Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Parcel Search
 
Parcel Attributes
Parcel137073210
JurisdictionTucson, Pima County
City of Tucson ZoningR-2, O-3
Tucson WardWard 5
Tucson Registered NeighborhoodSunnyside
Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Parcel Attributes Issue?

Permits

Parcel Number - 137073210
Date - 06/10/2026 1:10 p.m.
Total Number Of Permits - (61)
Permit Permit Status Entered Date Expired Date Unit Type Description
T09BU00091 In revision 01/21/2009 01/24/2012 Development Package GRADING: 3820 CY CUT 814CY FILL
TF-FCP-0326-00193 In revision 03/20/2026 11/20/2026 Fire Construction Permit PROVIDE NEW FIRE ALARM SYSTEM FOR "CASA DEL PUEBLO SENIOR COMMUNITY". FIRE CONTROL PANEL AND ALL INITIATIATING AND NOTIFICATION DEVICES WILL BE NEW. NEW 18AH BATTERIES TO BE INSTALLED IN BOTTOM OF FACP CABINET.
TZ-CMP-0525-00094 Complete 05/22/2025 N/A Zoning Compliance Please note that 4975 S Liberty Ave and 4945 S Liberty Ave are 2 addresses comprising Casa del Pueblo Senior Apartments. This multifamily project was built out in two phases, phase 1 in 1997 and phase 2 in 2011, and each phase has its own address (Phase 1 = 4975 S Liberty Ave.; Phase 2 = 4945 S Liberty Ave.). The first phase has 58 units and the second has 38. Thus, for Casa del Pueblo Senior Apartments we are submitting two zoning compliance letter requests, one for each address of the project. If there is any other information you need before processing this request, please reach out and I’m more than happy to help.
TC-CFO-0626-00096 Denied 06/01/2026 N/A Certificate of Occupancy This project needs the okay for a Temporary Certificate of Occupancy (TCO) from a Fire and Engineering Inspector and the TCO level for the building. Please schedule Fire Final and Engineering Final. Water Sterilization Report is also required for a Level 2 or higher. Please sign-in to your TDC Online account and submit approved water report and schedule Fire and Engineering Finals. Once okay is given for TCO and report is submitted and satisfied please re-request TCO. If you have any questions, please contact PDSD-Permits@tucsonaz.gov TCO Level 4, 30 Days, Ongoing Unit Turns are outstanding for full close out. Units that have had TCO Inspections: A213 A209 A211 A212 A210 A208 A207 A205 A206 A204 A203 A201 A202 B201 B202 B204 B203 B205 B206 B208 B207 B209 B210 B212 B211 B213 B214 B216 B215 B115 B116 B114 B113 B111 B112 B110 B109 B107 B108 B106 B105 B103 B104 A102 A101 A103 A104 A106 A105 A107 A110 A109 A111 A112 A113 C105 C111 C119 B101 B102 C114 C115
TC-CFO-0626-00096 Denied 06/01/2026 N/A UNIT 101 Certificate of Occupancy This project needs the okay for a Temporary Certificate of Occupancy (TCO) from a Fire and Engineering Inspector and the TCO level for the building. Please schedule Fire Final and Engineering Final. Water Sterilization Report is also required for a Level 2 or higher. Please sign-in to your TDC Online account and submit approved water report and schedule Fire and Engineering Finals. Once okay is given for TCO and report is submitted and satisfied please re-request TCO. If you have any questions, please contact PDSD-Permits@tucsonaz.gov TCO Level 4, 30 Days, Ongoing Unit Turns are outstanding for full close out. Units that have had TCO Inspections: A213 A209 A211 A212 A210 A208 A207 A205 A206 A204 A203 A201 A202 B201 B202 B204 B203 B205 B206 B208 B207 B209 B210 B212 B211 B213 B214 B216 B215 B115 B116 B114 B113 B111 B112 B110 B109 B107 B108 B106 B105 B103 B104 A102 A101 A103 A104 A106 A105 A107 A110 A109 A111 A112 A113 C105 C111 C119 B101 B102 C114 C115
TC-CFO-0626-00096 Denied 06/01/2026 N/A UNIT 102 Certificate of Occupancy This project needs the okay for a Temporary Certificate of Occupancy (TCO) from a Fire and Engineering Inspector and the TCO level for the building. Please schedule Fire Final and Engineering Final. Water Sterilization Report is also required for a Level 2 or higher. Please sign-in to your TDC Online account and submit approved water report and schedule Fire and Engineering Finals. Once okay is given for TCO and report is submitted and satisfied please re-request TCO. If you have any questions, please contact PDSD-Permits@tucsonaz.gov TCO Level 4, 30 Days, Ongoing Unit Turns are outstanding for full close out. Units that have had TCO Inspections: A213 A209 A211 A212 A210 A208 A207 A205 A206 A204 A203 A201 A202 B201 B202 B204 B203 B205 B206 B208 B207 B209 B210 B212 B211 B213 B214 B216 B215 B115 B116 B114 B113 B111 B112 B110 B109 B107 B108 B106 B105 B103 B104 A102 A101 A103 A104 A106 A105 A107 A110 A109 A111 A112 A113 C105 C111 C119 B101 B102 C114 C115
