Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Parcel Search: 13809002E
Parcel Search
Permits
Parcel Number - 13809002E
Date - 11/23/2024 6:41 p.m.
Total Number Of Permits - (19)
Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TC-COM-0124-00034 | Void | 01/08/2024 | N/A | Commercial Building | *VOID: YL- This is a duplicate permit to Commercial Trade Permits TC-COM-0124-00045 & TC-COM-0124-00046. This permit will be voided as all permit information/progress has been moved to permits TC-COM-0124-00045 & TC-COM-0124-00046 * -The bus bar is bad in the existing meter pack Replace (2) meter pack like for like This inspection must be done after hours. We would like like to get this inspected today (1/8/2024) is possible | |
TC-COM-0124-00045 | Complete | 01/09/2024 | 09/14/2024 | Commercial Building | 5951 S 12TH AV , CS2 TUCSON, AZ, 85706 This is for CS2 Temp Service The bus bar is bad in the existing meter pack Replace (1) meter pack like for like This inspection must be done after hours. We would like like to get this inspected today (1/9/2024) is possible | |
TC-COM-0124-00046 | Complete | 01/09/2024 | 07/10/2024 | Commercial Building | 5951 S 12TH AV , CS3 CS3 Temp Power TUCSON, AZ, 85706 The bus bar is bad in the existing meter pack Replace (1) meter pack like for like This inspection must be done after hours. We would like like to get this inspected today (1/9/2024) is possible | |
TC-COM-0324-00549 | Issued | 03/27/2024 | 03/02/2025 | Commercial Building | Classroom building 3 of previously approved phase 1 of PRCA south campus. | |
TC-COM-0523-01267 | Issued | 05/12/2023 | 02/25/2025 | Commercial Building | Modification to add restrooms to 2 existing state approved modular classrooms under Phase 1 TD-DEV-0223-00144 which is in final review. This is like a TI. | |
TC-COM-0623-01425 | Issued | 06/02/2023 | 04/13/2024 | Commercial Building | Temporary electrical connection for construction trailer. | |
TC-COM-0623-01426 | Issued | 06/02/2023 | 04/08/2024 | Commercial Building | Temporary electrical connection CS-3 for construction modular unit. | |
TR-UTL-0624-01136 | Complete | 06/12/2024 | 09/23/2024 | Right-of-Way (ROW) - Utility | PRJ373038-1 From TEP Pole near 5951 S 12th ave, head N and begin 295' aerial overlash. Tie in. | |
TR-UTL-0623-01788 | Complete | 06/15/2023 | 07/21/2023 | Right-of-Way (ROW) - Utility | Installing 8" Fire Hydrant and 2" water service with meter | |
TC-CFO-0824-00165 | Denied | 08/06/2024 | N/A | Certificate of Occupancy | This project needs an approved Water Sterilization Report to issue a Temporary Certificate of Occupancy. Please re-request TCO once the chlorination report has been submitted and approved. Modification to add restrooms to 2 existing state approved modular classrooms under Phase 1 TD-DEV-0223-00144 which is in final review. This is like a TI. | |
TC-CFO-0824-00184 | Issued | 08/29/2024 | 10/09/2024 | Certificate of Occupancy | Modification to add restrooms to 2 existing state approved modular classrooms under Phase 1 TD-DEV-0223-00144 which is in final review. This is like a TI. | |
TF-FCP-0824-00723 | Issued | 08/29/2024 | N/A | Fire Construction Permit | Adding fire alarm devices to new modular classroom building on an existing fire alarm system. | |
TC-CFO-0924-00188 | Issued | 09/09/2024 | 10/10/2024 | Certificate of Occupancy | Classroom building 3 of previously approved phase 1 of PRCA south campus. | |
TC-UTL-0924-00084 | Issued | 09/23/2024 | 04/26/2025 | Utilities Permit | Removing all existing antennas and RRUs, Mount swap, install (12) antennas, (12) RRUs, (1) DC9, (1) Fiber, (2) Power trunks, New FLX42 cabinet | |
TR-UTL-0923-02585 | Complete | 09/27/2023 | 12/01/2023 | Right-of-Way (ROW) - Utility | EXCAVATE (1) 5'X5' BELL HOLE IN DIRT ROW AND (1) 38'X4''TRENCH IN ASPHALT STREET (W CALLE ALVORD) FOR GAS SERVICE AND MAIN REPLACEMENT. | |
TR-ROW-1023-01216 | Issued | 10/03/2023 | 05/08/2024 | Right-of-Way (ROW) | Add concrete sidewalks in ROW per TD-DEV-0223-00144 | |
TR-ROW-1123-01315 | Issued | 11/01/2023 | 01/19/2024 | Right-of-Way (ROW) | This is a request to locate in the right of way a proposed sign previously approved by Heather Thrall under permit TS-PRM-0223-00170. Identical application package is also sent under Temporary Revocable Easement TR-RES-1123-00005 | |
TF-FCP-1123-01280 | Complete | 11/04/2023 | 05/14/2024 | Fire Construction Permit | DOUBLE EXPEDITE-Titan Alarm will install devices; heats, strobes, pull stations according to the approved plans submitted to the AHJ | |
TC-CFO-1123-00214 | Denied | 11/09/2023 | N/A | Certificate of Occupancy | This project needs an approved water chlorination report to issue a Temporary Certificate of Occupancy. Please re-request once the chlorination report has been submitted and approved. Modification to add restrooms to 2 existing state approved modular classrooms under Phase 1 TD-DEV-0223-00144 which is in final review. This is like a TI. |