Annexations & Original City Zoning (OCZ)
Date - 08/19/2026 3:50 a.m.
Total Number Of OZC Plans - (1)
Permits
Parcel Number - 138180240
Date - 08/19/2026 3:50 a.m.
Total Number Of Permits - (42)
| Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TR-UTL-0226-00388 | Complete | 02/25/2026 | 07/14/2026 | Right-of-Way (ROW) - Utility | *90 DAYS* ARIZONA PIPELINE CO WILL NEED TO EXCAVATE (1) 5X5 BELL HOLE IN ASPHALT BIKE LANE IN ORDER TO REPLACE GAS SERVICE FOR 7148 S 6TH AV (6th Av Under Pavement Moratorium Condition as of 2/12/2026) | |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. | |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 1 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 1 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 2 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 2 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 3 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 3 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 3 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 4 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 4 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | BLDG 4 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 101 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 102 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 103 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 104 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 1101 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 1102 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 1103 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 1104 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 1105 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 2102 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 2103 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 2105 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 3 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 3103 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 3104 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 3105 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 4 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 5 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 6 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 7 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 8 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT M1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT M2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| T15CM05952 | Final | 08/26/2015 | 07/13/2016 | COMBO | SOLAR INSTALLATION AND RELATED MATERIALS | |
| T15CM07957 | Expired | 11/16/2015 | 06/28/2016 | COMBO | SERVICE PANEL UPGRADE | |
| T15OT01218 | Final | 09/11/2015 | N/A | FLOODPLN | FUP- PV |