Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Parcel Search: 125120810
Parcel Search
Annexations & Original City Zoning (OCZ)
Date - 11/13/2024 5:52 a.m.
Total Number Of OZC Plans - (1)
Permits
Parcel Number - 125120810
Date - 11/13/2024 5:52 a.m.
Total Number Of Permits - (46)
Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
DP13-0013 | Complete | 01/23/2013 | 11/07/2018 | Development Package | SITE | |
TC-COM-0224-00302 | Issued | 02/14/2024 | 04/01/2025 | Commercial Building | COMMERCIAL TENANT IMPROVEMENT WITHIN THE EXISTING STRUCTURE LOCATED AT 3302 E SPEEDWAY BLVD TUCSON, AZ 85716. THE SPACE WILL OPERATE AS STORAGE FACILITY FOR CONVENIENCE STORE ITEMS THAT WILL BE DISTRIBUTED BY DOOR DASH. PROJECT SCOPE INCLUDES MODIFICATIONS TO CREATE A BREAK ROOM FOR EMPLOYEES AND AN ADA COMPLIANT BATHROOM. THE SCOPE INCLUDES THE NECESSARY MECHANICAL, PLUMBING AND ELECTRICAL IMPROVEMENTS TO SUPPORT THE USE. PROJECT ALSO INCLUDES INSTALLATION OF EQUIPMENT FOR FOOD PREPARATION ACTIVITY OF ITEMS TO BE DISTRIBUTED TO CONSUMERS FOR OFFSITE CONSUMPTION. | |
TE-FPU-0324-00075 | Issued | 03/18/2024 | N/A | Floodplain Use | COMMERCIAL TENANT IMPROVEMENT WITHIN THE EXISTING STRUCTURE LOCATED AT 3302 E SPEEDWAY BLVD TUCSON, AZ 85716. THE SPACE WILL OPERATE AS STORAGE FACILITY FOR CONVENIENCE STORE ITEMS THAT WILL BE DISTRIBUTED BY DOOR DASH. PROJECT SCOPE INCLUDES MODIFICATIONS TO CREATE A BREAK ROOM FOR EMPLOYEES AND AN ADA COMPLIANT BATHROOM. THE SCOPE INCLUDES THE NECESSARY MECHANICAL, PLUMBING AND ELECTRICAL IMPROVEMENTS TO SUPPORT THE USE. PROJECT ALSO INCLUDES INSTALLATION OF EQUIPMENT FOR FOOD PREPARATION ACTIVITY OF ITEMS TO BE DISTRIBUTED TO CONSUMERS FOR OFFSITE CONSUMPTION. | |
TS-PRM-0324-00135 | Issued | 03/25/2024 | 09/21/2024 | Sign - Permanent | Install one non-lighted wall sign. | |
TZ-CMP-0524-00072 | Complete | 05/29/2024 | N/A | Zoning Compliance | The subject property, known as the Rancho Center, contains three retail buildings situated on approximately 5.45 acres of land and was constructed between 1950-1995. | |
TD-DEV-0724-00217 | Approved | 07/25/2024 | 07/25/2025 | Development Package | Re-development of existing shopping center to include addition of (2) patios | |
TF-FCP-0924-00831 | Inspections | 09/27/2024 | 04/14/2025 | Fire Construction Permit | REPLACE EXISTING SYSTEM | |
TS-PRM-0924-00430 | Issued | 09/30/2024 | 04/03/2025 | Sign - Permanent | LED illuminated wall sign | |
TC-COM-1024-01925 | Complete | 10/04/2024 | 04/29/2025 | Commercial Building | Mechanical unit replacement (like for like). | |
TC-COM-1024-02053 | In review | 10/24/2024 | 04/22/2025 | Commercial Building | EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH). | |
TC-COM-1024-02053 | In review | 10/24/2024 | 04/22/2025 | UNIT 100 | Commercial Building | EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH). |
TC-COM-1024-02053 | In review | 10/24/2024 | 04/22/2025 | UNIT 102 | Commercial Building | EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH). |
TC-COM-1024-02053 | In review | 10/24/2024 | 04/22/2025 | UNIT 104 | Commercial Building | EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH). |
TC-COM-1024-02053 | In review | 10/24/2024 | 04/22/2025 | UNIT 108 | Commercial Building | EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH). |
TC-COM-1024-02053 | In review | 10/24/2024 | 04/22/2025 | UNIT 110 | Commercial Building | EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH). |
TC-COM-1024-02053 | In review | 10/24/2024 | 04/22/2025 | UNIT 112 | Commercial Building | EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH). |
TC-COM-1024-02053 | In review | 10/24/2024 | 04/22/2025 | UNIT 200 | Commercial Building | EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH). |
TC-COM-1024-02053 | In review | 10/24/2024 | 04/22/2025 | UNIT 202 | Commercial Building | EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH). |