TC-CFO-0626-00096 Denied 06/01/2026 N/A UNIT 105 Certificate of Occupancy This project needs the okay for a Temporary Certificate of Occupancy (TCO) from a Fire and Engineering Inspector and the TCO level for the building. Please schedule Fire Final and Engineering Final. Water Sterilization Report is also required for a Level 2 or higher. Please sign-in to your TDC Online account and submit approved water report and schedule Fire and Engineering Finals. Once okay is given for TCO and report is submitted and satisfied please re-request TCO. If you have any questions, please contact PDSD-Permits@tucsonaz.gov TCO Level 4, 30 Days, Ongoing Unit Turns are outstanding for full close out. Units that have had TCO Inspections: A213 A209 A211 A212 A210 A208 A207 A205 A206 A204 A203 A201 A202 B201 B202 B204 B203 B205 B206 B208 B207 B209 B210 B212 B211 B213 B214 B216 B215 B115 B116 B114 B113 B111 B112 B110 B109 B107 B108 B106 B105 B103 B104 A102 A101 A103 A104 A106 A105 A107 A110 A109 A111 A112 A113 C105 C111 C119 B101 B102 C114 C115
TC-CFO-0626-00096 Denied 06/01/2026 N/A UNIT 106 Certificate of Occupancy This project needs the okay for a Temporary Certificate of Occupancy (TCO) from a Fire and Engineering Inspector and the TCO level for the building. Please schedule Fire Final and Engineering Final. Water Sterilization Report is also required for a Level 2 or higher. Please sign-in to your TDC Online account and submit approved water report and schedule Fire and Engineering Finals. Once okay is given for TCO and report is submitted and satisfied please re-request TCO. If you have any questions, please contact PDSD-Permits@tucsonaz.gov TCO Level 4, 30 Days, Ongoing Unit Turns are outstanding for full close out. Units that have had TCO Inspections: A213 A209 A211 A212 A210 A208 A207 A205 A206 A204 A203 A201 A202 B201 B202 B204 B203 B205 B206 B208 B207 B209 B210 B212 B211 B213 B214 B216 B215 B115 B116 B114 B113 B111 B112 B110 B109 B107 B108 B106 B105 B103 B104 A102 A101 A103 A104 A106 A105 A107 A110 A109 A111 A112 A113 C105 C111 C119 B101 B102 C114 C115
TC-CFO-0626-00096 Denied 06/01/2026 N/A UNIT 107 Certificate of Occupancy This project needs the okay for a Temporary Certificate of Occupancy (TCO) from a Fire and Engineering Inspector and the TCO level for the building. Please schedule Fire Final and Engineering Final. Water Sterilization Report is also required for a Level 2 or higher. Please sign-in to your TDC Online account and submit approved water report and schedule Fire and Engineering Finals. Once okay is given for TCO and report is submitted and satisfied please re-request TCO. If you have any questions, please contact PDSD-Permits@tucsonaz.gov TCO Level 4, 30 Days, Ongoing Unit Turns are outstanding for full close out. Units that have had TCO Inspections: A213 A209 A211 A212 A210 A208 A207 A205 A206 A204 A203 A201 A202 B201 B202 B204 B203 B205 B206 B208 B207 B209 B210 B212 B211 B213 B214 B216 B215 B115 B116 B114 B113 B111 B112 B110 B109 B107 B108 B106 B105 B103 B104 A102 A101 A103 A104 A106 A105 A107 A110 A109 A111 A112 A113 C105 C111 C119 B101 B102 C114 C115
TC-CFO-0626-00096 Denied 06/01/2026 N/A UNIT 108 Certificate of Occupancy This project needs the okay for a Temporary Certificate of Occupancy (TCO) from a Fire and Engineering Inspector and the TCO level for the building. Please schedule Fire Final and Engineering Final. Water Sterilization Report is also required for a Level 2 or higher. Please sign-in to your TDC Online account and submit approved water report and schedule Fire and Engineering Finals. Once okay is given for TCO and report is submitted and satisfied please re-request TCO. If you have any questions, please contact PDSD-Permits@tucsonaz.gov TCO Level 4, 30 Days, Ongoing Unit Turns are outstanding for full close out. Units that have had TCO Inspections: A213 A209 A211 A212 A210 A208 A207 A205 A206 A204 A203 A201 A202 B201 B202 B204 B203 B205 B206 B208 B207 B209 B210 B212 B211 B213 B214 B216 B215 B115 B116 B114 B113 B111 B112 B110 B109 B107 B108 B106 B105 B103 B104 A102 A101 A103 A104 A106 A105 A107 A110 A109 A111 A112 A113 C105 C111 C119 B101 B102 C114 C115
TC-CFO-0626-00096 Denied 06/01/2026 N/A UNIT 109 Certificate of Occupancy This project needs the okay for a Temporary Certificate of Occupancy (TCO) from a Fire and Engineering Inspector and the TCO level for the building. Please schedule Fire Final and Engineering Final. Water Sterilization Report is also required for a Level 2 or higher. Please sign-in to your TDC Online account and submit approved water report and schedule Fire and Engineering Finals. Once okay is given for TCO and report is submitted and satisfied please re-request TCO. If you have any questions, please contact PDSD-Permits@tucsonaz.gov TCO Level 4, 30 Days, Ongoing Unit Turns are outstanding for full close out. Units that have had TCO Inspections: A213 A209 A211 A212 A210 A208 A207 A205 A206 A204 A203 A201 A202 B201 B202 B204 B203 B205 B206 B208 B207 B209 B210 B212 B211 B213 B214 B216 B215 B115 B116 B114 B113 B111 B112 B110 B109 B107 B108 B106 B105 B103 B104 A102 A101 A103 A104 A106 A105 A107 A110 A109 A111 A112 A113 C105 C111 C119 B101 B102 C114 C115
TC-CFO-0626-00096 Denied 06/01/2026 N/A UNIT 110 Certificate of Occupancy This project needs the okay for a Temporary Certificate of Occupancy (TCO) from a Fire and Engineering Inspector and the TCO level for the building. Please schedule Fire Final and Engineering Final. Water Sterilization Report is also required for a Level 2 or higher. Please sign-in to your TDC Online account and submit approved water report and schedule Fire and Engineering Finals. Once okay is given for TCO and report is submitted and satisfied please re-request TCO. If you have any questions, please contact PDSD-Permits@tucsonaz.gov TCO Level 4, 30 Days, Ongoing Unit Turns are outstanding for full close out. Units that have had TCO Inspections: A213 A209 A211 A212 A210 A208 A207 A205 A206 A204 A203 A201 A202 B201 B202 B204 B203 B205 B206 B208 B207 B209 B210 B212 B211 B213 B214 B216 B215 B115 B116 B114 B113 B111 B112 B110 B109 B107 B108 B106 B105 B103 B104 A102 A101 A103 A104 A106 A105 A107 A110 A109 A111 A112 A113 C105 C111 C119 B101 B102 C114 C115
TC-CFO-0626-00096 Denied 06/01/2026 N/A UNIT 111 Certificate of Occupancy This project needs the okay for a Temporary Certificate of Occupancy (TCO) from a Fire and Engineering Inspector and the TCO level for the building. Please schedule Fire Final and Engineering Final. Water Sterilization Report is also required for a Level 2 or higher. Please sign-in to your TDC Online account and submit approved water report and schedule Fire and Engineering Finals. Once okay is given for TCO and report is submitted and satisfied please re-request TCO. If you have any questions, please contact PDSD-Permits@tucsonaz.gov TCO Level 4, 30 Days, Ongoing Unit Turns are outstanding for full close out. Units that have had TCO Inspections: A213 A209 A211 A212 A210 A208 A207 A205 A206 A204 A203 A201 A202 B201 B202 B204 B203 B205 B206 B208 B207 B209 B210 B212 B211 B213 B214 B216 B215 B115 B116 B114 B113 B111 B112 B110 B109 B107 B108 B106 B105 B103 B104 A102 A101 A103 A104 A106 A105 A107 A110 A109 A111 A112 A113 C105 C111 C119 B101 B102 C114 C115
TC-CFO-0626-00096 Denied 06/01/2026 N/A UNIT 112 Certificate of Occupancy This project needs the okay for a Temporary Certificate of Occupancy (TCO) from a Fire and Engineering Inspector and the TCO level for the building. Please schedule Fire Final and Engineering Final. Water Sterilization Report is also required for a Level 2 or higher. Please sign-in to your TDC Online account and submit approved water report and schedule Fire and Engineering Finals. Once okay is given for TCO and report is submitted and satisfied please re-request TCO. If you have any questions, please contact PDSD-Permits@tucsonaz.gov TCO Level 4, 30 Days, Ongoing Unit Turns are outstanding for full close out. Units that have had TCO Inspections: A213 A209 A211 A212 A210 A208 A207 A205 A206 A204 A203 A201 A202 B201 B202 B204 B203 B205 B206 B208 B207 B209 B210 B212 B211 B213 B214 B216 B215 B115 B116 B114 B113 B111 B112 B110 B109 B107 B108 B106 B105 B103 B104 A102 A101 A103 A104 A106 A105 A107 A110 A109 A111 A112 A113 C105 C111 C119 B101 B102 C114 C115
