Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Parcel Search
 
Parcel Attributes
Parcel120075740
JurisdictionTucson, Pima County
City of Tucson ZoningR-2
Tucson WardWard 1
Tucson Registered NeighborhoodNational City Northwest
Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Date - 11/12/2026 8:17 p.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-60-39 West To Silverbell Road And South To San Xavier Indian Reservation 2014 03/18/1960 2045

Permits

Parcel Number - 120075740
Date - 11/12/2026 8:17 p.m.
Total Number Of Permits - (3)
Permit Permit Status Entered Date Expired Date Unit Type Description
TR-UTL-0925-01606 Complete 09/19/2025 01/08/2026 Right-of-Way (ROW) - Utility P.169120C KAHNA PLACE 4380' OF AERIAL FIBER CABLE
T20RW01210 Final 02/27/2020 03/28/2020 ROW PROP 101 ROAD RECOVERY PROJECT 5 ASPHALT CORING AT 20 LOCATIONS ON RESIDENTIAL STREETS BOUND BY IRVINGTON RD, 12TH AVE, AJO WAY, AND 6TH AVE. MAP ATTACHED. CORING WILL CLOSE ONE SIDE OF THE STREET AT EACH LOCATION FOR ABOUT 30 MINUTES. CORES WILL BE PATCHED WITH HOT ASPHALT UPON COMPLETION. SHALLOW SOIL SAMPLES WILL BE TAKEN FROM EACH CORE LOCATION NOT EXCEEDING 18 INCHES BELOW PAVEMENT SURFACE.
T21RW01786 Final 04/15/2021 05/26/2021 ROW JACKING PIT FOR BORE BEGINNING AT 526 W MICHIGAN DR AND ENDING IN MICHIGAN DR ON THE WEST SIDE OF 12TH AVENUE. Excavation work that will be occurring in Michigan Street east of 12th Avenue for a jacking pit that will be used for a jack-and-bore crossing of 12th Avenue. This is for preliminary work that will tentatively begin the week of April 12, 2021 to support a new Tucson Water pipeline that will be constructed during the summer. The pipeline work is scheduled to begin around June 1, 2021, and we will submit subsequent applications for additional work as we near that date and have our design completed. Tucson Water has also been conducting outreach to nearby residents, TUSD, businesses, and other entities that will affected by the construction. ** Michigan Dr may be under a pavement moratorium, (FY20 Local Streets Package 5) any new asphalt that is disturbed will require a 2" mill and overlay for 50’ in each direction from the outside of the cut for all effected travel lanes. Inspector to advise of moratorium conditions. ADDITIONAL CONDITIONS: REFER TO RECORD DRAWING I-2000-024 FOR THE MEDIAN ISLAND CONSTRUCTION DETAILS. 05/18/2021 - PLAN ADD AFTER THE FACT - R1 NIGHT WORK COMPLETED ON 05/06/2021 WITH APPROVED TNE PRIOR TO PERMIT BEING UPDATED: Relocation of an existing water service line that interrupts our bore pit. Will need to cut and dig asphalt to remove existing water service line and connect and install a temporary water service line.