Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Parcel Search: 120077250
Parcel Search
Annexations & Original City Zoning (OCZ)
Date - 11/24/2024 2:14 a.m.
Total Number Of OZC Plans - (1)
Special Development Requests & Requirements
Date - 11/24/2024 2:14 a.m.
Total Number Of Special Development Permits - (1)
Activity Number | Status | Apply Date | Expired Date | Type | Description |
---|---|---|---|---|---|
H000004280 | Closed | N/A |
Permits
Parcel Number - 120077250
Date - 11/24/2024 2:14 a.m.
Total Number Of Permits - (6)
Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T06OT00235 | Final | 01/27/2006 | 12/10/2006 | SIGN | 10510 | |
T06OT00236 | Expired | 01/27/2006 | 12/09/2006 | SIGN | 10509 | |
T06OT00257 | Final | 01/30/2006 | 01/30/2007 | SIGN | 10524 | |
T10OT00070 | Void | 01/12/2010 | N/A | SITE | 17767 | |
T10OT00071 | Final | 01/12/2010 | 08/29/2010 | SIGN | 17767 | |
T16EX01538 | Final | 04/28/2016 | 06/28/2016 | EXCAV | ISSAP ATLAS 0068 (104 LOCATIONS) - ABANDON/REPLACE/TIE OVER GAS LINES AT VARIOUS LOCATIONS. SEE ATTACHED SPREADSHEET FOR LOCATIONS. TCP - INTERIOR: ALL 1 DAY WORK WITHIN APPROVED TIME ON ANNUAL BLANKET PERMIT. T15TC01632 NO ARTERIAL STREETS FOR TC PER CONTRACTOR |
Code Enforcement
Parcel Number - 120077250
Date - 11/24/2024 2:14 a.m.
Total Number Of Code Cases - 1
Case Number | Case Status | Entered Date | Closed Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T04VL00845 | Complian | 12/21/2004 | 01/12/2006 | CODEVIOL | COMPLAINT: SIGN, NO PERMITS |
Plans
Parcel Number - 120077250
Date - 11/24/2024 2:14 a.m.
Total Number Of Plans - 1
Plan Number | Plan Status | Application Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TP-PRE-0424-00107 | Complete | 04/24/2024 | N/A | Pre-Application | We own 3 lots, and we want to build a strip commercial building using our 3 lots. We've designed an architectural proposal for your revision. Before we develop the whole project, we want to be sure that our proposal is feasible. With your recommendation, we will improve the project, and we will start working with the engineer for the calculation. |