TC-CFO-0626-00096 Denied 06/01/2026 N/A UNIT 113 Certificate of Occupancy This project needs the okay for a Temporary Certificate of Occupancy (TCO) from a Fire and Engineering Inspector and the TCO level for the building. Please schedule Fire Final and Engineering Final. Water Sterilization Report is also required for a Level 2 or higher. Please sign-in to your TDC Online account and submit approved water report and schedule Fire and Engineering Finals. Once okay is given for TCO and report is submitted and satisfied please re-request TCO. If you have any questions, please contact PDSD-Permits@tucsonaz.gov TCO Level 4, 30 Days, Ongoing Unit Turns are outstanding for full close out. Units that have had TCO Inspections: A213 A209 A211 A212 A210 A208 A207 A205 A206 A204 A203 A201 A202 B201 B202 B204 B203 B205 B206 B208 B207 B209 B210 B212 B211 B213 B214 B216 B215 B115 B116 B114 B113 B111 B112 B110 B109 B107 B108 B106 B105 B103 B104 A102 A101 A103 A104 A106 A105 A107 A110 A109 A111 A112 A113 C105 C111 C119 B101 B102 C114 C115
TC-CFO-0626-00096 Denied 06/01/2026 N/A UNIT 114 Certificate of Occupancy This project needs the okay for a Temporary Certificate of Occupancy (TCO) from a Fire and Engineering Inspector and the TCO level for the building. Please schedule Fire Final and Engineering Final. Water Sterilization Report is also required for a Level 2 or higher. Please sign-in to your TDC Online account and submit approved water report and schedule Fire and Engineering Finals. Once okay is given for TCO and report is submitted and satisfied please re-request TCO. If you have any questions, please contact PDSD-Permits@tucsonaz.gov TCO Level 4, 30 Days, Ongoing Unit Turns are outstanding for full close out. Units that have had TCO Inspections: A213 A209 A211 A212 A210 A208 A207 A205 A206 A204 A203 A201 A202 B201 B202 B204 B203 B205 B206 B208 B207 B209 B210 B212 B211 B213 B214 B216 B215 B115 B116 B114 B113 B111 B112 B110 B109 B107 B108 B106 B105 B103 B104 A102 A101 A103 A104 A106 A105 A107 A110 A109 A111 A112 A113 C105 C111 C119 B101 B102 C114 C115
TC-CFO-0626-00096 Denied 06/01/2026 N/A UNIT 115 Certificate of Occupancy This project needs the okay for a Temporary Certificate of Occupancy (TCO) from a Fire and Engineering Inspector and the TCO level for the building. Please schedule Fire Final and Engineering Final. Water Sterilization Report is also required for a Level 2 or higher. Please sign-in to your TDC Online account and submit approved water report and schedule Fire and Engineering Finals. Once okay is given for TCO and report is submitted and satisfied please re-request TCO. If you have any questions, please contact PDSD-Permits@tucsonaz.gov TCO Level 4, 30 Days, Ongoing Unit Turns are outstanding for full close out. Units that have had TCO Inspections: A213 A209 A211 A212 A210 A208 A207 A205 A206 A204 A203 A201 A202 B201 B202 B204 B203 B205 B206 B208 B207 B209 B210 B212 B211 B213 B214 B216 B215 B115 B116 B114 B113 B111 B112 B110 B109 B107 B108 B106 B105 B103 B104 A102 A101 A103 A104 A106 A105 A107 A110 A109 A111 A112 A113 C105 C111 C119 B101 B102 C114 C115
TC-CFO-0626-00096 Denied 06/01/2026 N/A UNIT 116 Certificate of Occupancy This project needs the okay for a Temporary Certificate of Occupancy (TCO) from a Fire and Engineering Inspector and the TCO level for the building. Please schedule Fire Final and Engineering Final. Water Sterilization Report is also required for a Level 2 or higher. Please sign-in to your TDC Online account and submit approved water report and schedule Fire and Engineering Finals. Once okay is given for TCO and report is submitted and satisfied please re-request TCO. If you have any questions, please contact PDSD-Permits@tucsonaz.gov TCO Level 4, 30 Days, Ongoing Unit Turns are outstanding for full close out. Units that have had TCO Inspections: A213 A209 A211 A212 A210 A208 A207 A205 A206 A204 A203 A201 A202 B201 B202 B204 B203 B205 B206 B208 B207 B209 B210 B212 B211 B213 B214 B216 B215 B115 B116 B114 B113 B111 B112 B110 B109 B107 B108 B106 B105 B103 B104 A102 A101 A103 A104 A106 A105 A107 A110 A109 A111 A112 A113 C105 C111 C119 B101 B102 C114 C115
