Address: 6200 S CAMPBELL AV
Date - 11/22/2024 1:48 p.m.
Total Number Of Annexations & Original City Zoning (1)
Rezoning Cases
Date - 11/22/2024 1:48 p.m.
Total Number Of Rezone Cases - (1)
Case No. | Description | New Zone | Status | Status Date |
---|---|---|---|---|
C9-85-62 | Pima Savings - Bilby Road | R-3 | Effectuated | 05/20/2010 |
Special Development Requests & Requirements
Address: 6200 S CAMPBELL AV
Date - 11/22/2024 1:48 p.m.
Total Number Of Special Development Permits - (6)
Activity Number | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
H000011226 | CLOSED | 01/27/2020 | N/A | Historical Information | ||
T13SA00156 | COMPLETE | 06/12/2013 | N/A | Zoning Adminstration Letter | ||
T15SA00238 | COMPLETE | 07/13/2015 | N/A | Zoning Adminstration Letter | ||
T16SA00425 | COMPLETE | 10/18/2016 | N/A | Zoning Adminstration Letter | ||
T20SA00021 | COMPLETE | 01/09/2020 | N/A | Zoning Adminstration Letter | ZONING LETTER | |
T22SA00434 | COMPLETE | 09/15/2022 | N/A | Zoning Adminstration Letter | Zoning Compliance Letter for Multifamily |
Permits
Address: 6200 S CAMPBELL AV
Date - 11/22/2024 1:48 p.m.
Total Number Of Permits - (366)
Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TC-RES-0823-07615 | Complete | 08/25/2023 | 04/02/2024 | BLDG 5 UNIT 5303 | Residential Building - One or Two Family | Apartment with no power for six months |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project | |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1105 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1106 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1107 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1108 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1201 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1202 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1203 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1204 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1205 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1206 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1207 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1208 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1301 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1302 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1303 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1304 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1305 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1306 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1307 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 1 UNIT 1308 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 10 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11105 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11106 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11107 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11108 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11201 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11202 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11203 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11204 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11205 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11206 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11207 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11208 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11301 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11302 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11303 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11304 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11305 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11306 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11307 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 11 UNIT 11308 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12105 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12106 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12107 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12108 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12201 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12202 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12203 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12204 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12205 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12206 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12207 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12208 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12301 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12302 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12303 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12304 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12305 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12306 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12307 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 12 UNIT 12308 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13105 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13106 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13107 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13108 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13201 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13202 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13203 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13204 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13205 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13206 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13207 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13208 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13301 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13302 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13303 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13304 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13305 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13306 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13307 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 13 UNIT 13308 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2105 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2106 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2107 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2108 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2201 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2202 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2203 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2204 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2205 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2206 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2207 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2208 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2301 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2302 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2303 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2304 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2305 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2306 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2307 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 2 UNIT 2308 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3105 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3106 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3107 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3108 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3201 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3202 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3203 