8 UNIT 8102 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 4 UNIT 4104 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 11 UNIT 11204 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 7 UNIT 7305 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 4 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 1 UNIT 1201 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 8 UNIT 8208 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 13 UNIT 13305 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 9 UNIT 10101 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 1 UNIT 1103 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 5 UNIT 5204 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 9 UNIT 9306 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 12 UNIT 12101 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 9 UNIT 10206 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 1 UNIT 1105 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 1 UNIT 1102 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 9 UNIT 9207 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 3 UNIT 3108 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 5 UNIT 5108 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 9 UNIT 9305 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 5 UNIT 5102 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 4 UNIT 4308 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 8 UNIT 8304 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 5 UNIT 5302 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 4 UNIT 4108 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 6 UNIT 6105 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 6 UNIT 6307 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 7 UNIT 7207 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 2 UNIT 2305 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 2 UNIT 2107 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 2 UNIT 2104 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 13 UNIT 13306 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 3 UNIT 3301 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 2 UNIT 2301 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 5 UNIT 5307 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 3 UNIT 3207 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 8 UNIT 8104 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 6 UNIT 6205 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 6 UNIT 6102 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 13 UNIT 13208 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 13 UNIT 13105 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 5 UNIT 5208 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 8 UNIT 8107 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 12 UNIT 12201 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 11 UNIT 11201 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 4 UNIT 4301 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 8 UNIT 8305 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 4 UNIT 4306 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 2 UNIT 2205 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 1 UNIT 1304 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 8 UNIT 8202 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 7 UNIT 7104 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 12 UNIT 12207 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 9 UNIT 10107 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 2 UNIT 2103 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 8 UNIT 8108 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 9 UNIT 9203 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 9 UNIT 9302 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 7 UNIT 7201 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 8 UNIT 8302 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 2 UNIT 2106 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 6 UNIT 6107 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 2 UNIT 2201 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 7 UNIT 7206 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 9 UNIT 10208 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 12 UNIT 12305 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 4 UNIT 4201 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 9 UNIT 9104 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 8 UNIT 8106 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 1 UNIT 1204 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 3 UNIT 3104 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 9 UNIT 10105 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 4 UNIT 4102 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 13 UNIT 13207 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 