Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Address Search: 4107 S 12TH AV
Search
Annexations & Original City Zoning (OCZ)
Address: 4107 S 12TH AV
Date - 11/21/2024 9:40 p.m.
Total Number Of Annexations & Original City Zoning (1)
Special Development Requests & Requirements
Address: 4107 S 12TH AV
Date - 11/21/2024 9:40 p.m.
Total Number Of Special Development Permits - (1)
Activity Number | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
H000004280 | CLOSED | 09/25/2012 | N/A | Historical Information |
Permits
Address: 4107 S 12TH AV
Date - 11/21/2024 9:40 p.m.
Total Number Of Permits - (7)
Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T06OT00235 | FINAL | 01/27/2006 | 12/10/2006 | SIGN | 10510 | |
T06OT00236 | EXPIRED | 01/27/2006 | 12/09/2006 | SIGN | 10509 | |
T06OT00257 | FINAL | 01/30/2006 | 01/30/2007 | SIGN | 10524 | |
T10OT00070 | VOID | 01/12/2010 | N/A | SITE | 17767 | |
T10OT00071 | FINAL | 01/12/2010 | 08/29/2010 | SIGN | 17767 | |
T16EX01538 | FINAL | 04/28/2016 | 06/28/2016 | EXCAV | ISSAP ATLAS 0068 (104 LOCATIONS) - ABANDON/REPLACE/TIE OVER GAS LINES AT VARIOUS LOCATIONS. SEE ATTACHED SPREADSHEET FOR LOCATIONS. TCP - INTERIOR: ALL 1 DAY WORK WITHIN APPROVED TIME ON ANNUAL BLANKET PERMIT. T15TC01632 NO ARTERIAL STREETS FOR TC PER CONTRACTOR | |
T16TC01064 | EXPIRED | 05/02/2016 | N/A | BARRICAD | ISSAP ATLAS 0068 (104 LOCATIONS) - ABANDON/REPLACE/TIE OVER GAS LINES AT VARIOUS LOCATIONS. SEE ATTACHED SPREADSHEET FOR LOCATIONS. |
Plans
Address: 4107 S 12TH AV
Date - 11/21/2024 9:40 p.m.
Total Number Of Plans - (1)
Plan Number | Status | Application Date | Exp Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TP-PRE-0424-00107 | Complete | 04/24/2024 | N/A | -- Pre-Application Conference | We own 3 lots, and we want to build a strip commercial building using our 3 lots. We've designed an architectural proposal for your revision. Before we develop the whole project, we want to be sure that our proposal is feasible. With your recommendation, we will improve the project, and we will start working with the engineer for the calculation. |