Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel Search

 
Parcel Attributes
Parcel12512080A
JurisdictionTucson
City of Tucson ZoningC-3
Water Course

Washes

Tucson WardWard 6
Tucson Registered NeighborhoodMiramonte
Major Streets & Routes

Arterial or Collector

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Addresses

Annexations & Original City Zoning (OCZ)

Date - 12/25/2024 4:31 a.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-53-31 Encanto Park 1402 08/31/1953 1419

Permits

Parcel Number - 12512080A
Date - 12/25/2024 4:31 a.m.
Total Number Of Permits - (81)
Permit Permit Status Entered Date Expired Date Unit Type Description
T20OT00065 Issued 01/17/2020 04/07/2020 Sign - Annual Portable 90 DAY BANNER EXP ON APRIL 7th 2020
T22CM01229 Complete 02/17/2022 08/06/2023 Commercial Building Installation of self checkouts, along with electrical power adjustments as required.
T21OT00205 Issued 03/19/2021 09/15/2021 Floodplain Use Minor interior remodel; Reconfigure equipment to create online grocery pickup area
TC-COM-0424-00670 Issued 04/15/2024 06/09/2025 Commercial Building T.I. to existing retail store installing a new direct outside air unit (DOAS) to the roof. (NO architectural work)
TC-COM-0424-00691 Inspections 04/17/2024 04/22/2025 Commercial Building Electric Service Upgrade
TR-ROW-0423-00673 Complete 04/24/2023 07/24/2023 Right-of-Way (ROW) The contractors will be removing and replacing poles for Armando Bracamonte for the City of Tucson. Pedestrians' crosswalk will be available.
T22OT00328 Issued 05/04/2022 11/15/2022 Floodplain Use In Floodplain Use Permit for the Installation of self checkouts and electrical upgrade to accommodat
TZ-CMP-0524-00072 Complete 05/29/2024 N/A Zoning Compliance The subject property, known as the Rancho Center, contains three retail buildings situated on approximately 5.45 acres of land and was constructed between 1950-1995.
T18FC00509 Expired 06/15/2018 06/18/2019 Fire Construction Permit Automatic Fire Extingshing Sys - TO INSTALL 1-EA ANSUL SYSTEM NOZZLE TO COVER NEW FRYER; Commercial Cooking Suppression - New System: 1
TC-COM-0724-01416 Approved 07/24/2024 01/20/2025 Commercial Building Tenant Improvement
TD-DEV-0724-00217 Issued 07/25/2024 11/21/2027 Development Package Re-development of existing shopping center to include addition of (2) patios
TF-FOP-0723-01305 Void 07/31/2023 N/A Fire Operational Permit VOID-MUST SUBMIT A FIRE SPECIAL EVENT ORGANIZER PERMIT-Seasonal Halloween retail store
TF-FOP-0823-01314 Complete 08/01/2023 11/02/2023 Fire Operational Permit Seasonal Halloween retail store.
TF-FOP-0824-00905 Fees due 08/12/2024 09/29/2024 Fire Operational Permit Zia Dayz - Pueblo Vida- special events - organizer Day of Contact: Linette Antillon 520-271-8174
TE-FPU-0824-00271 Issued 08/28/2024 N/A Floodplain Use Previous Retail prior to that it was Presidio Grill Rest. To be remodeled into the Miramonte Restaurant.
T19OT00972 Expired 10/14/2019 07/07/2020 Sign - Annual Portable 90 DAY BANNER EXP ON jan 7th 2020
TC-COM-1024-02002 Inspections complete 10/18/2024 06/16/2025 Commercial Building Like for like 800amp switch replacement. Site is occupied by Whole Foods.
TC-COM-1024-02053 Issued 10/24/2024 06/16/2025 Commercial Building EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH).