TC-CFO-0626-00096 Denied 06/01/2026 N/A UNIT 117 Certificate of Occupancy This project needs the okay for a Temporary Certificate of Occupancy (TCO) from a Fire and Engineering Inspector and the TCO level for the building. Please schedule Fire Final and Engineering Final. Water Sterilization Report is also required for a Level 2 or higher. Please sign-in to your TDC Online account and submit approved water report and schedule Fire and Engineering Finals. Once okay is given for TCO and report is submitted and satisfied please re-request TCO. If you have any questions, please contact PDSD-Permits@tucsonaz.gov TCO Level 4, 30 Days, Ongoing Unit Turns are outstanding for full close out. Units that have had TCO Inspections: A213 A209 A211 A212 A210 A208 A207 A205 A206 A204 A203 A201 A202 B201 B202 B204 B203 B205 B206 B208 B207 B209 B210 B212 B211 B213 B214 B216 B215 B115 B116 B114 B113 B111 B112 B110 B109 B107 B108 B106 B105 B103 B104 A102 A101 A103 A104 A106 A105 A107 A110 A109 A111 A112 A113 C105 C111 C119 B101 B102 C114 C115
TC-CFO-0626-00096 Denied 06/01/2026 N/A UNIT 118 Certificate of Occupancy This project needs the okay for a Temporary Certificate of Occupancy (TCO) from a Fire and Engineering Inspector and the TCO level for the building. Please schedule Fire Final and Engineering Final. Water Sterilization Report is also required for a Level 2 or higher. Please sign-in to your TDC Online account and submit approved water report and schedule Fire and Engineering Finals. Once okay is given for TCO and report is submitted and satisfied please re-request TCO. If you have any questions, please contact PDSD-Permits@tucsonaz.gov TCO Level 4, 30 Days, Ongoing Unit Turns are outstanding for full close out. Units that have had TCO Inspections: A213 A209 A211 A212 A210 A208 A207 A205 A206 A204 A203 A201 A202 B201 B202 B204 B203 B205 B206 B208 B207 B209 B210 B212 B211 B213 B214 B216 B215 B115 B116 B114 B113 B111 B112 B110 B109 B107 B108 B106 B105 B103 B104 A102 A101 A103 A104 A106 A105 A107 A110 A109 A111 A112 A113 C105 C111 C119 B101 B102 C114 C115
TC-CFO-0626-00096 Denied 06/01/2026 N/A UNIT 119 Certificate of Occupancy This project needs the okay for a Temporary Certificate of Occupancy (TCO) from a Fire and Engineering Inspector and the TCO level for the building. Please schedule Fire Final and Engineering Final. Water Sterilization Report is also required for a Level 2 or higher. Please sign-in to your TDC Online account and submit approved water report and schedule Fire and Engineering Finals. Once okay is given for TCO and report is submitted and satisfied please re-request TCO. If you have any questions, please contact PDSD-Permits@tucsonaz.gov TCO Level 4, 30 Days, Ongoing Unit Turns are outstanding for full close out. Units that have had TCO Inspections: A213 A209 A211 A212 A210 A208 A207 A205 A206 A204 A203 A201 A202 B201 B202 B204 B203 B205 B206 B208 B207 B209 B210 B212 B211 B213 B214 B216 B215 B115 B116 B114 B113 B111 B112 B110 B109 B107 B108 B106 B105 B103 B104 A102 A101 A103 A104 A106 A105 A107 A110 A109 A111 A112 A113 C105 C111 C119 B101 B102 C114 C115
TC-CFO-0626-00096 Denied 06/01/2026 N/A UNIT 201 Certificate of Occupancy This project needs the okay for a Temporary Certificate of Occupancy (TCO) from a Fire and Engineering Inspector and the TCO level for the building. Please schedule Fire Final and Engineering Final. Water Sterilization Report is also required for a Level 2 or higher. Please sign-in to your TDC Online account and submit approved water report and schedule Fire and Engineering Finals. Once okay is given for TCO and report is submitted and satisfied please re-request TCO. If you have any questions, please contact PDSD-Permits@tucsonaz.gov TCO Level 4, 30 Days, Ongoing Unit Turns are outstanding for full close out. Units that have had TCO Inspections: A213 A209 A211 A212 A210 A208 A207 A205 A206 A204 A203 A201 A202 B201 B202 B204 B203 B205 B206 B208 B207 B209 B210 B212 B211 B213 B214 B216 B215 B115 B116 B114 B113 B111 B112 B110 B109 B107 B108 B106 B105 B103 B104 A102 A101 A103 A104 A106 A105 A107 A110 A109 A111 A112 A113 C105 C111 C119 B101 B102 C114 C115
