Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel Search

 
Parcel Attributes
Parcel13819032B
JurisdictionTucson
City of Tucson ZoningC-1
Water Course

Washes

Tucson WardWard 1
Tucson Registered NeighborhoodBarrio Nopal
Major Streets & Routes

Gateway Route

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Addresses

Annexations & Original City Zoning (OCZ)

Date - 11/14/2024 6:27 p.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-60-39 West To Silverbell Road And South To San Xavier Indian Reservation 2014 03/18/1960 2045

Rezoning Cases

Date - 11/14/2024 6:27 p.m.
Total Number Of Rezone Cases - (1)
Case No. Description New Zone Status Status Date Address
C9-79-76 HSL Linda Gardens Properties - Valencia Road R-42 Withdrawn 04/21/2011 W VALENCIA

Permits

Parcel Number - 13819032B
Date - 11/14/2024 6:27 p.m.
Total Number Of Permits - (67)
Permit Permit Status Entered Date Expired Date Unit Type Description
TS-PRM-0224-00077 Issued 02/20/2024 11/10/2024 Sign - Permanent Replace/refurbish existing monument sign using exiting pole/foundation.
T21OT00725 Issued 10/01/2021 04/05/2022 Floodplain Use Modify/upgrade equipment to existing wireless facility/pole. No height added, no ground disturbance
TR-ROW-1223-01487 Void 12/29/2023 N/A Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 1 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 1 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 2 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 2 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 3 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 3 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 3 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 4 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 4 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 4 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 5 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 6 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 7 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 10 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 11 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 12 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 13 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 14 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 15 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 16 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 17 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 18 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 19 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 19A Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 19B Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 19C Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 2101 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 2104 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 3 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 3101 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 3102 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 4 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 5 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 6 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 7 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 8 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT 9 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT M1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A UNIT M2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
T06OT02737 Final 10/23/2006 04/30/2007 SIGN 12035
T06OT02898 Final 11/08/2006 05/16/2009 SIGN 12128
T07BU02603 Final 12/17/2007 05/17/2009 BUILD FIRE ALARM SYSTEM
T08AN00592 Issued 06/11/2008 N/A ADDRNEW
T08BU00517 Final 03/17/2008 05/12/2009 SPKLR Add 11, relocate 12 fire sprinklers
T08CM02038 C of o 06/11/2008 06/29/2010 COMBO TI and CofO: CHURCH
T08OT02471 Issued 10/15/2008 N/A FLOODPLN FLOODPLAIN USE PERMIT:TI
T08OT02495 C of o 10/20/2008 05/19/2009 C-OF-O C OF O:CHURCH
T09OT02841 Final 12/31/2009 07/03/2010 SIGN 17725
T11OT01591 Final 08/11/2011 06/26/2012 SIGN BANNERS:90 DAYS START 8-12-2011 THRU 11-10-2011
T11OT02182 Expired 11/22/2011 08/21/2012 SIGN BANNER; 90 DAY; 11/22/11 - 02/20/12
T12OT00333 Expired 02/28/2012 11/26/2012 SIGN 2 BANNERS; 90 DAY; 02/28/12 - 05/28/12
T12OT01113 Expired 07/27/2012 04/28/2013 SIGN BANNER; 90 DAY; 07/27/12 - 10/25/12
T13OT00048 Expired 01/10/2013 10/09/2013 SIGN BANNER - 90 DAYS 1/10/13 THRU 4/10/13
T13OT01154 Final 09/30/2013 03/29/2014 SIGN C OF C 9/30/13
T18CM06810 L of c 08/29/2018 07/05/2020 COMBO ECO SITE - CELL TOWER
T21CM06803 Final 08/20/2021 08/30/2022 COMBO Modification/upgrade to existing communication tower equipment
T98BU02418 Final 10/01/1998 03/31/1999 SPKLR FIRE SPKR:RELOC 3
T98CM03367 Closed 08/06/1998 04/12/1999 COMBO TI:BOX OFFICE
T99EL01525 Closed 07/02/1999 03/12/2000 ELECT SIGNS:CIRCUIT:9907015
T99EL02330 Closed 09/10/1999 05/17/2000 ELECT SIGN:CIRCUIT:9909052

Code Enforcement

Parcel Number - 13819032B
Date - 11/14/2024 6:27 p.m.
Total Number Of Code Cases - 6
Case Number Case Status Entered Date Closed Date Unit Type Description
T04FR00264 Field 08/03/2004 N/A FIREINSP inspection
T04FR00265 Void 08/03/2004 N/A FIREINSP inspection
T04FR00266 Precite 08/03/2004 N/A FIREINSP inspection
T08DV06356 Complian 07/25/2008 N/A DNR_VIOL THERE IS A PIT FALL 12' LONG AND 6-8 WIDE THAT CONTAINS PEICES OF IRON METAL WHICH HAS SPIKES LOCATED BEHIND BUILDING. ALSO AN ACCUM OF REFUSE TO INCLUDE FURNITURE, TRASH AND DEBRIS, ILLEGAL DUMPING. VERY DANGEROUS FOR NEIGHBORHOOD KIDS WHO HAVE BEEN MESSING WITH THE JUNK.
T08DV11034 Courtcmp 12/01/2008 N/A DNR_VIOL ILLEGAL SIGN-
T08FR02887 Complete 09/18/2008 N/A FIREINSP sprinkler test needed

Plans

Parcel Number - 13819032B
Date - 11/14/2024 6:27 p.m.
Total Number Of Plans - 5
Plan Number Plan Status Application Date Expired Date Unit Type Description
T18SE00015 Approved 02/20/2018 N/A Map/Use Changes - Entitlements SE-18-15 T-Mobile -Valencia Rd - 70-foot tall wireless communication facility (WCF) disguised as broadleaf tree with associated ground equipment. - 70' WCF disaguised as broadleaf tree
TP-PRE-0324-00062 Complete 03/12/2024 N/A Pre-Application Preliminary DP/site plan submission for zoning/zoom review of the proposed new building on this religious site which will require a future, new address. Joseph Maher jr Architect
T08FR02237 Complete 08/01/2008 N/A APPEALS petition of appeal to the fire chief on 09/21/04.
T17PRE0093 Closed 11/01/2017 N/A NEIGHBORHOOD NOTIFICATION
T17PRE0096 Closed 11/13/2017 N/A NEIGHBORHOOD NOTIFICATION