TC-COM-1024-02053 Issued 10/24/2024 06/16/2025 UNIT 100 Commercial Building EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH).
TC-COM-1024-02053 Issued 10/24/2024 06/16/2025 UNIT 102 Commercial Building EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH).
TC-COM-1024-02053 Issued 10/24/2024 06/16/2025 UNIT 104 Commercial Building EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH).
TC-COM-1024-02053 Issued 10/24/2024 06/16/2025 UNIT 108 Commercial Building EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH).
TC-COM-1024-02053 Issued 10/24/2024 06/16/2025 UNIT 110 Commercial Building EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH).
TC-COM-1024-02053 Issued 10/24/2024 06/16/2025 UNIT 112 Commercial Building EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH).
TC-COM-1024-02053 Issued 10/24/2024 06/16/2025 UNIT 200 Commercial Building EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH).
TC-COM-1024-02053 Issued 10/24/2024 06/16/2025 UNIT 202 Commercial Building EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH).
TC-COM-1024-02053 Issued 10/24/2024 06/16/2025 UNIT 204 Commercial Building EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH).
TC-COM-1024-02053 Issued 10/24/2024 06/16/2025 UNIT 206 Commercial Building EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH).
TC-COM-1024-02053 Issued 10/24/2024 06/16/2025 UNIT 210 Commercial Building EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH).
TC-COM-1024-02053 Issued 10/24/2024 06/16/2025 UNIT 212 Commercial Building EXISTING SHOPPING CENTER TO REMAIN, BUILDING AREAS REMAIN, NO INCREASE IN BUILDING AREA. PER DEVELOPMENT PACKAGE TD-DEV-0724-00217 TWO NEW SEASONAL PATIOS HAVE BEEN ADDED TO 3352 EAST SPEEDWAY BLVD (BUILDING 1) AND ONE NEW SEASONAL PATIO HAS BEEN ADDED TO 3360 EAST SPEEDWAY BLVD (BUILDING 2). THIS PROJECT IS A REWORKING OF THE EXISTING NORTH COLONNADE OF THE ENTIRE SHOPPING CENTER. IT IS PROPOSED TO KEEP THE EXISTING STRUCTURAL STEEL COLUMNS AND SUPPORT STRUCTURE AND REWORK FOR A NEW TUBE STEEL AND STEEL SHEET MATERIAL APPLIED FACADE AND CEILING TREATMENT. IN ADDITION TO UPDATING THE NORTH COLONNADE NEW PROPOSED STRUCTURAL STEEL COLONNADES 'RETURN' FROM THE EXISTING NORTH COLONNADES EXTENDING SOUTH FLANKING THE NEW PAAL THAT CONNECTS THE NORTH AND SOUTH PARKING AREAS. THE EXISTING COLONNADE FACADE TREATMENT SHALL BE CAREFULLY REMOVED (WOOD FRAMED PARAPETS AND STUCCO FINISH).
TE-FPU-1124-00391 Issued 11/14/2024 N/A Floodplain Use Re-development of existing shopping center to include addition of (2) patios
TC-COM-1223-02824 Issued 12/13/2023 06/15/2024 UNIT 202 Commercial Building Commercial reconnect
T07BU00878 Final 04/20/2007 12/05/2007 BUILD KITCHEN EXHAUST HOOD FIRE SUPPRESSION SYSTEM
T09BU01135 Expired 08/03/2009 02/23/2010 BUILD KITCHEN EXHAUST HOOD FIRE SUPPRESSION SYSTEM
T03OT00824 C of o 05/09/2003 11/26/2003 C-OF-O C OF O:RESTAURANT
T05OT03103 Withdrwn 12/14/2005 N/A C-OF-O C OF O:SALON
T09OT02072 C of o 09/29/2009 03/30/2010 C-OF-O C OF O: BEAUTY SALON & SPA
T06CM00314 C of o 01/18/2006 02/18/2007 COMBO TI: NAIL SALON
T09CM01798 Withdrwn 07/09/2009 N/A COMBO TI: WILD OATS MARKET, C OF O : T09DV03596
T11CM02454 Expired 08/05/2011 11/05/2013 COMBO TI: GROCERY STORE
T12CM07486 Expired 11/27/2012 06/19/2013 COMBO REPLACE REFRIGERATION EQUIPMENT - GROCERY STORE