TC-CFO-0626-00096 Denied 06/01/2026 N/A UNIT 202 Certificate of Occupancy This project needs the okay for a Temporary Certificate of Occupancy (TCO) from a Fire and Engineering Inspector and the TCO level for the building. Please schedule Fire Final and Engineering Final. Water Sterilization Report is also required for a Level 2 or higher. Please sign-in to your TDC Online account and submit approved water report and schedule Fire and Engineering Finals. Once okay is given for TCO and report is submitted and satisfied please re-request TCO. If you have any questions, please contact PDSD-Permits@tucsonaz.gov TCO Level 4, 30 Days, Ongoing Unit Turns are outstanding for full close out. Units that have had TCO Inspections: A213 A209 A211 A212 A210 A208 A207 A205 A206 A204 A203 A201 A202 B201 B202 B204 B203 B205 B206 B208 B207 B209 B210 B212 B211 B213 B214 B216 B215 B115 B116 B114 B113 B111 B112 B110 B109 B107 B108 B106 B105 B103 B104 A102 A101 A103 A104 A106 A105 A107 A110 A109 A111 A112 A113 C105 C111 C119 B101 B102 C114 C115
TC-CFO-0626-00096 Denied 06/01/2026 N/A UNIT 203 Certificate of Occupancy This project needs the okay for a Temporary Certificate of Occupancy (TCO) from a Fire and Engineering Inspector and the TCO level for the building. Please schedule Fire Final and Engineering Final. Water Sterilization Report is also required for a Level 2 or higher. Please sign-in to your TDC Online account and submit approved water report and schedule Fire and Engineering Finals. Once okay is given for TCO and report is submitted and satisfied please re-request TCO. If you have any questions, please contact PDSD-Permits@tucsonaz.gov TCO Level 4, 30 Days, Ongoing Unit Turns are outstanding for full close out. Units that have had TCO Inspections: A213 A209 A211 A212 A210 A208 A207 A205 A206 A204 A203 A201 A202 B201 B202 B204 B203 B205 B206 B208 B207 B209 B210 B212 B211 B213 B214 B216 B215 B115 B116 B114 B113 B111 B112 B110 B109 B107 B108 B106 B105 B103 B104 A102 A101 A103 A104 A106 A105 A107 A110 A109 A111 A112 A113 C105 C111 C119 B101 B102 C114 C115
TC-CFO-0626-00096 Denied 06/01/2026 N/A UNIT 212 Certificate of Occupancy This project needs the okay for a Temporary Certificate of Occupancy (TCO) from a Fire and Engineering Inspector and the TCO level for the building. Please schedule Fire Final and Engineering Final. Water Sterilization Report is also required for a Level 2 or higher. Please sign-in to your TDC Online account and submit approved water report and schedule Fire and Engineering Finals. Once okay is given for TCO and report is submitted and satisfied please re-request TCO. If you have any questions, please contact PDSD-Permits@tucsonaz.gov TCO Level 4, 30 Days, Ongoing Unit Turns are outstanding for full close out. Units that have had TCO Inspections: A213 A209 A211 A212 A210 A208 A207 A205 A206 A204 A203 A201 A202 B201 B202 B204 B203 B205 B206 B208 B207 B209 B210 B212 B211 B213 B214 B216 B215 B115 B116 B114 B113 B111 B112 B110 B109 B107 B108 B106 B105 B103 B104 A102 A101 A103 A104 A106 A105 A107 A110 A109 A111 A112 A113 C105 C111 C119 B101 B102 C114 C115
TC-CFO-0626-00096 Denied 06/01/2026 N/A UNIT 213 Certificate of Occupancy This project needs the okay for a Temporary Certificate of Occupancy (TCO) from a Fire and Engineering Inspector and the TCO level for the building. Please schedule Fire Final and Engineering Final. Water Sterilization Report is also required for a Level 2 or higher. Please sign-in to your TDC Online account and submit approved water report and schedule Fire and Engineering Finals. Once okay is given for TCO and report is submitted and satisfied please re-request TCO. If you have any questions, please contact PDSD-Permits@tucsonaz.gov TCO Level 4, 30 Days, Ongoing Unit Turns are outstanding for full close out. Units that have had TCO Inspections: A213 A209 A211 A212 A210 A208 A207 A205 A206 A204 A203 A201 A202 B201 B202 B204 B203 B205 B206 B208 B207 B209 B210 B212 B211 B213 B214 B216 B215 B115 B116 B114 B113 B111 B112 B110 B109 B107 B108 B106 B105 B103 B104 A102 A101 A103 A104 A106 A105 A107 A110 A109 A111 A112 A113 C105 C111 C119 B101 B102 C114 C115