11 UNIT 11205 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 8 UNIT 8103 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 7 UNIT 7302 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 2 UNIT 2105 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 9 UNIT 10304 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 1 UNIT 1108 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 7 UNIT 7307 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 2 UNIT 2203 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 1 UNIT 1107 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 12 UNIT 12102 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 13 UNIT 13106 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 11 UNIT 11104 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 4 UNIT 4205 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 4 UNIT 4303 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 2 UNIT 2202 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 13 UNIT 13304 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 1 UNIT 1205 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 13 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 9 UNIT 10205 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 6 UNIT 6308 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 5 UNIT 5104 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 4 UNIT 4204 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 12 UNIT 12103 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 4 UNIT 4206 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 13 UNIT 13307 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 13 UNIT 13201 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 3 UNIT 3308 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 11 UNIT 11305 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 6 UNIT 6306 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 6 UNIT 6106 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 9 UNIT 9101 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 3 UNIT 3304 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 6 UNIT 6301 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 8 UNIT 8203 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 5 UNIT 5105 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 5 UNIT 5207 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 6 UNIT 6303 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 6 UNIT 6305 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 1 UNIT 1104 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 7 UNIT 7108 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 11 UNIT 11208 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 12 UNIT 12303 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 5 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 9 UNIT 9308 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 4 UNIT 4103 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 11 UNIT 11303 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 5 UNIT 5101 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 13 UNIT 13308 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 2 UNIT 2204 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 9 UNIT 10308 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 12 UNIT 12203 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 13 UNIT 13202 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 8 UNIT 8307 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 9 UNIT 9106 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 12 UNIT 12106 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 7 UNIT 7308 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 3 UNIT 3206 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 1 UNIT 1308 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 2 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 8 UNIT 8301 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 6 UNIT 6302 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 5 UNIT 5201 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 9 UNIT 9107 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 5 UNIT 5106 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 6 UNIT 6208 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 7 UNIT 7301 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 7 UNIT 7205 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 8 UNIT 8101 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 3 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 11 UNIT 11202 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 7 UNIT 7303 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | Code Enforcement Case | . | |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 5 UNIT 5303 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 9 UNIT 10207 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 4 UNIT 4203 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 13 UNIT 13103 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 7 UNIT 7103 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 9 UNIT 9208 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 11 UNIT 11107 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 12 UNIT 12306 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 9 UNIT 10106 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 11 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 5 UNIT 5308 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 12 UNIT 12302 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 9 UNIT 10203 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 3 UNIT 3205 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 3 UNIT 3105 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 11 UNIT 11307 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 3 UNIT 3306 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 1 UNIT 1202 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 1 UNIT 1106 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 9 UNIT 9301 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 5 UNIT 5301 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 9 UNIT 10202 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 1 UNIT 1307 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 12 UNIT 12304 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 7 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 12 UNIT 12205 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 11 UNIT 11103 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 3 UNIT 3202 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 2 UNIT 2101 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 8 UNIT 8306 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 8 UNIT 8303 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 1 UNIT 1207 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 5 UNIT 5305 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 5 UNIT 5202 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 9 UNIT 9205 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 8 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 6 UNIT 6201 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 7 UNIT 7105 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 5 UNIT 5103 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 6 UNIT 6304 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 7 UNIT 7203 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 8 UNIT 8105 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 3 UNIT 3204 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 8 UNIT 8207 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 8 UNIT 8308 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 2 UNIT 2304 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 11 UNIT 11203 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 9 UNIT 9303 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 13 UNIT 13203 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 12 UNIT 12108 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 11 UNIT 11304 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 3 UNIT 3101 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 9 UNIT 10102 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 8 UNIT 8201 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 4 UNIT 4307 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 2 UNIT 2302 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 13 UNIT 13206 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 11 UNIT 11108 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 2 UNIT 2102 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 4 UNIT 4101 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 8 UNIT 8205 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 9 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 3 UNIT 3203 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 4 UNIT 4302 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 7 UNIT 7102 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 1 UNIT 1306 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 12 UNIT 12206 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 9 UNIT 10306 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 9 UNIT 10302 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 13 UNIT 13102 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 4 UNIT 4107 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 11 UNIT 11308 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 12 UNIT 12107 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 6 UNIT 6101 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 4 UNIT 4202 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 9 UNIT 9102 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 2 