Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Parcel Search: 12512080A
Parcel Search
Annexations & Original City Zoning (OCZ)
Date - 12/25/2024 4:31 a.m.
Total Number Of OZC Plans - (1)
Permits
Parcel Number - 12512080A
Date - 12/25/2024 4:31 a.m.
Total Number Of Permits - (81)
Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T20OT00065 | Issued | 01/17/2020 | 04/07/2020 | Sign - Annual Portable | 90 DAY BANNER EXP ON APRIL 7th 2020 | |
T22CM01229 | Complete | 02/17/2022 | 08/06/2023 | Commercial Building | Installation of self checkouts, along with electrical power adjustments as required. | |
T21OT00205 | Issued | 03/19/2021 | 09/15/2021 | Floodplain Use | Minor interior remodel; Reconfigure equipment to create online grocery pickup area | |
TC-COM-0424-00670 | Issued | 04/15/2024 | 06/09/2025 | Commercial Building | T.I. to existing retail store installing a new direct outside air unit (DOAS) to the roof. (NO architectural work) | |
TC-COM-0424-00691 | Inspections | 04/17/2024 | 04/22/2025 | Commercial Building | Electric Service Upgrade | |
TR-ROW-0423-00673 | Complete | 04/24/2023 | 07/24/2023 | Right-of-Way (ROW) | The contractors will be removing and replacing poles for Armando Bracamonte for the City of Tucson. Pedestrians' crosswalk will be available. | |
T22OT00328 | Issued | 05/04/2022 | 11/15/2022 | Floodplain Use | In Floodplain Use Permit for the Installation of self checkouts and electrical upgrade to accommodat | |
TZ-CMP-0524-00072 | Complete | 05/29/2024 | N/A | Zoning Compliance | The subject property, known as the Rancho Center, contains three retail buildings situated on approximately 5.45 acres of land and was constructed between 1950-1995. | |
T18FC00509 | Expired | 06/15/2018 | 06/18/2019 | Fire Construction Permit | Automatic Fire Extingshing Sys - TO INSTALL 1-EA ANSUL SYSTEM NOZZLE TO COVER NEW FRYER; Commercial Cooking Suppression - New System: 1 | |
TC-COM-0724-01416 | Approved | 07/24/2024 | 01/20/2025 | Commercial Building | Tenant Improvement | |
TD-DEV-0724-00217 | Issued | 07/25/2024 | 11/21/2027 | Development Package | Re-development of existing shopping center to include addition of (2) patios | |
TF-FOP-0723-01305 | Void | 07/31/2023 | N/A | Fire Operational Permit | VOID-MUST SUBMIT A FIRE SPECIAL EVENT ORGANIZER PERMIT-Seasonal Halloween retail store | |
TF-FOP-0823-01314 | Complete | 08/01/2023 | 11/02/2023 | Fire Operational Permit | Seasonal Halloween retail store. | |
TF-FOP-0824-00905 | Fees due | 08/12/2024 | 09/29/2024 | Fire Operational Permit | Zia Dayz - Pueblo Vida- special events - organizer Day of Contact: Linette Antillon 520-271-8174 | |
TE-FPU-0824-00271 | Issued | 08/28/2024 | N/A | Floodplain Use | Previous Retail prior to that it was Presidio Grill Rest. To be remodeled into the Miramonte Restaurant. | |
T19OT00972 | Expired | 10/14/2019 | 07/07/2020 | Sign - Annual Portable | 90 DAY BANNER EXP ON jan 7th 2020 | |
TC-COM-1024-02002 | Inspections complete | 10/18/2024 | 06/16/2025 | Commercial Building | Like for like 800amp switch replacement. Site is occupied by Whole Foods. | |
TC-COM-1024-02053 | Issued | 10/24/2024 | 06/16/2025 | Commercial Building | EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH). | |
TC-COM-1024-02053 | Issued | 10/24/2024 | 06/16/2025 | UNIT 100 | Commercial Building | EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH). |