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3204 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3205 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3206 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3207 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3208 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3301 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3302 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3303 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3304 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3305 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3306 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3307 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 3 UNIT 3308 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4105 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4106 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4107 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4108 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4201 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4202 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4203 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4204 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4205 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4206 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4207 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4208 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4301 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4302 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4303 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4304 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4305 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4306 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4307 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 4 UNIT 4308 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5105 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5106 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5107 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5108 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5201 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5202 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5203 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5204 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5205 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5206 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5207 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5208 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5301 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5302 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5303 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5304 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5305 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5306 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5307 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 5 UNIT 5308 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6105 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6106 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6107 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6108 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6201 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6202 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6203 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6204 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6205 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6206 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6207 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6208 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6301 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6302 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6303 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6304 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6305 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6306 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6307 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 6 UNIT 6308 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7105 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7106 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7107 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7108 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7201 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7202 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7203 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7204 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7205 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7206 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7207 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7208 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7301 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7302 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7303 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7304 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7305 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7306 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7307 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 7 UNIT 7308 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8105 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8106 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8107 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8108 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8201 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8202 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8203 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8204 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8205 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8206 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8207 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8208 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8301 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8302 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8303 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8304 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8305 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8306 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8307 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 8 UNIT 8308 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10105 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10106 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10107 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10108 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10201 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10202 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10203 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10204 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10205 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10206 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10207 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10208 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10301 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10302 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10303 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10304 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10305 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10306 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10307 