Parcel Attributes
Parcel13213078B
JurisdictionTucson
City of Tucson ZoningPAD-15
Water Course

Washes

Tucson WardWard 5
Tucson Registered NeighborhoodSouth Park
Major Streets & Routes

Gateway Route

,

Intersection Buffer

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address

Annexations & Original City Zoning (OCZ)

Date - 11/21/2024 3:30 p.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-56-29 Southside 1650 04/26/1956 2687

Rezoning Cases

Date - 11/21/2024 3:30 p.m.
Total Number Of Rezone Cases - (1)
Case No. Description New Zone Status Status Date Address
C9-06-32 The Bridges PAD - Kino Pkwy PAD Effectuated 11/28/2006 E 36TH

Permits

Parcel Number - 13213078B
Date - 11/21/2024 3:30 p.m.
Total Number Of Permits - (12)
Permit Permit Status Entered Date Expired Date Unit Type Description
DP19-0034 Complete 02/11/2019 05/15/2021 Development Package SITE/GRADE/SWPPP - TEP Kino Substation.
T22OT00439 Expired 06/21/2022 02/19/2023 Sign - Permanent freestanding signage for the Bridges Planned Area Development
TR-UTL-1124-02139 Issued 11/11/2024 12/12/2024 Right-of-Way (ROW) - Utility WO T132216 - REPLACE SIDEWALK PER INSPECTOR CORBITT FARREN
T19BU00531 Withdrwn 10/23/2019 N/A WALL/FEN BRICK WALL
T19CM06797 Final 09/18/2019 09/01/2020 COMBO TAPPING INTO COT WATER MAINLINE - 1' WATER METER AND IRRIGATION
T19RW07170 Final 11/22/2019 12/27/2019 ROW CONSTRUCTION OF THREE NEW DRIVEWAYS, SIDEWALKS, AND CURB TYING IN NEW TEP SUBSTATION TO 36TH AND KINO. WORK TO OCCUR BETWEEN NOW AND 12/31/.19 BASED ON PERMIT TIMEFRAME. WORK TO BE CONSTRUCTED UNDER SHOULDER CLOSURE
T20BU00243 Issued 07/13/2020 04/13/2021 WALL/FEN CONCRETE MONUMENT WALL
T20RW01916 Final 03/27/2020 05/10/2020 ROW PATCH 12' X 12' SECTION OF ASPHALT TO BE COMPLETED SOMETIME WITHIN THE NEXT 2 WEEKS
T20RW03948 Final 07/10/2020 08/14/2020 ROW Install landscaping rock between sidewalk and curb in front of new TEP substation to 36th and Kino. Work to occur between now and 8/31/20 based on permit timeframe. Work to be constructed under shoulder closure. NOTES: ***OTHER PROJECTS/ACTIVITIES ACTIVE IN AREA, AS A CONTRACTOR YOU MUST COORDINATE WITH EXISTING TRAFFIC CONTROL AND WORKERS.***
T20RW04194 Final 07/21/2020 09/21/2020 ROW SIGN MONUMENT FOR KINO PKWY TEP SUBSTATION
T20RW04958 Final 09/09/2020 10/21/2020 ROW CIPP LINING BETWEEN MH 9858-241 and MH 9858-240 LOCATED EAST OF KINO PW ON SOUTH SIDE OF THE ROAD OF 36TH ST. ADDRESS ON APPLICATION: 1800 S 36TH ST
T21RW02668 Void 06/02/2021 N/A ROW PAVEMENT PATCHING ON COMPLETED TEP FEEDER PROJECT INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. PLACE “BUSINESS ACCESS” SIGNS APPROPRIATELY. SEVERAL BUSINESSES ALONG ROUTE. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. TRENCHES/ PITS CANNOT BE LEFT OPEN OVERNIGHT. MUST BE BACKFILLED AND PATCHED OR PLATED. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.) ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. REPLACE/ REFRESH ALL STRIPING THAT IS INTERRUPTED BY PATCHES. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION MAINTAIN PEDESTRIAN ACCESS

Code Enforcement

Parcel Number - 13213078B
Date - 11/21/2024 3:30 p.m.
Total Number Of Code Cases - 2
Case Number Case Status Entered Date Closed Date Unit Type Description
CE-VIO1124-04413 Active 11/04/2024 N/A Code Enforcement Case SWLK / Referred from DTM / Failure to respond to Damaged Sidewalk NOV address still in violation
T19DV08764 Referred 11/08/2019 N/A DNR_VIOL Weeds overgrown

Plans

Parcel Number - 13213078B
Date - 11/21/2024 3:30 p.m.
Total Number Of Plans - 4
Plan Number Plan Status Application Date Expired Date Unit Type Description
CWH-19-0034 Active 02/11/2019 05/15/2021 Basin SITE/GRADE/SWPPP - TEP Kino Substation.
TP-ENT-1024-00024 Needs resubmittal 10/29/2024 N/A Map/Use Changes - Entitlements Special Exception Land Use permit application for an overhead 138 kV transmission line perpendicularly crossing the Gateway Corridor Zone of Kino Parkway. Satisfying UDC 4.9.11.A.13 special exception criteria A & C. Pre-application meeting under TP-PRE-0824-00182.
TP-PRE-0824-00182 In review 08/05/2024 N/A Pre-Application Tucson Electric Power Company (“TEP”) requests a Special Exception Land Use permit (SELUP) for (see Appendix A): • Three perpendicular crossings of GCZs along Route B4 (see Appendices B & D-G). • The portion of Campbell Road (14th Street to Grant Road) on Route D1 that parallels the GCZ (see Appendix C & H). • The Vine 138 kV Substation (see Appendix I). This request is to support the approved Certificate of Environmental Compatibility (CEC) by the Arizona Power Plant and Transmission Line Siting Committee for the Midtown Reliability Project (see Appendix J), which includes the preferred and alternative route for the 138 kV transmission line. The proposed Vine Substation will be permitted by the City of Tucson to serve Midtown customers with 138 kV to 13.8 kV electrical service. The Midtown Reliability Project will upgrade Midtown Tucson’s antiquated and overloaded 46 kV sub-transmission system to a more reliable 138 kV system. This upgrade is urgently needed to replace older, lower-voltage equipment that cannot keep pace with the increasing energy use in central Tucson as the aged Midtown system is at or near capacity. Peak power demand in the area has nearly reached the capacity of the current system. This reduces reliability of the electric grid. The existing Midtown 46 kV system has little to no contingency reserve, creating circumstances that challenge TEP’s ability to serve customers in the area reliably and adversely impacts the future growth potential of Midtown. The existing 138 kV system includes the recently completed Irvington-to-Kino line, which was approved in 2018. The Midtown Reliability Project is a continuation of that line north from the Kino Substation to the proposed Vine Substation terminating at the DeMoss Petrie Substation. This project will tie Midtown into a looped system with access to regional generation and transmission resources. Project Description • In mid-July, TEP was granted approval of a CEC by the Arizona Power Plant and Transmission Line Siting Committee which approved TEP’s preferred Route B4 including three perpendicular crossings of GCZs along Route B4 (see Appendix J). • CEC also approved an alternate route along a portion of Campbell Road (14th Street to Grant Road) on Route D1 that parallels the GCZ. • The approved route or alternative will serve the proposed Vine 138 kV Substation (see Appendix I). Please see attached narrative for further details. Appendices emailed to John Beall in zip file because TDC Online did not support large file sizes.
TP-PRE-0924-00209 In review 09/06/2024 N/A Pre-Application Requesting a CDRC preapplication conference for a COURTESY REVIEW WITH THE TUCSON PIMA COUNTY HISTORICAL COMMISSION'S PLANS REVIEW SUBCOMMITTEE (PRS). Courtesy review with the PRS was recommended by Jodie Brown in the pre-application meeting for TEP's Midtown Reliability Project's special exception land use permit applications (TP-PRE-0824-00182). Looking to discuss how the transmission structures crossing or within a Gateway Corridor Zone can be made more compatible with the adjacent historic districts/neighborhoods.