Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Parcel Search: 124040990
Parcel Search
Parcel Attributes
Parcel | 124040990 |
---|---|
Jurisdiction | Tucson |
City of Tucson Zoning | R-3 |
Water Course | Washes |
Tucson Ward | Ward 6 |
Tucson Registered Neighborhood | West University |
Pima County Data | Assessor, Recorder, Treasurer, ... |
Parcel Map | Map |
Addresses |
Annexations & Original City Zoning (OCZ)
Date - 11/14/2024 5:48 p.m.
Total Number Of OZC Plans - (1)
Plan | Description | Annexation Ordinance | Effective Date | OCZ Ordinance |
---|---|---|---|---|
1/4 Mile Each Direction (N, E, S, W) | 202 | 08/17/1905 | None |
Rezoning Cases
Date - 11/14/2024 5:48 p.m.
Total Number Of Rezone Cases - (1)
Case No. | Description | New Zone | Status | Status Date | Address |
---|---|---|---|---|---|
C9-12-01 | C9-12-01 Main Gate Dist. (UOD) | UOD | Effectuated | 01/05/2012 | E 2ND |
Permits
Parcel Number - 124040990
Date - 11/14/2024 5:48 p.m.
Total Number Of Permits - (17)
Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TF-FOP-0423-00758 | Complete | 04/03/2023 | 04/20/2023 | Fire Operational Permit | Exhibit opening at the musuem on 4/19/23 | |
T21RW05321 | Complete | 12/20/2021 | 12/17/2022 | Right-of-Way (ROW) | The City of Tucson grants Grub Hub a revocable (for cause), non-exclusive permit to use designated c | |
T01EX00372 | Closed | 03/29/2001 | 05/28/2001 | EXCAV | EXCAV:9LF TO REPLACE S/W AND INSTALL BACKFLOW | |
T02CM01845 | Withdrwn | 04/10/2002 | N/A | COMBO | REPLACE:CHILLER | |
T16RW02806 | Final | 11/18/2016 | 12/28/2016 | ROW | PARKING EQUIPMENT ON TYNDALL AVE TO LOAD ROOFING MATERIAL | |
T17RW01409 | Final | 03/29/2017 | 05/10/2017 | ROW | BARRICADING ON TYNDALL AVE TO CHANGE OUT COOLING TOWER AT ARIZONA HISTORICAL MUSEUM | |
T18RW03219 | Final | 07/24/2018 | 10/27/2018 | ROW | Starting on the South side of Arizona Student Ministries building at Cox Existing PED, trench/bore East for 230' Placing a 3x3x3 pothole for a NEW cox PED. from new PED trench /bore North for 180' Placing a 3x3x3 pothole for new Cox vault and intercept existing conduit, pull through existing conduit going east for 15' TO OUT OF ROW 09/14/18 CHANGE - Starting on the South side of Arizona Student Ministries building at Cox Existing PED, trench/bore East for 230' Placing a 3x3x3 pothole for a NEW Vault. from new Vault trench /bore North for 180' then East 5' Placing a 3x3x3 pothole for new vault ,intercept existing conduit, pull through existing conduit going east for 10' TO OUT OF ROW | |
T18RW04405 | Final | 10/02/2018 | 11/09/2018 | ROW | Equipment and material stagging to load roof at work location. Requires closure of west bound lane of 2nd Street between Park Ave. & Tyndall Ave. Also, associated parking stalls. ONE DAY OPERATION ON 10/10/18. | |
T19RW01523 | Final | 03/21/2019 | 05/24/2019 | ROW | Starting on the east side of 2nd Street and Tyndall Avenue trench/bore going west 60' and place vault. | |
T20RW03391 | Final | 06/15/2020 | 07/19/2020 | ROW | B&F CONTRACTING WILL BE INSTALLING OF 8" CIPP LINING, TRAFFIC CONTROL TO BE A TYPICAL FLAGMAN CLOSURES, B&F WILL ALSO BE PERFORMING MANHOLE REHAB WORK, NO EXCAVATIONS AT THIS LOCATION | |
T20RW04147 | Final | 07/17/2020 | 08/26/2020 | ROW | FULL CLOSURE STARTING AT 3AM | |
T20RW04378 | Final | 07/30/2020 | 10/02/2020 | ROW | MAINGATE PHASE V MIXED, DP16-0026 FULL STREET CLOSURE OF 2ND ST BETWEEN TYNDALL AV AND PARK AV FOR COMPLETION OF WORK. APPROVED TNE ATTACHED. Throughout July second shift 8pm - Sunrise Sundays August 2nd, 9th, 16th, 23rd, 30th | |
T20RW05043 | Final | 09/15/2020 | 10/16/2020 | ROW | JOB ORDER CONTRACT FOR TRAFFIC SIGNAL AND STREET LIGHT CONSTRUCTION, CONTRACT NO. 181906-02 REPLACE DAMAGED LIGHT POLE AT PARK AV/2ND ST BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 48-HOURS PRIOR TO START OF WORK FOR COORDINATION. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. MAINTAIN PEDESTRIAN ACCESS. 09/23/2020 - AFTER THE FACT PERMIT - WORK COMPLETE | |
T21RW02627 | Final | 05/28/2021 | 08/15/2021 | ROW | Set up crane to remove cooling towers from the roof of the Marshall bldg, and set new towers on roof. SET-UP DATES: JULY 16, 2021 THROUGH JULY 18, 2021 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. | |
T21RW05066 | Final | 11/22/2021 | 12/23/2021 | ROW | JOB ORDER CONTRACT FOR TRAFFIC SIGNAL AND STREET LIGHT CONSTRUCTION, CONTRACT NO. 181906-02 NEXT GENERATION WILL BE INSTALLING NEW ELECTRICAL PVC CONDUIT. THE CURRENT CONDUIT IS DAMAGED AND NEEDS TO BE REPAIRED ASAP. FLAGGERS WILL BE DIRECTING TRAFFIC AND PEDESTRIAN WALKWAY WILL BE AVAILABLE. THIS WORK IS AN EMERGENCY FOR THE COT DTM. OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP. | |
T98PL01945 | Expired | 10/09/1998 | 04/19/1999 | PLUMB | GAS LINE:REPAIR | |
T99EX00944 | Closed | 08/12/1999 | 10/11/1999 | EXCAV | EXCAV:100LF OF SIDEWALK |