Parcel Search: 138160170
Parcel Search
Parcel Attributes
| Parcel | 138160170 |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | C-2 |
| Airport Environs Zone | Tucson International AEZ Paddle |
| Tucson Ward | Ward 1 |
| Tucson Registered Neighborhood | Barrio Nopal |
| Major Street & Route | Arterial or Collector |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Addresses | |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Date - 04/09/2026 10:50 a.m.
Total Number Of OZC Plans - (1)
Special Development Requests & Requirements
Date - 04/09/2026 10:50 a.m.
Total Number Of Special Development Permits - (1)
| Activity Number | Status | Apply Date | Expired Date | Type | Description |
|---|---|---|---|---|---|
| H000013470 | Closed | N/A |
Permits
Parcel Number - 138160170
Date - 04/09/2026 10:50 a.m.
Total Number Of Permits - (78)
| Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TC-RES-0124-00442 | Issued | 01/25/2024 | 08/20/2024 | UNIT 14 | Residential Building - One or Two Family | Upgrade old electrical pedestal to new 100 amp mobile home pedestal |
| T18MH00021 | Submitted | 01/31/2018 | N/A | 14 | Residential Building - One or Two Family | MOBILE HOME PLACEMENT |
| TC-RES-0323-03377 | Issued | 03/07/2023 | 11/13/2023 | UNIT 12 | Residential Building - One or Two Family | Upgrade main electric panel box |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. | |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 1 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 1 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 2 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 2 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 3 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 3 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 3 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 4 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 4 UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 4 UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 5 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 6 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | BLDG 7 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 10 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 11 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 12 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 13 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 14 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 15 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 16 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 17 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 18 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 19 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 19A | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 19B | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 19C | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 2101 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 2104 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 3 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 3101 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 3102 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 4 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 5 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 6 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 7 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 8 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 9 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT M1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT M2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| T00EL00913 | Expired | 04/11/2000 | 10/09/2000 | #05 | ELECT | RECONNECT:ELECTRIC:MH |
| T00EL02525 | Final | 10/26/2000 | N/A | #05 | ELECT | RECONNECT:ELECTRIC |
| T00MH00441 | Expired | 08/22/2000 | 05/26/2001 | #15 | MH | MOBILE HOME:SET UP |
| T00PL02358 | Expired | 12/04/2000 | 07/08/2001 | #13 | PLUMB | RECONNECT:GAS |
| T01MH00510 | Expired | 09/24/2001 | 03/25/2002 | #09 | MH | MOBILE HOME:SETUP |
| T01PL00997 | Final | 05/14/2001 | 11/18/2001 | #13 | PLUMB | GASLINE: 1 HOUR INSPECTION |
| T02CM01479 | Final | 03/19/2002 | 09/25/2002 | #05 | COMBO | RECONNECT:UTILITIES FOR MOBILE HOME |
| T03BU02506 | Withdrwn | 10/01/2003 | 03/29/2004 | #19 | DEMO | DEMO:HOUSE |
| T04EL00768 | Final | 04/19/2004 | 10/18/2004 | #11 | ELECT | RECONNECT:ELECTRIC:MH |
| T05MH00031 | Withdrwn | 03/15/2005 | N/A | #09 | MH | MOBILE HOME:SET UP |
| T07PL01400 | Final | 08/06/2007 | 02/05/2008 | #10 | PLUMB | RECONNECT:GAS LINE MH |
| T08EL00240 | Final | 02/11/2008 | 12/01/2008 | #16 | ELECT | RECONNECT:ELECTRIC:MH |
| T10BU00278 | Withdrwn | 02/12/2010 | N/A | #19 | DEMO | DEMOLITION:SFR |
| T10EL00141 | Final | 01/22/2010 | 07/27/2010 | #13 | ELECT | ELEC RECONNECT |
| T10MH00005 | Final | 01/19/2010 | 07/19/2010 | #13 | MH | MOBILE HOME:COMPLIANCE |
| T10PL00116 | Withdrwn | 01/22/2010 | 07/21/2010 | PLUMB | ELEC RECONNECT | |
| T10PL00186 | Final | 02/04/2010 | 08/17/2010 | #13 | PLUMB | RECONNECT:GAS LINE:MH |
| T13MH00007 | Final | 01/28/2013 | 07/27/2013 | #19C | MH | COMPLIANCE: MOBILE HOME SET UP |
| T14CM04111 | Final | 07/01/2014 | 01/26/2015 | #12 | COMBO | RECONNECT ELECTRIC; MH |
| T14CM04115 | Final | 07/01/2014 | 01/06/2015 | #15 | COMBO | ELEC RECONNECT |
| T15CM08471 | Expired | 12/02/2015 | 05/30/2016 | #12 | COMBO | ELECTRIC RECONNECT (APA) |
| T18BU00218 | Withdrwn | 04/17/2018 | N/A | #19 | DEMO | DEMO |
| T18CM01754 | Final | 03/06/2018 | 09/04/2018 | #14 | COMBO | ELECTRIC RECONNECT |
| T20CM05169 | Final | 08/09/2020 | 05/05/2021 | #13 | COMBO | ELECTRICAL RECONNECT |
| T97MH00087 | Final | 04/15/1997 | 10/20/1997 | #19C | MH | MOBILE HOME:IN MH PARK |
| T97MH00364 | Expired | 10/17/1997 | 04/18/1998 | #04 | MH | MOBILE HOME:SETUP |
| T98MH00106 | Expired | 02/26/1998 | 09/08/1998 | #12 | MH | MOBILE HOME:SETUP |
| T98MH00437 | Expired | 08/17/1998 | 05/31/1999 | #16 | MH | MOBIL HOME:SETUP |
| T98MH00686 | Final | 12/29/1998 | 06/29/1999 | #11 | MH | MOBILE HOME:SETUP |
| T98PL00701 | Final | 04/01/1998 | 10/11/1998 | #05 | PLUMB | RECONNECT:GAS |
| T99MH00570 | Expired | 10/21/1999 | 11/19/2000 | #13 | MH | MOBILE HOME:SETUP |
Code Enforcement
Parcel Number - 138160170
Date - 04/09/2026 10:50 a.m.
Total Number Of Code Cases - 5
| Case Number | Case Status | Entered Date | Closed Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| CE-VIO0223-01960 | Closed - resolved | 02/16/2023 | 02/17/2023 | Code Enforcement Case | EMERGENCY CALL OUT FROM TPD AND TEP. NO UTILITIES TO MOBILE HOME NUMBER 12. | |
| T03VL00850 | Closed | 10/08/2003 | N/A | CODEVIOL | COMPLAINT: RESIDENTIAL FIRE | |
| T10DV00409 | Complian | 01/28/2010 | N/A | DNR_VIOL | UNIT #13/NO ELECTRCITY SERVICE/USING EXTENSION CHORDS IN A HAZARDOUS MANNER | |
| T13DV07480 | Complete | 10/07/2013 | N/A | DNR_VIOL | Feces in the back yard. Furnace and stove leak gas. Door does not close correctly. | |
| T99VL01445 | Complian | 05/24/1999 | N/A | CODEVIOL | COMPLAINT:EMERGENCY CALL-OUT FOR FIRE |