Permit Details

Status:
Final
Type:
Barricade and Excavation
Address:
949 E 2ND ST
Address NEW:
949 E 2ND ST
Apply Date:
07/24/2018
Applicant:
COX COMMUNICATIONS
Description:
Starting on the South side of Arizona Student Ministries building at Cox Existing PED, trench/bore East for 230' Placing a 3x3x3 pothole for a NEW cox PED. from new PED trench /bore North for 180' Placing a 3x3x3 pothole for new Cox vault and intercept existing conduit, pull through existing conduit going east for 15' TO OUT OF ROW 09/14/18 CHANGE - Starting on the South side of Arizona Student Ministries building at Cox Existing PED, trench/bore East for 230' Placing a 3x3x3 pothole for a NEW Vault. from new Vault trench /bore North for 180' then East 5' Placing a 3x3x3 pothole for new vault ,intercept existing conduit, pull through existing conduit going east for 10' TO OUT OF ROW
Contractors:
  • ALPHA UNDERGROUND CONSTRUCTION CO INC *APA
  • FLASH IT BARRICADES LLC
  • TRUENET COMMUNICATIONS CORP

Completed Inspections

Permit Status: Final
Permit Number: T18RW03219
Permit Description: Starting on the South side of Arizona Student Ministries building at Cox Existing PED, trench/bore East for 230' Placing a 3x3x3 pothole for a NEW cox PED. from new PED trench /bore North for 180' Placing a 3x3x3 pothole for new Cox vault and intercept existing conduit, pull through existing conduit going east for 15' TO OUT OF ROW 09/14/18 CHANGE - Starting on the South side of Arizona Student Ministries building at Cox Existing PED, trench/bore East for 230' Placing a 3x3x3 pothole for a NEW Vault. from new Vault trench /bore North for 180' then East 5' Placing a 3x3x3 pothole for new vault ,intercept existing conduit, pull through existing conduit going east for 10' TO OUT OF ROW
Total Completed Inspections - 1
Date Description Inspector Results Comments
11/09/2018 TDOT-EXCAV GENERAL INSPECTION MVV Approved Appears completed.