UNIT 2308 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 6 UNIT 6207 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 9 UNIT 9108 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 6 UNIT 6108 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 4 UNIT 4207 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 4 UNIT 4106 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 9 UNIT 9206 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 12 UNIT 12202 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 7 UNIT 7208 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 3 UNIT 3102 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 1 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 7 UNIT 7204 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 13 UNIT 13204 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 13 UNIT 13205 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 9 UNIT 10307 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 7 UNIT 7202 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 4 UNIT 4208 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 13 UNIT 13108 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 11 UNIT 11106 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 12 UNIT 12301 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 13 UNIT 13302 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 9 UNIT 9103 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 4 UNIT 4304 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 13 UNIT 13107 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 3 UNIT 3208 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 3 UNIT 3106 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 9 UNIT 10103 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 12 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 5 UNIT 5306 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 3 UNIT 3201 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 8 UNIT 8204 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 9 UNIT 10303 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 9 UNIT 9201 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 2 UNIT 2303 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 6 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 3 UNIT 3307 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 6 UNIT 6204 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 1 UNIT 1305 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 9 UNIT 9105 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 11 UNIT 11301 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 9 UNIT 10201 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 7 UNIT 7106 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 12 UNIT 12104 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 11 UNIT 11206 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 12 UNIT 12105 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 8 UNIT 8206 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 9 UNIT 10301 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 2 UNIT 2108 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 9 UNIT 9202 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 1 UNIT 1302 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 12 UNIT 12204 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 9 UNIT 9204 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 10 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 13 UNIT 13303 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 11 UNIT 11101 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 7 UNIT 7107 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 2 UNIT 2306 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 4 UNIT 4105 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 11 UNIT 11207 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 4 UNIT 4305 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 2 UNIT 2307 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 6 UNIT 6103 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 7 UNIT 7101 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 6 UNIT 6104 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 3 UNIT 3305 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 13 UNIT 13101 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 5 UNIT 5107 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 5 UNIT 5206 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 2 UNIT 2206 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 5 UNIT 5203 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 2 UNIT 2208 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 1 UNIT 1303 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 12 UNIT 12308 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 6 UNIT 6203 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 1 UNIT 1206 