Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Parcel Search
 
Parcel Attributes
Parcel138041810
JurisdictionTucson, Pima County
City of Tucson ZoningC-1
Tucson WardWard 1
Tucson Registered NeighborhoodElvira
Major Street & Route

Gateway Route
-
Intersection Buffer

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Addresses
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Date - 05/21/2026 3:53 a.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-60-39 West To Silverbell Road And South To San Xavier Indian Reservation 2014 03/18/1960 2045

Special Development Requests & Requirements

Date - 05/21/2026 3:53 a.m.
Total Number Of Special Development Permits - (1)
Activity Number Status Apply Date Expired Date Type Description
H000001214 Closed N/A

Permits

Parcel Number - 138041810
Date - 05/21/2026 3:53 a.m.
Total Number Of Permits - (62)
Permit Permit Status Entered Date Expired Date Unit Type Description
TR-ROW-0125-00111 Inspections 01/23/2025 03/08/2025 Right-of-Way (ROW) notice of violation for sidewalk repair/installtion
TF-FCP-0223-00371 Complete 02/06/2023 N/A Fire Construction Permit Tank Install.
TF-FCP-0223-00372 Complete 02/06/2023 N/A Fire Construction Permit This permit is for Tank Removal
TC-COM-0223-00632 Issued 02/13/2023 12/05/2023 Commercial Building Electrical Tank/Piping Replacement
TD-DEV-0324-00093 Fees due 03/20/2024 N/A Development Package Removal of any existing wheel stops and installation of parking bollards to ensure building & customer safety. No additional site or building work to be done.
TC-COM-0523-01306 Void 05/17/2023 11/13/2023 Commercial Building VOIDED USE PERMIT TC-COM-0223-00632 Update to fuel system electrical.
TS-PRM-0623-00359 Complete 06/16/2023 06/09/2024 Sign - Permanent Install a 4.5 square foot double-sided Diesel Fuel Digital Price Sign to replace blank panels on two (2) existing Speedway Gas Station digital price monument signs, one (1) located on Valencia Road and one (1) located on 12th Avenue.
TR-ROW-1223-01485 Void 12/29/2023 N/A Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 1 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 1 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 2 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 2 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 3 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 3 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 3 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 4 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 4 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 4 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 101 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 102 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 103 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 104 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 1101 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 1102 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 1103 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 1104 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 1105 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 2102 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 2103 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 2105 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 3 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 3103 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 3104 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 3105 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 4 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 5 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 6 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 7 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT 8 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT M1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A UNIT M2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
T00ME00298 Final 03/27/2000 09/04/2000 MECH PRESSURE VESSEL CERTIFICATE:TUC-24348
T02EL02123 Final 10/28/2002 04/27/2003 ELECT REPLACE:DAMAGED GAS DISPENSER
T05OT01041 Final 04/26/2005 03/06/2006 SIGN SIGN: 8907 GIANT CONOCO
T06BU02307 Withdrwn 09/20/2006 04/10/2007 TANKS REPL FUEL DISPENSERS AND RELOCATE EMERGENCY STOP SWITCH
T06CM05512 Final 10/18/2006 05/16/2007 COMBO REPLACE:FUEL DISPENSERS:RELOCATE EMERGENCY STOP SWITHCH
T08CM01582 Final 05/16/2008 04/05/2009 COMBO REMODEL: CANOPY AND LIGHTING
T08OT01238 Final 05/22/2008 03/31/2009 SIGN 15033
T09OT01814 Final 08/28/2009 04/04/2010 SIGN 17111
T17FO01067 Final 12/08/2017 07/05/2020 FIREOPER FLAM/COMB - GIANT 6926
T19CM02500 Expired 04/10/2019 10/07/2019 COMBO REPLACE UNDERGROUND STORAGE TANK AND FUEL DISPENSER
T19FC00257 Final 04/09/2019 07/05/2020 FIRECONS R&R fuel tanks, tank equipment including sumps, piping including sums, and install new fuel dispensers, tank monitor system, fuel related wiring & conduit. No building replacement or work on building.
T19FC00451 Final 06/12/2019 07/05/2020 FIRECONS Replacement of spill buckets, STP motors and drop tube overfill valves on 4ysts. Isolate vent piping from both unleaded tanks.
T19FO00394 Final 05/30/2019 N/A FIREOPER Four (4) gallon USTS with man-ways
T19OT00575 Final 06/21/2019 03/17/2020 SIGN 5 signs rebranding
T19RW04150 Final 07/26/2019 11/25/2019 ROW ACCESS TO MH #4419 TO SPLICE FIBER.
T19RW05967 Final 10/10/2019 12/09/2019 ROW JOB WIILL REQUIRE ACCESS TO MH#4419 TO SPLICE FIBER A NOTICE OF TEMPORARY HOLIDAY RESTRICTION APPLIES TO THIS PERMIT AND WILL BE IN EFFECT FROM THANKSGIVING DAY TO JANUARY 2. DUE TO THE INCREASING TRAFFIC VOLUME ON MANY OF THE CITY'S ROADS, IT IS NECESSARY TO RESTRICT LANE CLOSURES ON CERTAIN ROADS DURING THE HOLIDAY SEASON.
T98BU01958 Expired 08/12/1998 02/08/1999 BUILD REPLACE EXISTING CANOPY FASCIA

Code Enforcement

Parcel Number - 138041810
Date - 05/21/2026 3:53 a.m.
Total Number Of Code Cases - 5
Case Number Case Status Entered Date Closed Date Unit Type Description
CE-VIO1223-07019 Closed - resolved 12/28/2023 07/10/2025 Code Enforcement Case SWLK / Referred from TDOT / Failure to respond to Damaged Sidewalk NOV address still in violation
T02VL02173 Closed 10/22/2002 N/A CODEVIOL EMERGENCY: FIRE
T06FR02555 Complete 09/11/2006 N/A FIREINSP Motor Fuel Dispensing Inspection
T06FR02724 Complete 11/07/2006 N/A FIREINSP UST
T08FR02029 Complete 07/17/2008 N/A FIREINSP UST