TC-COM-1024-02053 | Issued | 10/24/2024 | 06/16/2025 | UNIT 102 | Commercial Building | EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH). |
TC-COM-1024-02053 | Issued | 10/24/2024 | 06/16/2025 | UNIT 104 | Commercial Building | EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH). |
TC-COM-1024-02053 | Issued | 10/24/2024 | 06/16/2025 | UNIT 108 | Commercial Building | EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH). |
TC-COM-1024-02053 | Issued | 10/24/2024 | 06/16/2025 | UNIT 110 | Commercial Building | EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH). |
TC-COM-1024-02053 | Issued | 10/24/2024 | 06/16/2025 | UNIT 112 | Commercial Building | EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH). |
TC-COM-1024-02053 | Issued | 10/24/2024 | 06/16/2025 | UNIT 200 | Commercial Building | EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH). |
TC-COM-1024-02053 | Issued | 10/24/2024 | 06/16/2025 | UNIT 202 | Commercial Building | EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH). |
TC-COM-1024-02053 | Issued | 10/24/2024 | 06/16/2025 | UNIT 204 | Commercial Building | EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH). |
TC-COM-1024-02053 | Issued | 10/24/2024 | 06/16/2025 | UNIT 206 | Commercial Building | EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH). |
TC-COM-1024-02053 | Issued | 10/24/2024 | 06/16/2025 | UNIT 210 | Commercial Building | EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH). |
TC-COM-1024-02053 | Issued | 10/24/2024 | 06/16/2025 | UNIT 212 | Commercial Building | EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH). |
TE-FPU-1124-00391 | Issued | 11/14/2024 | N/A | Floodplain Use | Re-development of existing shopping center to include addition of (2) patios | |
TC-COM-1223-02824 | Issued | 12/13/2023 | 06/15/2024 | UNIT 202 | Commercial Building | Commercial reconnect |
T07BU00878 | Final | 04/20/2007 | 12/05/2007 | BUILD | KITCHEN EXHAUST HOOD FIRE SUPPRESSION SYSTEM | |
T09BU01135 | Expired | 08/03/2009 | 02/23/2010 | BUILD | KITCHEN EXHAUST HOOD FIRE SUPPRESSION SYSTEM | |
T03OT00824 | C of o | 05/09/2003 | 11/26/2003 | C-OF-O | C OF O:RESTAURANT | |
T05OT03103 | Withdrwn | 12/14/2005 | N/A | C-OF-O | C OF O:SALON | |
T09OT02072 | C of o | 09/29/2009 | 03/30/2010 | C-OF-O | C OF O: BEAUTY SALON & SPA | |
T06CM00314 | C of o | 01/18/2006 | 02/18/2007 | COMBO | TI: NAIL SALON | |
T09CM01798 | Withdrwn | 07/09/2009 | N/A | COMBO | TI: WILD OATS MARKET, C OF O : T09DV03596 | |
T11CM02454 | Expired | 08/05/2011 | 11/05/2013 | COMBO | TI: GROCERY STORE | |
T12CM07486 | Expired | 11/27/2012 | 06/19/2013 | COMBO | REPLACE REFRIGERATION EQUIPMENT - GROCERY STORE | |
T14CM05660 | L of c | 08/28/2014 | 05/09/2015 | COMBO | INTERIOR DEMO | |
T18CM03999 | C of o | 05/23/2018 | 04/15/2019 | COMBO | DENTAL OFFICE | |
T03CM04129 | Final | 08/20/2003 | 03/07/2004 | COMBO | GENERAL REPAIR:VEHICLE DAMAGE | |
T09CM01612 | Final | 06/23/2009 | 12/22/2009 | COMBO | REPAIR:ELECTRIC & MECHANICAL T09DV03596 | |
T09CM02243 | Expired | 08/21/2009 | 06/12/2012 | COMBO | TI: MARKET | |
T10CM00154 | Final | 01/20/2010 | 02/21/2011 | COMBO | PRE INSPECTION OF KITCHEN EQUIPMENT | |
T15CM03555 | Final | 05/29/2015 | 03/23/2016 | COMBO | RETAIL | |