TC-CFO-0626-00096 Denied 06/01/2026 N/A UNIT 216 Certificate of Occupancy This project needs the okay for a Temporary Certificate of Occupancy (TCO) from a Fire and Engineering Inspector and the TCO level for the building. Please schedule Fire Final and Engineering Final. Water Sterilization Report is also required for a Level 2 or higher. Please sign-in to your TDC Online account and submit approved water report and schedule Fire and Engineering Finals. Once okay is given for TCO and report is submitted and satisfied please re-request TCO. If you have any questions, please contact PDSD-Permits@tucsonaz.gov TCO Level 4, 30 Days, Ongoing Unit Turns are outstanding for full close out. Units that have had TCO Inspections: A213 A209 A211 A212 A210 A208 A207 A205 A206 A204 A203 A201 A202 B201 B202 B204 B203 B205 B206 B208 B207 B209 B210 B212 B211 B213 B214 B216 B215 B115 B116 B114 B113 B111 B112 B110 B109 B107 B108 B106 B105 B103 B104 A102 A101 A103 A104 A106 A105 A107 A110 A109 A111 A112 A113 C105 C111 C119 B101 B102 C114 C115
TC-CFO-0626-00096 Denied 06/01/2026 N/A UNIT 217 Certificate of Occupancy This project needs the okay for a Temporary Certificate of Occupancy (TCO) from a Fire and Engineering Inspector and the TCO level for the building. Please schedule Fire Final and Engineering Final. Water Sterilization Report is also required for a Level 2 or higher. Please sign-in to your TDC Online account and submit approved water report and schedule Fire and Engineering Finals. Once okay is given for TCO and report is submitted and satisfied please re-request TCO. If you have any questions, please contact PDSD-Permits@tucsonaz.gov TCO Level 4, 30 Days, Ongoing Unit Turns are outstanding for full close out. Units that have had TCO Inspections: A213 A209 A211 A212 A210 A208 A207 A205 A206 A204 A203 A201 A202 B201 B202 B204 B203 B205 B206 B208 B207 B209 B210 B212 B211 B213 B214 B216 B215 B115 B116 B114 B113 B111 B112 B110 B109 B107 B108 B106 B105 B103 B104 A102 A101 A103 A104 A106 A105 A107 A110 A109 A111 A112 A113 C105 C111 C119 B101 B102 C114 C115
TC-COM-1224-02366 Issued 12/18/2024 12/07/2026 Commercial Building The scope of work involves the renovation of an existing 96 unit senior community apartment complex.
TC-COM-1224-02366 Issued 12/18/2024 12/07/2026 UNIT 101 Commercial Building The scope of work involves the renovation of an existing 96 unit senior community apartment complex.
TC-COM-1224-02366 Issued 12/18/2024 12/07/2026 UNIT 102 Commercial Building The scope of work involves the renovation of an existing 96 unit senior community apartment complex.
TC-COM-1224-02366 Issued 12/18/2024 12/07/2026 UNIT 105 Commercial Building The scope of work involves the renovation of an existing 96 unit senior community apartment complex.
TC-COM-1224-02366 Issued 12/18/2024 12/07/2026 UNIT 106 Commercial Building The scope of work involves the renovation of an existing 96 unit senior community apartment complex.
TC-COM-1224-02366 Issued 12/18/2024 12/07/2026 UNIT 107 Commercial Building The scope of work involves the renovation of an existing 96 unit senior community apartment complex.
TC-COM-1224-02366 Issued 12/18/2024 12/07/2026 UNIT 108 Commercial Building The scope of work involves the renovation of an existing 96 unit senior community apartment complex.
TC-COM-1224-02366 Issued 12/18/2024 12/07/2026 UNIT 109 Commercial Building The scope of work involves the renovation of an existing 96 unit senior community apartment complex.
TC-COM-1224-02366 Issued 12/18/2024 12/07/2026 UNIT 110 Commercial Building The scope of work involves the renovation of an existing 96 unit senior community apartment complex.
TC-COM-1224-02366 Issued 12/18/2024 12/07/2026 UNIT 111 Commercial Building The scope of work involves the renovation of an existing 96 unit senior community apartment complex.
TC-COM-1224-02366 Issued 12/18/2024 12/07/2026 UNIT 112 Commercial Building The scope of work involves the renovation of an existing 96 unit senior community apartment complex.