T14CM05660 L of c 08/28/2014 05/09/2015 COMBO INTERIOR DEMO
T18CM03999 C of o 05/23/2018 04/15/2019 COMBO DENTAL OFFICE
T03CM04129 Final 08/20/2003 03/07/2004 COMBO GENERAL REPAIR:VEHICLE DAMAGE
T09CM01612 Final 06/23/2009 12/22/2009 COMBO REPAIR:ELECTRIC & MECHANICAL T09DV03596
T09CM02243 Expired 08/21/2009 06/12/2012 COMBO TI: MARKET
T10CM00154 Final 01/20/2010 02/21/2011 COMBO PRE INSPECTION OF KITCHEN EQUIPMENT
T15CM03555 Final 05/29/2015 03/23/2016 COMBO RETAIL
T15CM03830 Final 06/08/2015 03/26/2016 COMBO SHELL CONVERSION; CHANGE OF USE
T00EL01243 Final 05/17/2000 12/13/2000 ELECT ELECTRIC:4 CIRCUITS
T99EL03248 Final 12/16/1999 08/30/2000 ELECT SIGN:CIRCUIT:TS199912-216
T12EX00480 Closed 09/11/2012 11/10/2012 EXCAV TIE INTO CATCH BASIN LOCATED AT SHOPPING CENTER DRIVEWAY WITH A 12" RCP WITH ADOT STD. DTL C-13.80
T21FO00508 Final 08/11/2021 08/16/2022 FIREOPER GENERAL INSPECTION
T22FO00662 Final 08/03/2022 04/02/2023 FIREOPER SPIRIT HALLOWEEN STORE 60140
T09OT02325 Issued 11/02/2009 N/A FLOODPLN FUP:WHOLE FOODS
T11OT01562 Final 08/09/2011 N/A FLOODPLN FLOODPLAIN USE PERMIT TI: GROCERY STORE
T15OT00789 Final 06/11/2015 N/A FLOODPLN FP
T15OT00732 Final 05/29/2015 N/A FLOODPLN FLOODPLAIN USE PERMIT
T03ME00278 Final 05/30/2003 02/10/2004 MECH REPLACE:4 A/C UNITS (APA)
T18RW00543 Final 01/30/2018 03/07/2018 ROW REMOVE DAMAGED SPLIT FACE BLOCK WALL AND REPLACE
T17RW05187 Final 11/22/2017 01/22/2018 ROW Riser up on TEP pole S/W of 5th Street Overlash .144 ct of Fiber going East 124' continue going North 1165' continue West 490' and riser down trench bore 15' going West to out of ROW.
T18RW02248 Final 05/15/2018 10/14/2018 ROW N.362907 - Job will start in MH 1932 at Cam Miramonte & Hawthorne bore to Cam Miramonte and 1st placing 2-4”PVC ducts. 1 New HH at 2nd and Cam Miramonte. 1 New HH at 1st and Cam Miramonte and 1 New HH at 1st and Jones Blvd. Using futurepath and microducts and fiber across entire job REVISION: N.362907 / T18RW02248 - From HH placement in sidewalk to placement in road and placement on property. Also attached updated TCP and CAD Drawing showing design changes
T10OT00433 Final 02/24/2010 10/10/2010 SIGN 17973
T18OT00971 Closed 09/11/2018 07/10/2019 SIGN 90 DAY BANNER EXP ON jan 6th 2019
T19OT00099 Closed 01/31/2019 10/12/2019 SIGN 90 DAY BANNER EXP ON APRIL 11th 2019
T19OT00334 Closed 04/12/2019 01/06/2020 SIGN 90 DAY BANNER EXP ON JULY 11 2019
T19OT00580 Closed 06/24/2019 10/09/2019 SIGN 90 DAY BANNER EXP ON OCT 9 2019
T19OT00798 Closed 08/21/2019 05/20/2020 SIGN 90 DAY BANNER EXP ON NOV 20TH 2019
T03OT00932 Final 05/22/2003 01/10/2004 SIGN SIGN:5570
T03OT02264 Final 12/18/2003 08/31/2004 SIGN SIGN:6495
T04OT00640 Final 03/29/2004 10/12/2004 SIGN SIGN:6940
T05OT03187 Final 12/22/2005 08/26/2006 SIGN 10316
T05OT03189 Final 12/22/2005 08/05/2006 SIGN 10315
T08OT00954 Final 04/21/2008 12/15/2008 SIGN 14840
T08OT01561 Final 06/30/2008 01/06/2009 SIGN 15221
T10OT00432 Expired 02/24/2010 10/20/2010 SIGN 17972
T14OT01023 Expired 08/11/2014 02/17/2015 SIGN 1- ILLUM WALL SIGN
T15OT00547 Final 04/24/2015 04/11/2016 SIGN 1- ILLUM WALL SIGN
T18OT00929 Final 09/04/2018 04/07/2019 SIGN 2-ILLUM WALL SIGNs
T15BU00786 Final 07/08/2015 01/30/2016 SPKLR 55 NEW FIRE SPRINKLERS
T15BU00965 Final 08/20/2015 03/08/2016 SPKLR FIRE SPRKL