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 11 UNIT 11306 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 1 UNIT 1208 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 9 UNIT 10104 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 7 UNIT 7306 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 3 UNIT 3302 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 11 UNIT 11105 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 1 UNIT 1301 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 2 UNIT 2207 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 3 UNIT 3107 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 9 UNIT 9307 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 7 UNIT 7304 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 1 UNIT 1101 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 11 UNIT 11102 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 12 UNIT 12208 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 6 UNIT 6202 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 13 UNIT 13301 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 13 UNIT 13104 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 3 UNIT 3303 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 12 UNIT 12307 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 6 UNIT 6206 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 9 UNIT 10108 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 9 UNIT 10305 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 9 UNIT 9304 | Code Enforcement Case | . |
CE-VIO0324-01187 | Void | 03/28/2024 | N/A | BLDG 3 UNIT 3103 | Code Enforcement Case | . |
CE-VIO0424-01391 | Closed - resolved | 04/16/2024 | 05/23/2024 | BLDG 4 | Code Enforcement Case | High Priority / 3rd Level of Bldg 4 / Bees / Active bee swarm |
CE-VIO1123-06369 | Closed - resolved | 11/05/2023 | 11/05/2023 | BLDG 11 | Code Enforcement Case | TPD CALL OUT-WATER INTRUSION TO UNIT 11-106 FROM UNIT 11-206 |
T01VL00946 | Closed | 04/09/2001 | N/A | #13 | CODEVIOL | MIN HOUSING:ROACHES |
T01VL02509 | Closed | 08/30/2001 | N/A | 3 | CODEVIOL | MIN HOUSING:PLUMBING |
T03DV00628 | Complian | 07/10/2003 | N/A | 08 | DNR_VIOL | COMPLAINT:MIN HOUSING-BEES AND BIRDS |
T03DV01175 | Complian | 12/04/2003 | N/A | DNR_VIOL | COMPLAINT:MIN HOUSING-BEES | |
T05DV00072 | Invalid | 01/31/2005 | N/A | DNR_VIOL | COMPLAINT RE: MIN HOUSING- HAS 1 HOLE IN KITCHEN BEHIND REFRIGERATOR, 2ND HOLE UNDER KITCHEN SINK & 3RD HOLE IN BATHROOM BEHIND TOILET. ALL DUE TO PREVIOUS REPAIRS MADE TO PLUMBING. MAINT. PERSON NEVER RETURNED TO REPAIR OR PATCH UP THE HOLES. | |
T06DV01061 | Complian | 08/07/2006 | N/A | DNR_VIOL | PLAYGROUND AREA UNSAFE AROUND ROCK CLIMBING EQUIP// HAS 2 FT WIDE AREA WHERE CHILDREN FALL INTO//REPORTED LAST YEAR, STILL NOT REPAIRED OTHER CHILDREN HAVE FALLEN INTO ALSO. | |
T06DV01282 | Complian | 09/29/2006 | N/A | 9 | DNR_VIOL | A/C HAS NOT BEEN WORKING FOR 24 HOURS, TEMPORARY COOLING, HAS FANS. TENANT IS 48 YEARS OLD AND DISABLED. |
T07DV01545 | Void | 02/14/2007 | N/A | 5 | DNR_VIOL | ROACH INFESTATION, ROACHES ALL OVER, HAS 4 MONTH OLD BABY, //REPORTED SINCE DEC 2006 TO MGR |
T07DV05014 | Complian | 06/04/2007 | N/A | 7 | DNR_VIOL | RAT INFESTATION, HOLES IN THE WALL. REPORTED TO MGMT ABOUT 3 WEEKS AGO. NOTHING HAS BEEN DONE & MGMT ADVISED TENANT TO SET TRAPS. HAS 8 MONTH OLD CHILD; SPANISH SPEAKING. 7-10-07 CALLING ?'NG WHEN INSPECTOR DUE? CONCERNED FOR CHILD REGARDING RATS. RE-SHEDULED FROM 8-1 TO 7-13. RR |
T07DV07869 | Complian | 08/17/2007 | N/A | DNR_VIOL | 6200 S CAMPBELL AVE APT#8304. A/C UNIT DOES NOT BLOW OUT AIR SUFFICIENTLY AND AIR IS NOT COOLING ENOUGH/CALLER SAYS SHE WAS TOLD COILS WERE NEEDED BUT HAVE NOT BEEN FIXED. OCCUPANT HAS DIABETES AND A 5 MONTH OLD BABY. GT CSR HLUCCA | |
T07DV08411 | Noverify | 08/24/2007 | N/A | DNR_VIOL | ROACH INFESTATION, REPORTED IN JUNE, SENT PEST CONTROL, SPRAYED APARTMENT. | |
T07DV08714 | Invalid | 09/04/2007 | N/A | 9 | DNR_VIOL | MAJOR ROACH INFESTATION. SO UNINHABITABLE THAT TENANT HAD TO LEAVE APT. CAN'T WALK IN APT W/O STEPPING ON ROACHES. WL GV TO INSPECTOR SUPV. |
T07DV08863 | Void | 09/07/2007 | N/A | 7 | DNR_VIOL | A/C HASN'T WORKED IN OVER A MONTH. MGMNT WORKS ON PERIODICLY BUT HAS'NT FIXED. GTI SUPV L.VALDEZ |
T07DV10632 | Noverify | 10/05/2007 | N/A | DNR_VIOL | ROOF LEAKS. MANAGEMENT SAYS THEY WILL SEND SOMEONE OVER BUT NEVER DO. HAS BEEN LEAKING ALL SUMMER. HALLWAY, DINING ROOM AREA, BUBBLE IN THE CEILING BETWEEN THE DINING ROOM AND KITCHEN. IS LEAKING NOW WITHOUT RAIN. CALLER DID NOT KNOW MANAGER PHONE NUMBER, SHE ALWAYS WALKS TO OFFICE. LOS MONTANYOS APTS. | |