T15CM03830 | Final | 06/08/2015 | 03/26/2016 | COMBO | SHELL CONVERSION; CHANGE OF USE | |
T00EL01243 | Final | 05/17/2000 | 12/13/2000 | ELECT | ELECTRIC:4 CIRCUITS | |
T99EL03248 | Final | 12/16/1999 | 08/30/2000 | ELECT | SIGN:CIRCUIT:TS199912-216 | |
T12EX00480 | Closed | 09/11/2012 | 11/10/2012 | EXCAV | TIE INTO CATCH BASIN LOCATED AT SHOPPING CENTER DRIVEWAY WITH A 12" RCP WITH ADOT STD. DTL C-13.80 | |
T21FO00508 | Final | 08/11/2021 | 08/16/2022 | FIREOPER | GENERAL INSPECTION | |
T22FO00662 | Final | 08/03/2022 | 04/02/2023 | FIREOPER | SPIRIT HALLOWEEN STORE 60140 | |
T09OT02325 | Issued | 11/02/2009 | N/A | FLOODPLN | FUP:WHOLE FOODS | |
T11OT01562 | Final | 08/09/2011 | N/A | FLOODPLN | FLOODPLAIN USE PERMIT TI: GROCERY STORE | |
T15OT00789 | Final | 06/11/2015 | N/A | FLOODPLN | FP | |
T15OT00732 | Final | 05/29/2015 | N/A | FLOODPLN | FLOODPLAIN USE PERMIT | |
T03ME00278 | Final | 05/30/2003 | 02/10/2004 | MECH | REPLACE:4 A/C UNITS (APA) | |
T18RW00543 | Final | 01/30/2018 | 03/07/2018 | ROW | REMOVE DAMAGED SPLIT FACE BLOCK WALL AND REPLACE | |
T17RW05187 | Final | 11/22/2017 | 01/22/2018 | ROW | Riser up on TEP pole S/W of 5th Street Overlash .144 ct of Fiber going East 124' continue going North 1165' continue West 490' and riser down trench bore 15' going West to out of ROW. | |
T18RW02248 | Final | 05/15/2018 | 10/14/2018 | ROW | N.362907 - Job will start in MH 1932 at Cam Miramonte & Hawthorne bore to Cam Miramonte and 1st placing 2-4”PVC ducts. 1 New HH at 2nd and Cam Miramonte. 1 New HH at 1st and Cam Miramonte and 1 New HH at 1st and Jones Blvd. Using futurepath and microducts and fiber across entire job REVISION: N.362907 / T18RW02248 - From HH placement in sidewalk to placement in road and placement on property. Also attached updated TCP and CAD Drawing showing design changes | |
T10OT00433 | Final | 02/24/2010 | 10/10/2010 | SIGN | 17973 | |
T18OT00971 | Closed | 09/11/2018 | 07/10/2019 | SIGN | 90 DAY BANNER EXP ON jan 6th 2019 | |
T19OT00099 | Closed | 01/31/2019 | 10/12/2019 | SIGN | 90 DAY BANNER EXP ON APRIL 11th 2019 | |
T19OT00334 | Closed | 04/12/2019 | 01/06/2020 | SIGN | 90 DAY BANNER EXP ON JULY 11 2019 | |
T19OT00580 | Closed | 06/24/2019 | 10/09/2019 | SIGN | 90 DAY BANNER EXP ON OCT 9 2019 | |
T19OT00798 | Closed | 08/21/2019 | 05/20/2020 | SIGN | 90 DAY BANNER EXP ON NOV 20TH 2019 | |
T03OT00932 | Final | 05/22/2003 | 01/10/2004 | SIGN | SIGN:5570 | |
T03OT02264 | Final | 12/18/2003 | 08/31/2004 | SIGN | SIGN:6495 | |
T04OT00640 | Final | 03/29/2004 | 10/12/2004 | SIGN | SIGN:6940 | |
T05OT03187 | Final | 12/22/2005 | 08/26/2006 | SIGN | 10316 | |
T05OT03189 | Final | 12/22/2005 | 08/05/2006 | SIGN | 10315 | |
T08OT00954 | Final | 04/21/2008 | 12/15/2008 | SIGN | 14840 | |
T08OT01561 | Final | 06/30/2008 | 01/06/2009 | SIGN | 15221 | |
T10OT00432 | Expired | 02/24/2010 | 10/20/2010 | SIGN | 17972 | |
T14OT01023 | Expired | 08/11/2014 | 02/17/2015 | SIGN | 1- ILLUM WALL SIGN | |
T15OT00547 | Final | 04/24/2015 | 04/11/2016 | SIGN | 1- ILLUM WALL SIGN | |
T18OT00929 | Final | 09/04/2018 | 04/07/2019 | SIGN | 2-ILLUM WALL SIGNs | |
T15BU00786 | Final | 07/08/2015 | 01/30/2016 | SPKLR | 55 NEW FIRE SPRINKLERS | |
T15BU00965 | Final | 08/20/2015 | 03/08/2016 | SPKLR | FIRE SPRKL |
Code Enforcement
Parcel Number - 12512080A
Date - 12/25/2024 4:31 a.m.
