Permit: TR-UTL-0826-01351
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
6832 S NOGALES HY
Address NEW:
6832 S NOGALES HY
Apply Date:
08/14/2026
Applicant:
Adrien Pineda
Description:
ARIZONA PIPELINE CO WILL NEED TO EXCAVTAE (1) 5X5 BELL IN BIKE LANE ALONG WITH (1) 5X5 BELL HOLE IN DIRT ROW IN ORDER TO ABANDON GAS SERVICE FOR 6832 S NOGALES HWY - APC WILL BE WORK 2DAYS OUT OF THE 90 DAY PERMIT
Permit Reviews
Permit Number - TR-UTL-0826-01351
Permit Status: Inspections
Permit Description: ARIZONA PIPELINE CO WILL NEED TO EXCAVTAE (1) 5X5 BELL IN BIKE LANE ALONG WITH (1) 5X5 BELL HOLE IN DIRT ROW IN ORDER TO ABANDON GAS SERVICE FOR 6832 S NOGALES HWY - APC WILL BE WORK 2DAYS OUT OF THE 90 DAY PERMIT
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/20/2026 | RIGHT-OF-WAY REVIEW v.3 | 08/24/2026 | APPROVED |
| 08/18/2026 | RIGHT-OF-WAY REVIEW v.2 | N/A | REQUIRES RESUBMIT |
| 08/16/2026 | RIGHT-OF-WAY REVIEW v.1 | 08/18/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0826-01351
Permit Status: Inspections
Permit Description: ARIZONA PIPELINE CO WILL NEED TO EXCAVTAE (1) 5X5 BELL IN BIKE LANE ALONG WITH (1) 5X5 BELL HOLE IN DIRT ROW IN ORDER TO ABANDON GAS SERVICE FOR 6832 S NOGALES HWY - APC WILL BE WORK 2DAYS OUT OF THE 90 DAY PERMIT
Total Outstanding Activity Conditions - 7
| Date | Name |
|---|---|
| 08/18/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 08/18/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 08/18/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 08/18/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 08/24/2026 | Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign. |
| 08/24/2026 | Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk - The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety |
| 08/24/2026 | Monsoon Season started June 15th, 2026, to September 30th, 2026 - Debris and Physical blockages prohibiting Water Flow to be removed. All trenches will be required to be filled at the end of each working day and may not be opened if prediction of rain is above 0% within 3 days of work prior to post. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0826-01351
Permite Description: ARIZONA PIPELINE CO WILL NEED TO EXCAVTAE (1) 5X5 BELL IN BIKE LANE ALONG WITH (1) 5X5 BELL HOLE IN DIRT ROW IN ORDER TO ABANDON GAS SERVICE FOR 6832 S NOGALES HWY - APC WILL BE WORK 2DAYS OUT OF THE 90 DAY PERMIT
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| TRSP - ROW - Barricade - Setup/Routine | N/A | Scheduled | ||
| TRSP - ROW - Backfill - Placement/Compaction | N/A | Requested | ||
| TRSP - ROW - Final | N/A | Requested |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0826-01351
Permit Description: ARIZONA PIPELINE CO WILL NEED TO EXCAVTAE (1) 5X5 BELL IN BIKE LANE ALONG WITH (1) 5X5 BELL HOLE IN DIRT ROW IN ORDER TO ABANDON GAS SERVICE FOR 6832 S NOGALES HWY - APC WILL BE WORK 2DAYS OUT OF THE 90 DAY PERMIT
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/27/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | phone call with Adrian, one day job is scheduled to mobilize next Tuesday |
Scheduled Inspections
Scheduled Inspections - TR-UTL-0826-01351
Status: Inspections
Description: ARIZONA PIPELINE CO WILL NEED TO EXCAVTAE (1) 5X5 BELL IN BIKE LANE ALONG WITH (1) 5X5 BELL HOLE IN DIRT ROW IN ORDER TO ABANDON GAS SERVICE FOR 6832 S NOGALES HWY - APC WILL BE WORK 2DAYS OUT OF THE 90 DAY PERMIT
| Scheduled Date | Description | Entered By | Entered Date |
|---|---|---|---|
| 10/20/2026 | TRSP - ROW - Barricade - Setup/Routine | Scheduled |