T07DV13383 | Complian | 12/28/2007 | N/A | 3 | DNR_VIOL | ELECTRICAL OUTLETS ARE LOOSE FROM WALL. WHEN CORD IS PLUGGED IN IT HANGS A LITTLE BUT IS STILL ON THE WALL NOT EXPOSING WIRES. ROACH INFESTATION, WEATHER STRIPPING NOT ON PROPERLY AND CAUSING HEAT LOSS. TENANT IS USING PORTABLE HEATERS TO KEEP WARM, WHEN TENANT USES TO MANY OUTLETS THE ELECT. TURNS OFF. TENANT HAS CHILD OF FOUR MONTHS. TEANT HAS CALLED AND REPORTED TO MANG. MANG SAID THEY WOULD SEND SOMEONE THE NEXT DAY AND NEVER DID. REPORTED MANY TIMES AFTER THAT WITH NO APPT OR WORK ORDER FOR MAINT. TO COME AND FIX. GTI SUPER SM 12/28/07 |
T07FR01419 | Field | 07/30/2007 | N/A | FIREINSP | Per Captain Mike Ward there is an access gate on the NW end of the complex (on Bilby) that has a knox box on it but the key does not work. The gate is in bad shape Captain Ward thinks that if a better gate system were placed there Fire would be more efficient in entering the property from the north in event of a fire. it might also make it worth while for us to use that entrance for medical calls (lots of speed bumps, crs kids) as it stands now, we would have to cut one or more chains and toss the gate to get through making it impractical to use of medical calls. another concern captain ward has is with the wires over the same entrance and the height restrictions cause by the wires and getting a ladder through | |
T07FR02172 | Complete | 10/23/2007 | N/A | FIREINSP | Complaint received from E14A | |
T08DV05737 | Complian | 07/09/2008 | N/A | #13307 | DNR_VIOL | MIN HOUSING: FRONT DOOR FRAME CRACKED, NO WEATHER STRIPPING, A COUPLE ELECTRICAL OUTLETS DON'T WORK OR HAVE SOCKETS COMING OUT, BURNER ON STOVE DOESN'T WORK, CARPET IS BURNT AND HAS FOUL ODOR. OCCUPANT STATES IS CURRENT WITH RENT; STATES REPORTED TO MGMT SINCE MOVE IN AND AGAIN LAST WEEK & NOTHING HAS BEEN REPAIRED. OCCUPANT STATES GIRLFRIEND IS PREGNANT & DOESN'T FEEL SAFE DUE TO FRONT DOOR NOT BEING FULLY SECURED. NOTE: INSPECTOR PLEASE CALL OCCUPANT PRIOR TO INSPECTION TO ENSURE SOMEONE IS HOME. |
T08DV08251 | Noverify | 09/08/2008 | N/A | #12 | DNR_VIOL | ROOF/ COOLER LEAK, WATER DAMAGE, WALL CUT OPEN BY MANAGEMENT, NO REPAIRS AS OF YET MADE. CALLER HAS TWO INFANTS. |
T09DV02547 | Cancel | 05/05/2009 | N/A | 1 | DNR_VIOL | APT #1204 - FLOOD DAMAGE DUE TO WATER PIPE IN WALL BREAKING |
T09DV02550 | Cancel | 05/06/2009 | N/A | 1 | DNR_VIOL | APT #1104 FLOOD DAMAGE DUE TO WATER PIPE BREAKING IN WALL |
T09DV02551 | Complian | 05/06/2009 | N/A | 1 | DNR_VIOL | APT #1103 - FLOOD DAMAGE DUE TO WATER PIPE BREAKING IN WALL |
T09DV03959 | Complian | 07/13/2009 | N/A | 1 | DNR_VIOL | A COUPLE OF WEEKS AGO LEAK IN BEDROOM; INFORMED MGMT AND MAINTENANCE A FEW WEEKS AGO AND NOTHING HAS BEEN REPAIRED. STATES NOW SMELL OF MOLD; ADVISED NOT A PART OF OUR JURISDICTION. HAS 4-YEAR OLD CHILD. CURRENT WITH RENT. |
T10DV00813 | Complian | 02/24/2010 | N/A | #12 | DNR_VIOL | Roof leaks in the master bedroom. Recent rains last week caused further interior damage. Management says the leak is fixed, and then the roof leaks again when it rains. Kitchen lights spark when the switch is turned on. Bathroom tiles do not stay attached to the shower wall. (Mold growing in the shower - caller told we do not inspect for mold). Stover burners not functioning correctly - caller told we can not assist with appliances. Tenant states he has not been offered another unit to live in. He feels it is unsafe to live in the apartment. He has a younger son living with him. |
T10FR01718 | Complete | 08/13/2010 | N/A | FIREINSP | complaint came by Maricruz Valenzuela manager of Del Moral Town Homes he states Las Montanas who is managed by Case Enterprise decided to put up a fence to separate properties, his concern is that they blocked an entrance so now Del Moral Apartments only has one entrance and exit to both the properties he states he has 152 units and Las Montanas has about 200+units. His concern is the access needed for emergencies. also the fire hydrants and access to them with this fence up | |
T11DV00856 | Complian | 02/11/2011 | N/A | 5 | DNR_VIOL | LAS MONTANAS APARTMENTS #5105 LEAK IN CLOSED LAST SUNDAY 02.06.11. MANAGEMENT INSTALLED A FAN AND REMOVED CAPRETING; HOWEVER, THEY ARE NOT DOING ANY FURTHER REPAIRS. MAINTENANCE DOES NOT KNOW HOW OR WHERE THE LEAK CAME FROM AND IS NOT CHECKING FOR INITIAL PROBLEM. |
T11DV04036 | Noverify | 06/06/2011 | N/A | DNR_VIOL | Los Montañes Apartments: Tree Fire on Sunday, 5/29/11. Electrical light pole near pool and club house by 3 palm trees is a possible safety hazard. | |
T11DV05078 | Complian | 07/06/2011 | N/A | 7 | DNR_VIOL | Roof is leaking. Maintenace has been out twice to fix the roof, but it still leaks from the second floor into unit. Kitchen sink is flooding. Faucet is not turned on and water is flowing out of the sink. Holes in kitchen wall that have not been patched. Maintenance has not resolved issues, kitchen sink can not be used at all. |
T11DV07280 | Noverify | 09/13/2011 | N/A | DNR_VIOL | Water leaks into apt when it rains. Porch area fills with water and comes in through windows and under sliding glass door. | |