Total Number Of Code Cases - 19
Case Number | Case Status | Entered Date | Closed Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T03VL00614 | Complian | 06/27/2003 | N/A | CODEVIOL | COMPLAINT:EMERGENCY CALLOUT - VEHICLE INTO BUILDING | |
T06VL00973 | Complian | 07/25/2006 | N/A | CODEVIOL | SIGN COMPLAINT | |
T09DV03596 | Complian | 06/23/2009 | N/A | DNR_VIOL | CAR THRU BUILDING, ELECTRICAL PROBLEMS | |
T17DV00628 | Complian | 02/13/2017 | N/A | DNR_VIOL | COMMUNICATION CALLED THAT T.P.D. ON SITE WITH A CAR THROUGH BUILDING, E170440106 | |
T10DV00797 | Invalid | 02/23/2010 | N/A | DNR_VIOL | The El Rancho electronic sign is changed more than once an hour. The text is changing approximately every 10 seconds. | |
T11DV04679 | Noverify | 06/20/2011 | N/A | DNR_VIOL | Marquee flashes messages from the stores within the Rancho Center every few seconds. | |
T11DV09002 | Complian | 11/03/2011 | N/A | DNR_VIOL | Overgrown grass/weeds/vegetation in easement area. | |
T16DV07625 | Complian | 11/02/2016 | N/A | DNR_VIOL | REQUIRED BICYCLE RACK HAS BEEN REMOVED FROM THE FRONT OF THE BUILDING. HOLES ARE IN THE CEMENT WHERE RACK USED TO BE | |
T08FR01699 | Complete | 06/25/2008 | N/A | FIREINSP | COMPLAINT ABOUT AISLE WIDTHS. | |
T05FR00539 | Complete | 04/27/2005 | N/A | FIREINSP | Full Inspection | |
T07FR00595 | Complete | 03/28/2007 | N/A | FIREINSP | FULL PREVENTION INSPECTION | |
T07FR00596 | Complete | 03/28/2007 | N/A | FIREINSP | FULL PREVENTION INSPECTION | |
T07FR00597 | Field | 03/28/2007 | N/A | FIREINSP | FULL PREVENTION INSPECTION | |
T07FR00716 | Complete | 04/13/2007 | N/A | FIREINSP | Request for Inspector | |
T07FR01014 | Complete | 05/25/2007 | N/A | FIREINSP | FULL FIRE INSPECTION | |
T08FR00856 | Complete | 04/08/2008 | N/A | FIREINSP | FULL FIRE INSPECTION | |
T08FR00972 | Complete | 04/15/2008 | N/A | FIREINSP | FULL FIRE INSPECTION | |
T09FR02039 | Complete | 06/24/2009 | N/A | FIREINSP | FULL FIRE INSPECTION | |
T09FR02198 | Complete | 07/07/2009 | N/A | FIREINSP | FULL FIRE INSPECTION |
Plans
Parcel Number - 12512080A
Date - 12/25/2024 4:31 a.m.
Total Number Of Plans - 1
Plan Number | Plan Status | Application Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TC-BCA-0924-00039 | Complete | 09/18/2024 | N/A | Appeal - Building Official | Tenant Improvement |