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 10308 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9101 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9102 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9103 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9104 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9105 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9106 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9107 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9108 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9201 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9202 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9203 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9204 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9205 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9206 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9207 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9208 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9301 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9302 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9303 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9304 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9305 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9306 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9307 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TR-ROW-0623-00898 | Complete | 06/22/2023 | 08/27/2023 | BLDG 9 UNIT 9308 | Right-of-Way (ROW) | Air-vacuum excavation of 30 utility potholes for the design phase of Tucson DOT Prop 411 Neighborhood St. Improvements Bilby Rd Modernization Project |
TC-RES-0624-03474 | Void | 06/10/2024 | N/A | BLDG 7 UNIT 7202 | Residential Building - One or Two Family | VOID:YL - Unable to process, incorrect permit type. A property with more than 2 units is multi-family and considered to be commercial. Please re-apply under "Commercial Trade Permit" and utilize the commercial reconnect form linked below. Commercial reconnect Form: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/commercial-permits/electrical-reconnect-information-sheet-commercial.pdf For questions: Building_Official@tucsonaz.gov ** -ELECTRIC RECONNECT |
TC-RES-0624-03476 | Void | 06/10/2024 | N/A | BLDG 8 UNIT 8207 | Residential Building - One or Two Family | VOID:YL - Unable to process, incorrect permit type. A property with more than 2 units is multi-family and considered to be commercial. Please re-apply under "Commercial Trade Permit" and utilize the commercial reconnect form linked below. Commercial reconnect Form: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/commercial-permits/electrical-reconnect-information-sheet-commercial.pdf For questions: Building_Official@tucsonaz.gov -RECONNECT ELETRIC |
TC-RES-0624-03498 | Issued | 06/10/2024 | 02/16/2025 | BLDG 7 UNIT 7202 | Residential Building - One or Two Family | ELECTRIC RECINNECT |
TC-RES-0624-03499 | Complete | 06/10/2024 | 02/11/2025 | BLDG 8 UNIT 8207 | Residential Building - One or Two Family | ELECTRIC RECONNECT |
TC-RES-0524-03219 | Void | 05/28/2024 | N/A | BLDG 8 UNIT 8207 | Residential Building - One or Two Family | VOID:YL - Unable to process, incorrect permit type. A property with more than 2 units is multi-family and considered to be commercial. Please re-apply under "Commercial Trade Permit" and utilize the commercial reconnect form linked below. Commercial reconnect Form: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/commercial-permits/electrical-reconnect-information-sheet-commercial.pdf For questions: Building_Official@tucsonaz.gov -reconnect Eletric |
TC-COM-0424-00666 | Issued | 04/12/2024 | 10/12/2024 | BLDG 6 UNIT 6306 | Commercial Building | Electrical reconnect |
TR-ROW-0323-00502 | Complete | 03/16/2023 | 05/10/2023 | BLDG 6 UNIT 6106 | Right-of-Way (ROW) | Perform 7-inch diameter soil borings to depths of approximately 3 feet below existing site grade along Bilby Road between 12th Avenue and Country Club Road to obtain soil samples for a pavement section design |
TR-UTL-0324-00435 | Complete | 03/04/2024 | 08/18/2024 | BLDG 1 | Right-of-Way (ROW) - Utility | PRJ265729-1 Cox to Place new PED and transfer riser to new pole. |
DP13-0043 | CLOSED | 03/13/2013 | N/A | DEVPKG | SITE ONLY | |
T01AN00339 | ISSUED | 04/24/2001 | N/A | #13 | ADDRNEW | |
T01EL01464 | FINAL | 06/07/2001 | 12/08/2001 | 08 | ELECT | RECONNECT:ELECTRIC:APT |
T01EL01530 | FINAL | 06/12/2001 | 12/11/2001 | 1 | ELECT | RECONNECT:ELECTRIC APARTMENTS |
T01EL01918 | FINAL | 07/20/2001 | 01/19/2002 | 5 | ELECT | RECONNECT:ELECTRICAL |
T02EL01902 | FINAL | 09/19/2002 | 03/25/2003 | 3 | ELECT | ELECTRIC:RECONNECT |
T02EL02210 | FINAL | 11/12/2002 | 05/13/2003 | 4 | ELECT | RECONNECT:ELECTRIC APARTMENT |
T03EL02265 | FINAL | 11/19/2003 | 05/18/2004 | 5 | ELECT | RECONNECT:ELECTRIC:APARTMENT |
T06EL00358 | FINAL | 02/22/2006 | 09/24/2006 | ELECT | ELECTRIC:SERVICE & RECPT | |
T06EL02190 | EXPIRED | 11/02/2006 | 05/08/2007 | 7 | ELECT | RECONNECT:ELECTRIC APARTMENT |
T08EL01159 | FINAL | 06/24/2008 | 01/04/2009 | 1 | ELECT | ELECTRIC:RECONNECT APARTMENT |
T08EL01160 | FINAL | 06/24/2008 | 01/04/2009 | 2 | ELECT | ELECTRIC:RECONNECT APARTMENT |
T08EL01161 | FINAL | 06/24/2008 | 01/04/2009 | 9 | ELECT | ELECTRIC:RECONNECT APARTMENT |
T08EL01377 | FINAL | 07/23/2008 | 01/25/2009 | #11 | ELECT | ELECTRICAL RECONNECT |
T08EL01809 | FINAL | 09/16/2008 | 03/18/2009 | 4 | ELECT | RECONNECT:ELECTRIC APARTMENT |
T08EL01924 | FINAL | 10/07/2008 | 04/08/2009 | 9 | ELECT | ELECTRICAL RECONNECT |
T09EL01172 | FINAL | 05/15/2009 | 11/15/2009 | #11 | ELECT | RECONNECT: ELECTRIC; APT# 11103 |
T12CM06142 | FINAL | 10/02/2012 | 10/06/2013 | #11 | COMBO | REPAIR:STAIR CASES BLDG 1 THUR 13 T12DV06660 |
T12OT00809 | EXPIRED | 05/24/2012 | 12/29/2012 | SIGN | SIGN (MONUMENT SIGN) 20492 | |
T13CM01253 | FINAL | 03/05/2013 | 09/04/2013 | 4 | COMBO | RECONNECT ELECTRIC; APT # 4205 |
T13CM01441 | EXPIRED | 03/13/2013 | 11/20/2013 | COMBO | INSTALL NEW GUARD AND ENTRY GATES | |
T14CM01691 | FINAL | 03/26/2014 | 03/23/2015 | COMBO | REPAIR SEWER LINE IN PARKING LOT | |
T15CM00430 | EXPIRED | 01/21/2015 | 07/21/2015 | #12 | COMBO | INSTALL 100 AMP MAIN BREAKER - TEP METER CHANGEOUT PROGRAM - APTS (APA) |
T15CM02296 | FINAL | 04/08/2015 | 10/14/2015 | 7 | COMBO | REPLACE MAIN ELECTRIC BREAKER |
T15CM08337 | FINAL | 11/27/2015 | 07/24/2016 | #11 | COMBO | (T15DV05929) CAR IN TO BLDG |
T16CM08252 | FINAL | 10/31/2016 | 05/02/2017 | 7 | COMBO | ELECTRIC RECONNECT |
T17CM04707 | L OF C | 06/16/2017 | 04/09/2018 | #13 | COMBO | (T17DV02445) FIRE DAMAGE |
T18CM01115 | FINAL | 02/13/2018 | 08/25/2018 | #13 | COMBO | ELECTRICAL RECONNECT |
T20RW05765 | FINAL | 10/21/2020 | 12/20/2020 | ROW | Starting on the South/West side of Bilby and Campbell Repair Cable 90' going East continue going South 2578' and Riser down. BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. | |
T22CM00969 | FINAL | 02/08/2022 | 09/25/2022 | COMBO | Replaced Glulam beam damaged by fire. Cigarette was put out between the two beams which caught fire. Beam is supported by steel post with 3" top plate which supports the beams. Replaced damaged beams and fascia with like for like. Damage on second story next to unit 13208. Roof jack up existing stairs and deck, demo existing damaged beams and fascia, replaced with like for like, install new lags and bolts. Documents attached are 1. property map showing where repairs were done on property unit 13208. 2. Delmar 1-3 pictures are damage before repairs. 3. Repairs 1-5 are pictures after repairs done. | |
T22CM03476 | FINAL | 05/06/2022 | 11/09/2022 | 8308 | COMBO | Reconnect |
Code Enforcement
Address: 6200 S CAMPBELL AV
Date - 11/22/2024 1:48 p.m.
