Parcel Search: 138192530
Parcel Search
Parcel Attributes
| Parcel | 138192530 |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | R-1 |
| Tucson Ward | Ward 1 |
| Tucson Registered Neighborhood | Barrio Nopal |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Address | |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Date - 05/17/2026 1:05 a.m.
Total Number Of OZC Plans - (1)
Rezoning Cases
Date - 05/17/2026 1:05 a.m.
Total Number Of Rezone Cases - (1)
| Case No. | Description | New Zone | Status | Status Date | Address |
|---|---|---|---|---|---|
| TP-ENT-1025-00018 | 402 & 430 W Medina Rd Rezoning | In review | 10/10/2025 | 430 W MEDINA |
Permits
Parcel Number - 138192530
Date - 05/17/2026 1:05 a.m.
Total Number Of Permits - (53)
| Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TF-FCP-0225-00134 | Complete | 02/11/2025 | 09/04/2025 | Fire Construction Permit | Provide and install a new automatic and manual fire alarm system. All wiring to be class B. | |
| T21CM01864 | Expired | 03/03/2021 | 09/22/2021 | Residential Building - One or Two Family | upgrading panel to 200amps | |
| T22CM02647 | Complete | 04/12/2022 | 10/18/2025 | Commercial Building | New construction Adult Day Care Facility 6080 sf | |
| TR-ROW-0424-00420 | Inspections | 04/18/2024 | 08/22/2024 | Right-of-Way (ROW) | Install new manhole for 8” Sewer Main at 430 W Medina . 100FT Excavation. Full road closure - 24HR Closure - 7AM-3:30 Updated 5/21/2024 Request for 90 Day Renewal as of 5/24/2024 | |
| TR-UTL-0426-00686 | Issued | 04/20/2026 | 07/03/2026 | Right-of-Way (ROW) - Utility | WO T179436. TEP will remove 1 pole in ROW, dig 2’X2’ 6’deep hole with no sidewalk impact. | |
| TD-DEV-0524-00164 | Void | 05/29/2024 | 05/29/2025 | Development Package | *VOID- customer needs to submit this revision under their existing DP21-0313* Development Package for Sunshine DTA Adult Day Care Facility | |
| TR-UTL-0624-01214 | Complete | 06/25/2024 | 10/14/2024 | Right-of-Way (ROW) - Utility | Cox to overlash 44' for system tie. | |
| TR-UTL-0825-01249 | Complete | 08/01/2025 | 11/16/2025 | Right-of-Way (ROW) - Utility | WO T154165. TEP to work in Medina Road ROW to replace utility pole. | |
| TR-UTL-1223-03085 | Complete | 12/18/2023 | 01/17/2024 | Right-of-Way (ROW) - Utility | 430 W MEDINA RD 15 13 13 NW EMERGENCY SERVICE LINE REPAIR AT THE SOUTHSIDE OF THE ADDRESS WORK ORDER 2640093 | |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. | |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 1 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 1 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 2 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 2 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 3 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 3 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 3 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 4 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 4 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 4 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 5 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 6 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 7 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 10 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 11 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 12 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 13 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 14 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 15 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 16 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 17 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 18 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 19 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 19A | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 19B | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 19C | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 2101 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 2104 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 3 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 3101 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 3102 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 4 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 5 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 6 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 7 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 8 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 9 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT M1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT M2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
Plans
Parcel Number - 138192530
Date - 05/17/2026 1:05 a.m.
Total Number Of Plans - 3
| Plan Number | Plan Status | Application Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TP-AMD-1025-00001 | In review | 10/10/2025 | N/A | Map/Use Change - Amendments | Reference Preapplication: TP-PRE-1024-000242 Plan Amendment for 430 & 402 W. Medina | |
| TP-ENT-1025-00018 | In review | 10/10/2025 | N/A | Map/Use Changes - Entitlements | REFERENCE PREAPPLICATION: TP-PRE-1024000242 430 W. Medina has an adult day care center. The O2 zoning provides fewer restrictions on the number of clients. 402 W. Medina will be able to include an administrative office for the locally owned business if zoned as O2. | |
| TP-PRE-1024-00242 | Complete | 10/17/2024 | N/A | Pre-Application | Pre-Application for Rezoning request: 402 & 430 W MEDINA ROAD. |