T11DV09144 | Noverify | 11/08/2011 | N/A | DNR_VIOL | APT #5105, WATER LEAK FROM CEILING, COCKROACH INFESTATION | |
T11DV09528 | Complian | 11/28/2011 | N/A | 1 | DNR_VIOL | UNIT 1204 HAD BROKEN WATER LINE AND WATER WENT INTO THE UNIT OF 1103 |
T11DV09530 | Complian | 11/28/2011 | N/A | 1 | DNR_VIOL | UNIT HAD BROKEN WATER LINE IN THE BATHROOM BEHIND THE TOILET AND FLOODED UNIT |
T11DV09532 | Complian | 11/28/2011 | N/A | 1 | DNR_VIOL | COMMUNICATION CALLED AND T.F.D. ON SITE WITH A BROKEN WATER LINE, ALARM # 11-72044 |
T12DV00780 | Complian | 02/06/2012 | N/A | 1 | DNR_VIOL | Pipe broke. TFD called out for water damage on 2/05/2012. Water damage all over apartment. Carpet is still wet. A piece of drywall fell off the bathroom wall. |
T12DV01328 | Complian | 02/21/2012 | N/A | 3 | DNR_VIOL | BROKEN WATER LINE (CE05 AREA) |
T12DV01329 | Complian | 02/21/2012 | N/A | 3 | DNR_VIOL | FLOODED BY BROKEN WATER LINE UPSTAIRS |
T12DV01330 | Complian | 02/21/2012 | N/A | 3 | DNR_VIOL | FLOODED BY BROKEN WATER LINE UPSTAIRS |
T12DV04263 | Complian | 05/23/2012 | N/A | DNR_VIOL | TRASH AND DEBRIS | |
T12DV05149 | Complian | 06/20/2012 | N/A | DNR_VIOL | RAIL ON THE STAIRWELL | |
T12DV05169 | Complian | 06/20/2012 | N/A | DNR_VIOL | aPT #10308---> sink no draining for one week now. starting to smell inside apartment......weather stripping missing, water damage on ceilings, wasps nest on balcony | |
T12DV05502 | Complian | 06/28/2012 | N/A | 4 | DNR_VIOL | Floor unsecure. The floor under the bath tub and in the kitchen sinks down. Also complains about roaches, but did say the management sprays once a week. No filter in the A/C, but A/C works ok. |
T12DV05674 | Complian | 07/05/2012 | N/A | DNR_VIOL | CEILING COLLAPSED AND ACTIVE WATER LEAK | |
T12DV05694 | Complian | 07/06/2012 | N/A | DNR_VIOL | ROOF LEAK INTO THE UNIT | |
T12DV05695 | Complian | 07/06/2012 | N/A | DNR_VIOL | ROOF LEAK INTO THE UNIT | |
T12DV05710 | Complian | 07/06/2012 | N/A | DNR_VIOL | WATER LEAK IN THE WALL AND LEAKING TO BOTTOM UNIT | |
T12DV05854 | Complian | 07/13/2012 | N/A | 5 | DNR_VIOL | AIR CONDITIONER LEAKING |
T12DV05891 | Complian | 07/16/2012 | N/A | 4 | DNR_VIOL | LEAKS THROUGH FROM PATIO INTO HOUSE. |
T12DV05969 | Noverify | 07/18/2012 | N/A | 4 | DNR_VIOL | APARTMENT HAS FLOODED TWICE IN TWO WEEKS. WATER COMING THROUGH WALLS FROM NEIGHBORING APARTMENT. MANAGEMENT DID NOT REMOVE WATER (VACUUM ONLY) UNTIL AFTER TWO DAYS OF SITTING STAGNANT. OCCUPANT IS REQUESTING ANOTHER APARTMENT AND MANAGEMENT IS NOT RESPONDING. |
T12DV06416 | Complian | 07/31/2012 | N/A | #12 | DNR_VIOL | Leak in bathroom behind toilet, toilet constantly runs, faucet in kitchen doesn't not turn off completely. |
T12DV06438 | Complian | 08/01/2012 | N/A | DNR_VIOL | COOLER MAKING EXTREMELY LOUD NOISES - | |
T12DV06459 | Complian | 08/02/2012 | N/A | 1 | DNR_VIOL | EMMERGENCY CALL OUT PERSON FELL THOUGH LANDING |
T12DV06573 | Complian | 08/06/2012 | N/A | 3 | DNR_VIOL | Cockroach infestation, carpet has damage due to leak in A/C that went on for over a month, states mushrooms growing. Advised no jurisdiction over mold. States reported to manager about 2 weeks ago. |
T12DV06618 | Complian | 08/07/2012 | N/A | 1 | DNR_VIOL | HAZARDOUS LANDINGS / STAIRCASES |
T12DV06636 | Void | 08/07/2012 | N/A | 2 | DNR_VIOL | HAZARDOUS LANDINGS / STAIRCASES |
T12DV06637 | Void | 08/07/2012 | N/A | 3 | DNR_VIOL | HAZARDOUS LANDINGS / STAIRCASES |
T12DV06638 | Void | 08/07/2012 | N/A | DNR_VIOL | HAZARDOUS LANDINGS / STAIRCASES | |
T12DV06650 | Complian | 08/07/2012 | N/A | 2 | DNR_VIOL | HAZARDOUS LANDINGS / STAIRCASES |
T12DV06651 | Complian | 08/07/2012 | N/A | 3 | DNR_VIOL | HAZARDOUS LANDINGS / STAIRCASES |
T12DV06652 | Complian | 08/07/2012 | N/A | 4 | DNR_VIOL | HAZARDOUS LANDINGS / STAIRCASES |
T12DV06653 | Complian | 08/07/2012 | N/A | 5 | DNR_VIOL | HAZARDOUS LANDINGS / STAIRCASES |
T12DV06654 | Complian | 08/07/2012 | N/A | 6 | DNR_VIOL | HAZARDOUS LANDINGS / STAIRCASES |
T12DV06655 | Complian | 08/07/2012 | N/A | 7 | DNR_VIOL | HAZARDOUS LANDINGS / STAIRCASES |
T12DV06656 | Complian | 08/07/2012 | N/A | 8 | DNR_VIOL | HAZARDOUS LANDINGS / STAIRCASES |
T12DV06657 | Complian | 08/07/2012 | N/A | 9 | DNR_VIOL | HAZARDOUS LANDINGS / STAIRCASES |
T12DV06658 | Complian | 08/07/2012 | N/A | 9 | DNR_VIOL | HAZARDOUS LANDINGS / STAIRCASES |
T12DV06660 | Complian | 08/07/2012 | N/A | #11 | DNR_VIOL | HAZARDOUS LANDINGS / STAIRCASES |
T12DV06661 | Complian | 08/07/2012 | N/A | #12 | DNR_VIOL | HAZARDOUS LANDINGS / STAIRCASES |
T12DV06662 | Complian | 08/07/2012 | N/A | #13 | DNR_VIOL | HAZARDOUS LANDINGS / STAIRCASES |
T12DV06733 | Complian | 08/08/2012 | N/A | DNR_VIOL | NO ELECTRICITY IN APT AND AC IS LEAKING | |
T12DV07388 | Complian | 08/21/2012 | N/A | DNR_VIOL | AIR CONDITIONING OUT 11 DAYS | |
T12DV07454 | Complian | 08/22/2012 | N/A | DNR_VIOL | Unit #3205 ---> A/C been out for two weeks | |
