Permit: TC-RES-0925-04588
Permit Details
Status:
Expired
Type:
Residential Building - One or Two Family
Address:
6642 E CALLE ALEGRIA UNIT C
Address NEW:
6642 E CALLE ALEGRIA UNIT C
Apply Date:
09/17/2025
Applicant:
Daniel Smith
Description:
Interior alteration for bathroom addition. - Install new downstairs bathroom group including one toilet and one sink. Saw cut and trench slab to access existing 3" sewer line. Install approximately 25–30 feet of new 3" and 2" drain and vent piping tying into the existing main line and vent stacks. Install approximately 20–25 feet of new hot and cold water piping routed from existing nearby sources to the new fixtures. - Backfill and patch slab after inspection. After finishes are complete, return for Phase 2 to install and set the toilet and vanity. Framing must be complete before rough-in. If post-tension slab is present, it must be scanned prior to cutting.
Permit Reviews
Permit Number - TC-RES-0925-04588
Permit Status: Expired
Permit Description: Interior alteration for bathroom addition.
- Install new downstairs bathroom group including one toilet and one sink. Saw cut and trench slab to access existing 3" sewer line. Install approximately 25–30 feet of new 3" and 2" drain and vent piping tying into the existing main line and vent stacks. Install approximately 20–25 feet of new hot and cold water piping routed from existing nearby sources to the new fixtures.
- Backfill and patch slab after inspection. After finishes are complete, return for Phase 2 to install and set the toilet and vanity. Framing must be complete before rough-in. If post-tension slab is present, it must be scanned prior to cutting.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/18/2025 | RESIDENTIAL ADD/ALT v.1 | 10/15/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-RES-0925-04588
Permit Status: Expired
Permit Description: Interior alteration for bathroom addition.
- Install new downstairs bathroom group including one toilet and one sink. Saw cut and trench slab to access existing 3" sewer line. Install approximately 25–30 feet of new 3" and 2" drain and vent piping tying into the existing main line and vent stacks. Install approximately 20–25 feet of new hot and cold water piping routed from existing nearby sources to the new fixtures.
- Backfill and patch slab after inspection. After finishes are complete, return for Phase 2 to install and set the toilet and vanity. Framing must be complete before rough-in. If post-tension slab is present, it must be scanned prior to cutting.
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 09/18/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |