Parcel Search: 132130680
Parcel Search
Parcel Attributes
Parcel | 132130680 |
---|---|
Jurisdiction | Tucson |
City of Tucson Zoning | PAD-15 |
Water Course | Washes |
Tucson Ward | Ward 5 |
Tucson Registered Neighborhood | South Park |
Pima County Data | Assessor, Recorder, Treasurer, ... |
Parcel Map | Map |
Permits
Parcel Number - 132130680
Date - 11/05/2024 4:22 p.m.
Total Number Of Permits - (16)
Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
DP18-0104 | Issued | 05/02/2018 | 11/09/2021 | Development Package | E SITE/GRADE/SWPPP - GEICO AT THE BRIDGES1st Revision approved 12/27/18 (sheets 1 through 6, and 8 | |
DP18-0245 | Fees due | 10/01/2018 | N/A | Development Package | E SITE/GRADE/SWPPP - THE BRIDGES 150K SF OFFICE.. | |
T18CM04726 | Expired | 06/18/2018 | 01/18/2020 | COMBO | FOUNDATION ONLY | |
T18CM06028 | Final | 08/03/2018 | 04/16/2023 | COMBO | SHELL BLDG | |
T18CM08138 | C of o | 10/11/2018 | 05/06/2020 | COMBO | OFFICE | |
T18CM08766 | Final | 11/02/2018 | 05/05/2019 | COMBO | WORK TRAILER | |
T18CM09868 | L of c | 12/19/2018 | 11/20/2019 | COMBO | SOLAR ON PARKING CANOPY | |
T18FC00963 | Final | 11/29/2018 | 03/24/2020 | FIRECONS | New Automatic Fire Sprinkler System - Geico R-1 | |
T18RW04572 | Final | 10/10/2018 | 11/21/2018 | ROW | INSTALLING UNDERGROUND METER GOING OVER ROAD WITH TEMPORARY POWER POLES TO SUPPLY POWER TO JOB SITE. NIGHT WORK (6P - 6A) WILL BE CROSING TUCSON MARKETPLACE. | |
T19EL00001 | Withdrwn | 01/02/2019 | N/A | ELECT | Network Cable Installed on floors 1 - 3. | |
T19EL00002 | Withdrwn | 01/02/2019 | N/A | ELECT | Low Voltage Network Cable Installed on floors 1 - 3. vh | |
T19EL00004 | Withdrwn | 01/02/2019 | N/A | ELECT | Install Low Voltage Cat6 network cable. (VH) | |
T19FC00195 | Final | 03/15/2019 | 04/03/2023 | FIRECONS | GEICO - New Fire Alarm System | |
T19OT00226 | Final | 03/12/2019 | 07/08/2020 | SIGN | 4-ILLUM WALL SIGN | |
T19RW01466 | Final | 03/20/2019 | 06/23/2019 | ROW | NEW GAS MAIN STUB AND GAS SERVICE TO FEED GEICO THE BRIDES PROJECT CROSSING M L KING JR WAY | |
T19RW01661 | Final | 03/27/2019 | 05/01/2019 | ROW | INSTALLING UNDERGROUND CABLE IN ROW; PLACING CONDUIT ALREADY SET ON SITE |
Plans
Parcel Number - 132130680
Date - 11/05/2024 4:22 p.m.
Total Number Of Plans - 3
Plan Number | Plan Status | Application Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
C9-06-32 | Effected | 11/28/2006 | N/A | REZONING PROCEDURES | A 350-acre master planned mixed-use development with four principal land uses: 1) Approximately 1,000,000 square feet of commercial/retail/office land uses and an approximately 350 room hotel, on 128.7 acres, 2) A maximum of 1084 residential units consisting of single family attached homes, single family detached homes, and apartments, on 117.4 acres, 3) A 53.5 acre research park associated with the University of Arizona, and 4) 50.4 acres of open space and recreation areas. 2-21-18 2018 Bridges PAD Amendment for Sub-Areas B including B-i, B-II, B-III, and B-IV. The total land area of the parcels is 111.7 acres. This PAD Amendment requests that the City of Tucson establish Office/Commercial/Residential (OCR-1) Zone as the underlying zoning classification for Sub-Areas B. | |
S18-058 | Final | 06/20/2018 | N/A | LOT SPLIT | LOT SPLIT | |
T18PRE0008 | Closed | 01/08/2018 | N/A | NEIGHBORHOOD NOTIFICATION |