Total Number Of Code Cases - (330)
Case Number | Case Status | Entered Date | Exp Date | Unit | Type | Description |
---|---|---|---|---|---|---|
CE-VIO1123-06370 | Closed - Resolved | 11/05/2023 | 11/05/2023 | BLDG 11 | TFD-EMERGENCY CALL OUT FOR WATER INTRUSION TO UNIT 11-206 | |
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 9 UNIT 10204 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 11 UNIT 11302 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 1 UNIT 1203 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 5 UNIT 5304 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 5 UNIT 5205 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 8 UNIT 8102 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 4 UNIT 4104 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 11 UNIT 11204 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 7 UNIT 7305 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 4 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 1 UNIT 1201 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 8 UNIT 8208 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 13 UNIT 13305 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 9 UNIT 10101 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 1 UNIT 1103 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 5 UNIT 5204 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 9 UNIT 9306 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 12 UNIT 12101 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 9 UNIT 10206 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 1 UNIT 1105 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 1 UNIT 1102 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 9 UNIT 9207 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 3 UNIT 3108 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 5 UNIT 5108 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 9 UNIT 9305 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 5 UNIT 5102 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 4 UNIT 4308 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 8 UNIT 8304 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 5 UNIT 5302 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 4 UNIT 4108 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 6 UNIT 6105 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 6 UNIT 6307 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 7 UNIT 7207 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 2 UNIT 2305 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 2 UNIT 2107 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 2 UNIT 2104 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 13 UNIT 13306 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 3 UNIT 3301 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 2 UNIT 2301 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 5 UNIT 5307 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 3 UNIT 3207 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 8 UNIT 8104 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 6 UNIT 6205 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 6 UNIT 6102 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 13 UNIT 13208 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 13 UNIT 13105 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 5 UNIT 5208 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 8 UNIT 8107 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 12 UNIT 12201 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 11 UNIT 11201 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 4 UNIT 4301 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 8 UNIT 8305 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 4 UNIT 4306 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 2 UNIT 2205 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 1 UNIT 1304 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 8 UNIT 8202 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 7 UNIT 7104 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 12 UNIT 12207 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 9 UNIT 10107 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 2 UNIT 2103 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 8 UNIT 8108 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 9 UNIT 9203 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 9 UNIT 9302 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 7 UNIT 7201 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 8 UNIT 8302 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 2 UNIT 2106 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 6 UNIT 6107 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 2 UNIT 2201 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 7 UNIT 7206 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 9 UNIT 10208 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 12 UNIT 12305 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 4 UNIT 4201 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 9 UNIT 9104 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 8 UNIT 8106 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 1 UNIT 1204 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 3 UNIT 3104 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 9 UNIT 10105 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 4 UNIT 4102 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 13 UNIT 13207 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 11 UNIT 11205 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 8 UNIT 8103 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 7 UNIT 7302 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 2 UNIT 2105 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 9 UNIT 10304 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 1 UNIT 1108 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 7 UNIT 7307 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 2 UNIT 2203 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 1 UNIT 1107 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 12 UNIT 12102 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 13 UNIT 13106 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 11 UNIT 11104 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 4 UNIT 4205 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 4 UNIT 4303 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 2 UNIT 2202 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 13 UNIT 13304 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 1 UNIT 1205 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 13 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 9 UNIT 10205 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 6 UNIT 6308 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 5 UNIT 5104 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 4 UNIT 4204 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 12 UNIT 12103 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 4 UNIT 4206 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 13 UNIT 13307 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 13 UNIT 13201 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 3 UNIT 3308 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 11 UNIT 11305 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 6 UNIT 6306 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 6 UNIT 6106 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 9 UNIT 9101 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 3 UNIT 3304 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 6 UNIT 6301 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 8 UNIT 8203 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 5 UNIT 5105 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 5 UNIT 5207 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 6 UNIT 6303 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 6 UNIT 6305 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 1 UNIT 1104 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 7 UNIT 7108 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 11 UNIT 11208 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 12 UNIT 12303 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 5 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 9 UNIT 9308 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 4 UNIT 4103 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 11 UNIT 11303 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 5 UNIT 5101 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 13 UNIT 13308 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 2 UNIT 2204 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 9 UNIT 10308 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 12 UNIT 12203 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 13 UNIT 13202 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 8 UNIT 8307 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 9 UNIT 9106 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 12 UNIT 12106 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 7 UNIT 7308 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 3 UNIT 3206 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 1 UNIT 1308 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 2 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 8 UNIT 8301 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 6 UNIT 6302 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 5 UNIT 5201 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 9 UNIT 9107 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 5 UNIT 5106 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 6 UNIT 6208 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 7 UNIT 7301 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 7 UNIT 7205 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 8 UNIT 8101 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 3 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 11 UNIT 11202 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 7 UNIT 7303 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | . | |||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 5 UNIT 5303 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 9 UNIT 10207 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 4 UNIT 4203 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 13 UNIT 13103 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 7 UNIT 7103 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 9 UNIT 9208 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 11 UNIT 11107 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 12 UNIT 12306 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 9 UNIT 10106 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 11 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 5 UNIT 5308 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 12 UNIT 12302 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 9 UNIT 10203 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 3 UNIT 3205 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 3 UNIT 3105 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 11 UNIT 11307 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 3 UNIT 3306 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 1 UNIT 1202 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 1 UNIT 1106 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 9 UNIT 9301 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 5 UNIT 5301 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 9 UNIT 10202 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 1 UNIT 1307 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 12 UNIT 12304 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 7 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 12 UNIT 12205 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 11 UNIT 11103 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 3 UNIT 3202 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 2 UNIT 2101 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 8 UNIT 8306 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 8 UNIT 8303 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 1 UNIT 1207 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 5 UNIT 5305 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 5 UNIT 5202 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 9 UNIT 9205 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 8 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 6 UNIT 6201 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 7 UNIT 7105 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 5 UNIT 5103 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 6 UNIT 6304 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 7 UNIT 7203 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 8 UNIT 8105 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 3 UNIT 3204 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 8 UNIT 8207 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 8 UNIT 8308 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 2 UNIT 2304 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 11 UNIT 11203 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 9 UNIT 9303 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 13 UNIT 13203 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 12 UNIT 12108 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 11 UNIT 11304 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 3 UNIT 3101 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 9 UNIT 10102 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 8 UNIT 8201 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 4 UNIT 4307 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 2 UNIT 2302 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 13 UNIT 13206 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 11 UNIT 11108 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 2 UNIT 2102 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 4 UNIT 4101 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 8 UNIT 8205 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 9 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 3 UNIT 3203 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 4 UNIT 4302 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 7 UNIT 7102 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 1 UNIT 1306 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 12 UNIT 12206 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 9 UNIT 10306 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 9 UNIT 10302 