TC-COM-1024-02053 | In review | 10/24/2024 | 04/22/2025 | UNIT 204 | Commercial Building | EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH). |
TC-COM-1024-02053 | In review | 10/24/2024 | 04/22/2025 | UNIT 206 | Commercial Building | EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH). |
TC-COM-1024-02053 | In review | 10/24/2024 | 04/22/2025 | UNIT 210 | Commercial Building | EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH). |
TC-COM-1024-02053 | In review | 10/24/2024 | 04/22/2025 | UNIT 212 | Commercial Building | EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH). |
T00CM03270 | Expired | 06/29/2000 | 02/27/2001 | COMBO | TI:RESTAURANT | |
T03OT02020 | Final | 11/17/2003 | 07/03/2004 | SIGN | SIGN:# 6325 | |
T03OT02021 | Final | 11/17/2003 | 08/03/2004 | SIGN | SIGN:# 6324 | |
T05OT02373 | Expired | 09/26/2005 | 11/13/2006 | SIGN | SIGN: 9760 PERFORMANCE BICYCLE | |
T07OT00604 | Final | 03/16/2007 | 12/30/2008 | SIGN | 12788 | |
T11BU00877 | Final | 06/28/2011 | 01/11/2012 | SPKLR | Add 5, relocate 1 fire sprinklers | |
T12BU01373 | Final | 11/23/2012 | 10/20/2013 | SPKLR | Add 197 fire sprinklers | |
T12BU01496 | Final | 12/18/2012 | 11/04/2013 | BUILD | Install new fire alarm system | |
T12CM03029 | Expired | 05/29/2012 | 11/25/2012 | COMBO | TI; INTERIOR DEMO | |
T12CM04447 | Final | 07/23/2012 | 11/05/2013 | COMBO | TI: BOOKMANS RETAIL - STRUCTURAL ONLY | |
T12CM04972 | C of o | 08/13/2012 | 11/10/2013 | COMBO | RETAIL | |
T12CM06243 | Final | 10/05/2012 | 11/11/2013 | COMBO | TEMP CONSTRUCTION TRAILER | |
T12OT00818 | Final | 05/29/2012 | N/A | FLOODPLN | FLOODPLAIN USE PERMIT | |
T12OT01097 | Final | 07/24/2012 | N/A | FLOODPLN | FLOODPLAIN USE PERMIT TI: BOOKMANS RETAIL - STRUCTURAL ONLY | |
T13BU00160 | Final | 02/08/2013 | 11/24/2013 | SPKLR | Install 24 fire sprinklers | |
T13CM00407 | Final | 01/23/2013 | 11/25/2013 | COMBO | PHOTOVOLTATIC SOLAR CANOPY | |
T13CM02614 | Final | 05/01/2013 | 01/01/2014 | COMBO | INSTALL ELECTRIC VEHICLE CHARGING STATION | |
T13OT00082 | Expired | 01/16/2013 | 07/21/2013 | SIGN | 2- ILLUM. WALL SIGNS N. & S. ELEV. / 3- IDENTICAL ILLUM. SIGNS ON N. ELEV. | |
T15BU01240 | Closed | 10/23/2015 | 04/10/2023 | BUILD | FIRE ALARM | |
T16FO00072 | Final | 10/25/2016 | 04/29/2017 | FIREOPER | Cyclovia Event - Mutiple locations for vendors | |
T17OT00166 | Final | 02/13/2017 | 09/03/2017 | SIGN | CHANGE OF COPY WALL SIGNS | |
T18RW05500 | Final | 12/13/2018 | 01/13/2019 | ROW | BARRICADING FOR A 10 FT WALL REPAIR AT THE SOUTHEAST CORNER OF N CAMINO MIRAMONTE AND E SPEEDWAY BL - NO FOUNDATION REPAIR. APPLICANT WILL ACCESS THE WALL FROM A PRIVATE PARKING LOT. IF THE SIDEWALK HAS TO BE CLOSED, THEN A TRAFFIC CONTROL PLAN IS REQUIRED TO BE SUBMITTED TO CITY OF TUCSON TRANSPORTATION AND APPROVED PRIOR TO SIDEWALK CLOSURE. JOC SPEEDWAY & CAMINO MIRAMONTE WALL REPAIR | |
T99EL01827 | Expired | 08/02/1999 | 01/29/2000 | ELECT | SIGN:ELECTRIC:9908002 | |
T99EL02092 | Expired | 08/19/1999 | 02/15/2000 | ELECT | SIGNS:CIRCUIT:9908091 |
Code Enforcement
Parcel Number - 125120810
Date - 11/13/2024 5:52 a.m.
Total Number Of Code Cases - 8
Case Number | Case Status | Entered Date | Closed Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T00VL01256 | Complian | 09/06/2000 | N/A | CODEVIOL | COMPLAINT:SIGN:A-FRAME IN PROW | |
T05FR00336 | Complete | 03/04/2005 | N/A | FIREINSP | Full Inspection | |
T05ZV00366 | Complian | 07/12/2005 | N/A | ZONINGVL | VIOLATION OF APPROVED SITE PLAN - DUMPSTERS LOCATED IN DESIGNATED PARKING SPACES | |
T08FR00973 | Complete | 04/15/2008 | N/A | FIREINSP | FULL FIRE INSPECTION | |
T08FR03133 | Field | 09/25/2008 | N/A | FIREINSP | sprinkler test required | |
T09DV02568 | Noverify | 05/06/2009 | N/A | DNR_VIOL | Overgrown weeds surrounding the parking lot. Litter is scattered in front of the Walgreens and has been there for weeks. | |
T09FR01691 | Field | 05/14/2009 | N/A | FIREINSP | SPRINKLER COMPLAINT | |
T09FR01693 | Field | 05/14/2009 | N/A | FIREINSP | SPRINKLER COMPLAINT |