TC-COM-1224-02366 Issued 12/18/2024 12/07/2026 UNIT 113 Commercial Building The scope of work involves the renovation of an existing 96 unit senior community apartment complex.
TC-COM-1224-02366 Issued 12/18/2024 12/07/2026 UNIT 114 Commercial Building The scope of work involves the renovation of an existing 96 unit senior community apartment complex.
TC-COM-1224-02366 Issued 12/18/2024 12/07/2026 UNIT 115 Commercial Building The scope of work involves the renovation of an existing 96 unit senior community apartment complex.
TC-COM-1224-02366 Issued 12/18/2024 12/07/2026 UNIT 116 Commercial Building The scope of work involves the renovation of an existing 96 unit senior community apartment complex.
TC-COM-1224-02366 Issued 12/18/2024 12/07/2026 UNIT 117 Commercial Building The scope of work involves the renovation of an existing 96 unit senior community apartment complex.
TC-COM-1224-02366 Issued 12/18/2024 12/07/2026 UNIT 118 Commercial Building The scope of work involves the renovation of an existing 96 unit senior community apartment complex.
TC-COM-1224-02366 Issued 12/18/2024 12/07/2026 UNIT 119 Commercial Building The scope of work involves the renovation of an existing 96 unit senior community apartment complex.
TC-COM-1224-02366 Issued 12/18/2024 12/07/2026 UNIT 201 Commercial Building The scope of work involves the renovation of an existing 96 unit senior community apartment complex.
TC-COM-1224-02366 Issued 12/18/2024 12/07/2026 UNIT 202 Commercial Building The scope of work involves the renovation of an existing 96 unit senior community apartment complex.
TC-COM-1224-02366 Issued 12/18/2024 12/07/2026 UNIT 203 Commercial Building The scope of work involves the renovation of an existing 96 unit senior community apartment complex.
TC-COM-1224-02366 Issued 12/18/2024 12/07/2026 UNIT 212 Commercial Building The scope of work involves the renovation of an existing 96 unit senior community apartment complex.
TC-COM-1224-02366 Issued 12/18/2024 12/07/2026 UNIT 213 Commercial Building The scope of work involves the renovation of an existing 96 unit senior community apartment complex.
TC-COM-1224-02366 Issued 12/18/2024 12/07/2026 UNIT 216 Commercial Building The scope of work involves the renovation of an existing 96 unit senior community apartment complex.
TC-COM-1224-02366 Issued 12/18/2024 12/07/2026 UNIT 217 Commercial Building The scope of work involves the renovation of an existing 96 unit senior community apartment complex.
T10BU01463 Final 09/21/2010 08/03/2011 SPKLR Install 313 fire sprinklers
T10BU01633 Final 10/26/2010 08/03/2011 BUILD FIRE ALARM SYSTEM
T10CM01741 Final 06/25/2010 07/31/2011 COMBO TEMP CONSTRUCTION TRAILER
T10EX00455 Closed 09/14/2010 11/13/2010 EXCAV TRENCH 36' PAVEMENT AND 8' CURB AND SIDWALK AND 22' DIRT. INSTALL 3" METER AND 6" FIRE SERVICE. (APA)
T10PL01117 Expired 07/16/2010 01/23/2011 PLUMB PRIVATE PLUMBING
T11CM00124 Final 01/18/2011 09/11/2011 COMBO ADDT: RAMADA
T11OT00049 Final 01/10/2011 07/31/2011 SIGN 19249
T22FC00667 Final 09/26/2022 04/02/2023 FIRECONS Customer has existing monitoring but going from land lines to wireless.

Code Enforcement

Parcel Number - 137073210
Date - 06/10/2026 1:10 p.m.
Total Number Of Code Cases - 3
Case Number Case Status Entered Date Closed Date Unit Type Description
T13DV03583 Noverify 05/23/2013 N/A DNR_VIOL Graffiti referral: Tagging on building wall, also on Now Leasing sign. CE03 area
T16DV07840 Complian 11/16/2016 N/A DNR_VIOL TFD ON SITE WITH A BROKEN SPRINKLER HEAD AND FLOODED UNIT
T16DV07841 Complian 11/16/2016 N/A DNR_VIOL TFD ON SITE WITH A BROKEN SPRINKLER HEAD AND FLOODED UNIT

Plans

Parcel Number - 137073210
Date - 06/10/2026 1:10 p.m.
Total Number Of Plans - 2
Plan Number Plan Status Application Date Expired Date Unit Type Description
S07-121 Approved 07/30/2007 01/12/2012 Land Division CASA DEL PUEBLO
T05BA00228 Approved 08/03/2005 N/A Basin