Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel Search

 
Parcel Attributes
Parcel12407190H
JurisdictionTucson, Pima County
City of Tucson ZoningI-1
Tucson WardWard 5
Major Street & Route

Gateway Route
-
Intersection Buffer

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Date - 12/06/2025 1:54 a.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
1/4 Mile Each Direction (N, E, S, W) 202 08/17/1905

Rezoning Cases

Date - 12/06/2025 1:54 a.m.
Total Number Of Rezone Cases - (1)
Case No. Description New Zone Status Status Date Address
C9-20-11 Sunshine Mile UOD Ordinanced 10/20/2020 801 E 12TH

Permits

Parcel Number - 12407190H
Date - 12/06/2025 1:54 a.m.
Total Number Of Permits - (6)
Permit Permit Status Entered Date Expired Date Unit Type Description
DP16-0071 Complete 04/25/2016 09/22/2017 Development Package SITE/GRADING/SWPPP - NEW BUS TERMINAL AND PARKING
DP17-0104 Complete 05/01/2017 04/25/2018 Development Package SITE
TR-UTL-0625-00878 Complete 06/02/2025 07/02/2025 Right-of-Way (ROW) - Utility EMERGENCY -work order 3055735, 801 e 12th St, repair broken water valve south side in asphalt, 8lf. ca
DS16-16 Approved 06/08/2016 N/A Zoning Compliance Tucson Greyhound Terminal Relocation - TSMR Modify 7-01.4.1.A for safety issues.
TR-UTL-1125-02019 In review 11/25/2025 N/A Right-of-Way (ROW) - Utility Permit is for 13 short-term public notice signs required by the Arizona Corporation Commission providing notice of an approved 138kV transmission line that will be constructed in the area. There will be no impact to traffic, each of the proposed sign locations are located within road right-of-way but clear of all paved surfaces and travel ways. Installation of each sign will take less than 1 hour. Signs will encumber the right-of-way until the approved 138kV electric transmission line is constructed - expected in-service date mid-2027.
T20RW04486 Final 08/06/2020 09/12/2020 ROW TEAM FISHEL WILL BORE @ 890 LF AND BE CONNECTING TO EXISTING CONDUIT, HAND HOLE OVER EXISTING CONDUIT FOR FUTURE PATHS. BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP. ** Please note that the north side of Broadway Blvd is closed. Traffic currently flowing on the south side. CONTACT AJ SCHEETZ, ASHTON CO, AT 520-909-4815 FOR COORDINATION.

Code Enforcement

Parcel Number - 12407190H
Date - 12/06/2025 1:54 a.m.
Total Number Of Code Cases - 1
Case Number Case Status Entered Date Closed Date Unit Type Description
CE-VIO0624-02501 Closed - unfounded 06/27/2024 07/25/2024 Code Enforcement Case WEEDS / Referred from ES / Failure to respond to Weeds Protocol address still in violation / Excessive Weeds in front or back of property

Plans

Parcel Number - 12407190H
Date - 12/06/2025 1:54 a.m.
Total Number Of Plans - 1
Plan Number Plan Status Application Date Expired Date Unit Type Description
CWH-16-0071 Active 04/25/2016 09/22/2017 Basin SITE/GRADING/SWPPP - NEW BUS TERMINAL AND PARKING