Code Enforcement

Parcel Number - 12512080A
Date - 12/25/2024 4:31 a.m.
Total Number Of Code Cases - 19
Case Number Case Status Entered Date Closed Date Unit Type Description
T03VL00614 Complian 06/27/2003 N/A CODEVIOL COMPLAINT:EMERGENCY CALLOUT - VEHICLE INTO BUILDING
T06VL00973 Complian 07/25/2006 N/A CODEVIOL SIGN COMPLAINT
T09DV03596 Complian 06/23/2009 N/A DNR_VIOL CAR THRU BUILDING, ELECTRICAL PROBLEMS
T17DV00628 Complian 02/13/2017 N/A DNR_VIOL COMMUNICATION CALLED THAT T.P.D. ON SITE WITH A CAR THROUGH BUILDING, E170440106
T10DV00797 Invalid 02/23/2010 N/A DNR_VIOL The El Rancho electronic sign is changed more than once an hour. The text is changing approximately every 10 seconds.
T11DV04679 Noverify 06/20/2011 N/A DNR_VIOL Marquee flashes messages from the stores within the Rancho Center every few seconds.
T11DV09002 Complian 11/03/2011 N/A DNR_VIOL Overgrown grass/weeds/vegetation in easement area.
T16DV07625 Complian 11/02/2016 N/A DNR_VIOL REQUIRED BICYCLE RACK HAS BEEN REMOVED FROM THE FRONT OF THE BUILDING. HOLES ARE IN THE CEMENT WHERE RACK USED TO BE
T08FR01699 Complete 06/25/2008 N/A FIREINSP COMPLAINT ABOUT AISLE WIDTHS.
T05FR00539 Complete 04/27/2005 N/A FIREINSP Full Inspection
T07FR00595 Complete 03/28/2007 N/A FIREINSP FULL PREVENTION INSPECTION
T07FR00596 Complete 03/28/2007 N/A FIREINSP FULL PREVENTION INSPECTION
T07FR00597 Field 03/28/2007 N/A FIREINSP FULL PREVENTION INSPECTION
T07FR00716 Complete 04/13/2007 N/A FIREINSP Request for Inspector
T07FR01014 Complete 05/25/2007 N/A FIREINSP FULL FIRE INSPECTION
T08FR00856 Complete 04/08/2008 N/A FIREINSP FULL FIRE INSPECTION
T08FR00972 Complete 04/15/2008 N/A FIREINSP FULL FIRE INSPECTION
T09FR02039 Complete 06/24/2009 N/A FIREINSP FULL FIRE INSPECTION
T09FR02198 Complete 07/07/2009 N/A FIREINSP FULL FIRE INSPECTION

Plans

Parcel Number - 12512080A
Date - 12/25/2024 4:31 a.m.
Total Number Of Plans - 1
Plan Number Plan Status Application Date Expired Date Unit Type Description
TC-BCA-0924-00039 Complete 09/18/2024 N/A Appeal - Building Official Tenant Improvement