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 13 UNIT 13102 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 4 UNIT 4107 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 11 UNIT 11308 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 12 UNIT 12107 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 6 UNIT 6101 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 4 UNIT 4202 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 9 UNIT 9102 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 2 UNIT 2308 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 6 UNIT 6207 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 9 UNIT 9108 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 6 UNIT 6108 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 4 UNIT 4207 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 4 UNIT 4106 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 9 UNIT 9206 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 12 UNIT 12202 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 7 UNIT 7208 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 3 UNIT 3102 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 1 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 7 UNIT 7204 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 13 UNIT 13204 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 13 UNIT 13205 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 9 UNIT 10307 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 7 UNIT 7202 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 4 UNIT 4208 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 13 UNIT 13108 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 11 UNIT 11106 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 12 UNIT 12301 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 13 UNIT 13302 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 9 UNIT 9103 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 4 UNIT 4304 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 13 UNIT 13107 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 3 UNIT 3208 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 3 UNIT 3106 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 9 UNIT 10103 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 12 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 5 UNIT 5306 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 3 UNIT 3201 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 8 UNIT 8204 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 9 UNIT 10303 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 9 UNIT 9201 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 2 UNIT 2303 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 6 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 3 UNIT 3307 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 6 UNIT 6204 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 1 UNIT 1305 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 9 UNIT 9105 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 11 UNIT 11301 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 9 UNIT 10201 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 7 UNIT 7106 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 12 UNIT 12104 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 11 UNIT 11206 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 12 UNIT 12105 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 8 UNIT 8206 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 9 UNIT 10301 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 2 UNIT 2108 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 9 UNIT 9202 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 1 UNIT 1302 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 12 UNIT 12204 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 9 UNIT 9204 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 10 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 13 UNIT 13303 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 11 UNIT 11101 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 7 UNIT 7107 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 2 UNIT 2306 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 4 UNIT 4105 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 11 UNIT 11207 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 4 UNIT 4305 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 2 UNIT 2307 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 6 UNIT 6103 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 7 UNIT 7101 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 6 UNIT 6104 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 3 UNIT 3305 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 13 UNIT 13101 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 5 UNIT 5107 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 5 UNIT 5206 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 2 UNIT 2206 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 5 UNIT 5203 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 2 UNIT 2208 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 1 UNIT 1303 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 12 UNIT 12308 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 6 UNIT 6203 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 1 UNIT 1206 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 11 UNIT 11306 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 1 UNIT 1208 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 9 UNIT 10104 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 7 UNIT 7306 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 3 UNIT 3302 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 11 UNIT 11105 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 1 UNIT 1301 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 2 UNIT 2207 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 3 UNIT 3107 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 9 UNIT 9307 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 7 UNIT 7304 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 1 UNIT 1101 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 11 UNIT 11102 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 12 UNIT 12208 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 6 UNIT 6202 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 13 UNIT 13301 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 13 UNIT 13104 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 3 UNIT 3303 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 12 UNIT 12307 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 6 UNIT 6206 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 9 UNIT 10108 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 9 UNIT 10305 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 9 UNIT 9304 | . | ||
CE-VIO0324-01187 | Void | 03/28/2024 | BLDG 3 UNIT 3103 | . | ||
CE-VIO0424-01391 | Closed - Resolved | 04/16/2024 | 05/23/2024 | BLDG 4 | High Priority / 3rd Level of Bldg 4 / Bees / Active bee swarm | |
CE-VIO0324-01188 | Closed - Resolved | 03/28/2024 | 08/01/2024 | PNI : Property maintenance deficiencies and need structure repairs. | ||
CE-VIO1123-06369 | Closed - Resolved | 11/05/2023 | 11/05/2023 | BLDG 11 | TPD CALL OUT-WATER INTRUSION TO UNIT 11-106 FROM UNIT 11-206 |