T12DV09774 | Noverify | 10/17/2012 | N/A | 1 | DNR_VIOL | No A/C in the apartment, management has not successfully fixed the unit. |
T12DV09791 | Complian | 10/18/2012 | N/A | 6 | DNR_VIOL | Air conditioner not working 2900E |
T12DV09792 | Complian | 10/18/2012 | N/A | #12 | DNR_VIOL | Apt# 12206 ----> A/C leaking for past two months |
T12DV10642 | Complian | 11/20/2012 | N/A | #12 | DNR_VIOL | RANCHO DEL MAR APARTMENTS - Unit #12201 (tenant spanish speaker) Cockroach infestation, missing cabinet doors in kitchen, water leaking into wall from bath tub faucet. |
T13DV02197 | Complian | 04/08/2013 | N/A | DNR_VIOL | SEWAGE BACKING UP INTO APTS | |
T13DV02198 | Complian | 04/08/2013 | N/A | DNR_VIOL | SEWAGE BACKING UP INTO APTS | |
T13DV02199 | Complian | 04/08/2013 | N/A | DNR_VIOL | SEWAGE BACKING UP INTO APTS | |
T13DV02229 | Complian | 04/08/2013 | N/A | 8 | DNR_VIOL | Tenant has killed over 100 roaches within 10 ten days. Management is not addressing roach issue. Also the bathroom toilet is not secure. It is tilted and not working well. Also reported to management. |
T13DV03005 | Complian | 05/07/2013 | N/A | DNR_VIOL | ROACHES/ SHOWER- USED DUCT TO FIX/ STOVE- ONLY ONE BURNER WORKS- UNIT 6201 | |
T13DV03172 | Complian | 05/09/2013 | N/A | DNR_VIOL | MAIN WALL DETERIORATED | |
T13DV04168 | Complian | 06/14/2013 | N/A | 1 | DNR_VIOL | No Cooling in the apt. |
T13DV04253 | Complian | 06/19/2013 | N/A | DNR_VIOL | INTERIOR WATER DAMAGE, WALLS CARPET FLOORING | |
T13DV04552 | Complian | 07/01/2013 | N/A | DNR_VIOL | Water leak from ceiling to floor through ventilation unit | |
T13DV04746 | Complian | 07/08/2013 | N/A | #13 | DNR_VIOL | Leaks from window frames, flooring damaged from water, paint is peeling. |
T13DV04789 | Complian | 07/09/2013 | N/A | DNR_VIOL | CEILING DAMAGE FROM THE RAINS | |
T13DV04792 | Complian | 07/09/2013 | N/A | DNR_VIOL | ROOF DAMAGE unit # 9 | |
T13DV04910 | Complian | 07/11/2013 | N/A | 6 | DNR_VIOL | Ceiling damage from the storm. |
T13DV04989 | Complian | 07/12/2013 | N/A | 7 | DNR_VIOL | A/c not working, ceiling leaking. The shower tiles are off in the bathroom, been off for three months. Managment's solution was to duct tape platic up on the walls. |
T13DV05293 | Complian | 07/23/2013 | N/A | #11 | DNR_VIOL | MINIMAL HOUSOING CONDITIONS-DRYWALL DETERIORATION |
T13DV05294 | Complian | 07/23/2013 | N/A | #11 | DNR_VIOL | ROOF IS DAMAGED |
T13DV05329 | Complian | 07/24/2013 | N/A | 7 | DNR_VIOL | ROOF DAMAGE |
T13DV05330 | Complian | 07/24/2013 | N/A | 6 | DNR_VIOL | ROOF DAMAGE |
T13DV05333 | Complian | 07/24/2013 | N/A | DNR_VIOL | ROOF DAMAGE | |
T14DV00648 | Complian | 02/04/2014 | N/A | DNR_VIOL | SECURITY FENCE FOR POOL IS DETERIORATED | |
T14DV01976 | Complian | 03/26/2014 | N/A | 5 | DNR_VIOL | BACKED UP SEWER LINE |
T14DV01980 | Complian | 03/26/2014 | N/A | 5 | DNR_VIOL | PLUGGED SEWER LINE |
T14DV01982 | Complian | 03/26/2014 | N/A | 5 | DNR_VIOL | CLOGGED SEWER LINE |
T14DV04169 | Complian | 06/24/2014 | N/A | 7 | DNR_VIOL | BATHROOM TILE IS FALLING DOWN |
T15DV05477 | Complian | 07/24/2015 | N/A | DNR_VIOL | GRAFFITI- ALL OVER WALL FACING BILBY RD AND FACING SUNNYSIDE HIGH SCHOOL. | |
T15DV09792 | Complian | 12/21/2015 | N/A | DNR_VIOL | Plumbing-kitchen sink, a/c, heat, cochroach infestation | |
T16DV05427 | Complian | 09/07/2016 | N/A | DNR_VIOL | Excessive vegetation and/or weeds | |
T16DV07478 | Complian | 10/26/2016 | N/A | DNR_VIOL | UNIT 9304: LEAKING CEILING AND WINDOWS, ISSUE HAS BEEN BROUGHT TO LANDLORD IN MARCH, LANDLORD CONTINUES TO SAY THAT IT WILL BE FIXED, THOUGH NEVER GETS AROUND TO IT. | |
T17DV02443 | Complian | 06/11/2017 | N/A | #13 | DNR_VIOL | FIRE DAMAGE |
T17DV02444 | Complian | 06/11/2017 | N/A | #13 | DNR_VIOL | INTERIOR INSPECTION REQUIRED |
T17DV02445 | Complian | 06/11/2017 | N/A | #13 | DNR_VIOL | FIRE DAMAGE |
T18DV05815 | Complian | 09/17/2018 | N/A | 8 | DNR_VIOL | LEAK COMING IN THROUGH THE CEILING |
T20DV01515 | Void | 02/27/2020 | N/A | 8 | DNR_VIOL | roaches infestation |
T20DV04562 | Complian | 07/06/2020 | N/A | 6 | DNR_VIOL | ROACHES INFESTATION IN UNIT |
T20DV06303 | Complian | 09/16/2020 | N/A | #13 | DNR_VIOL | person at this address is working on vehicles in the parking lot of apartment complex suburban 1970s model white 4 door 1990s impala busted windows and a little black sedan import maybe running a mechanic business |
T21DV01046 | Complian | 02/25/2021 | N/A | DNR_VIOL | BANNER HAS BEEN PLACED ON THE MASONARY WALL ON THE FRONT OF THE PROPERTY | |
T21DV01156 | Complian | 03/02/2021 | N/A | 2 | DNR_VIOL | pest control and caulking not being down |
T21DV08145 | Complian | 11/15/2021 | N/A | DNR_VIOL | FIRE DAMAGE TO GLULAM BEAM NEXT TO UNIT 13208 | |
T22DV02369 | Complian | 04/11/2022 | N/A | 9 | DNR_VIOL | Open wall after fixing leak |
T99VL02212 | Complian | 08/17/1999 | N/A | CODEVIOL | COMPLAINT:SIGN:FLAGS/A-FRAMES |