Parcel Search: 133425580
Parcel Search
Parcel Attributes
| Parcel | 133425580 |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | R-3 |
| Tucson Ward | Ward 2 |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Date - 10/07/2026 1:13 a.m.
Total Number Of OZC Plans - (1)
Permits
Parcel Number - 133425580
Date - 10/07/2026 1:13 a.m.
Total Number Of Permits - (8)
| Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TC-COM-0524-00821 | Issued | 05/06/2024 | 12/17/2024 | Commercial Building | Multi meter pack like for like service upgrade./ The AIC rating of the equipment will be 22K per TEP. | |
| TC-COM-0524-00821 | Issued | 05/06/2024 | 12/17/2024 | UNIT A | Commercial Building | Multi meter pack like for like service upgrade./ The AIC rating of the equipment will be 22K per TEP. |
| TC-COM-0524-00821 | Issued | 05/06/2024 | 12/17/2024 | UNIT B | Commercial Building | Multi meter pack like for like service upgrade./ The AIC rating of the equipment will be 22K per TEP. |
| TC-COM-0524-00821 | Issued | 05/06/2024 | 12/17/2024 | UNIT C | Commercial Building | Multi meter pack like for like service upgrade./ The AIC rating of the equipment will be 22K per TEP. |
| TC-COM-0524-00821 | Issued | 05/06/2024 | 12/17/2024 | UNIT D | Commercial Building | Multi meter pack like for like service upgrade./ The AIC rating of the equipment will be 22K per TEP. |
| TC-RES-0925-04572 | Void | 09/16/2025 | N/A | UNIT C | Residential Building - One or Two Family | **VOID: Wrong permit type utilized. Submit a new application under Residential Addition/Alteration Permit. This permit will be voided as it is not the correct permit type.** Project Address: 6062 East Calle Allegre, Tucson, AZ 85715 Install new downstairs bathroom group including one toilet and one sink. Saw cut and trench slab to access existing 3" sewer line. Install approximately 25–30 feet of new 3" and 2" drain and vent piping tying into the existing main line and vent stacks. Install approximately 20–25 feet of new hot and cold water piping routed from existing nearby sources to the new fixtures. Backfill and patch slab after inspection. After finishes are complete, return for Phase 2 to install and set the toilet and vanity. Framing must be complete before rough-in. If post-tension slab is present, it must be scanned prior to cutting. |
| TC-RES-0925-04588 | Expired | 09/17/2025 | N/A | UNIT C | Residential Building - One or Two Family | Interior alteration for bathroom addition. - Install new downstairs bathroom group including one toilet and one sink. Saw cut and trench slab to access existing 3" sewer line. Install approximately 25–30 feet of new 3" and 2" drain and vent piping tying into the existing main line and vent stacks. Install approximately 20–25 feet of new hot and cold water piping routed from existing nearby sources to the new fixtures. - Backfill and patch slab after inspection. After finishes are complete, return for Phase 2 to install and set the toilet and vanity. Framing must be complete before rough-in. If post-tension slab is present, it must be scanned prior to cutting. |
| TC-RES-0925-04650 | Void | 09/22/2025 | N/A | UNIT C | Residential Building - One or Two Family | VOID: Same scope of work as existing permit TC-RES-0925-04588. All work can be done with existing permit. Please continue with the existing permit. This permit will be voided. For questions: Building_official@tucsonaz.gov -- Install new downstairs bathroom group including one toilet and one sink. Saw cut and trench slab to access existing 3" sewer line. Install approximately 25–30 feet of new 3" and 2" drain and vent piping tying into the existing main line and vent stacks. Install approximately 20–25 feet of new hot and cold water piping routed from existing nearby sources to the new fixtures. The technician will tie onto main sewer trunk line ans bring up a drain line. Will then get water from lavatory source and bring over to new washing machine area. The technician will then install a washing machine box and tie in water drain and vent. Backfill and patch slab after inspection. After finishes are complete, return for Phase 2 to install and set the toilet and vanity. Framing must be complete before rough-in. If post-tension slab is present, it must be scanned prior to cutting. |