Address Search: 526 W MICHIGAN DR
Search
Parcel Attributes
| Parcel | 120075740 |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | R-2 |
| Tucson Ward | Ward 1 |
| Tucson Registered Neighborhood | National City Northwest |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Address: 526 W MICHIGAN DR
Date - 11/12/2026 8:17 p.m.
Total Number Of Annexations & Original City Zoning (1)
Permits
Address: 526 W MICHIGAN DR
Date - 11/12/2026 8:17 p.m.
Total Number Of Permits - (3)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TR-UTL-0925-01606 | Complete | 09/19/2025 | 01/08/2026 | Right-of-Way (ROW) - Utility | P.169120C KAHNA PLACE 4380' OF AERIAL FIBER CABLE | |
| T20RW01210 | FINAL | 02/27/2020 | 03/28/2020 | ROW | PROP 101 ROAD RECOVERY PROJECT 5 ASPHALT CORING AT 20 LOCATIONS ON RESIDENTIAL STREETS BOUND BY IRVINGTON RD, 12TH AVE, AJO WAY, AND 6TH AVE. MAP ATTACHED. CORING WILL CLOSE ONE SIDE OF THE STREET AT EACH LOCATION FOR ABOUT 30 MINUTES. CORES WILL BE PATCHED WITH HOT ASPHALT UPON COMPLETION. SHALLOW SOIL SAMPLES WILL BE TAKEN FROM EACH CORE LOCATION NOT EXCEEDING 18 INCHES BELOW PAVEMENT SURFACE. | |
| T21RW01786 | FINAL | 04/15/2021 | 05/26/2021 | ROW | JACKING PIT FOR BORE BEGINNING AT 526 W MICHIGAN DR AND ENDING IN MICHIGAN DR ON THE WEST SIDE OF 12TH AVENUE. Excavation work that will be occurring in Michigan Street east of 12th Avenue for a jacking pit that will be used for a jack-and-bore crossing of 12th Avenue. This is for preliminary work that will tentatively begin the week of April 12, 2021 to support a new Tucson Water pipeline that will be constructed during the summer. The pipeline work is scheduled to begin around June 1, 2021, and we will submit subsequent applications for additional work as we near that date and have our design completed. Tucson Water has also been conducting outreach to nearby residents, TUSD, businesses, and other entities that will affected by the construction. ** Michigan Dr may be under a pavement moratorium, (FY20 Local Streets Package 5) any new asphalt that is disturbed will require a 2" mill and overlay for 50’ in each direction from the outside of the cut for all effected travel lanes. Inspector to advise of moratorium conditions. ADDITIONAL CONDITIONS: REFER TO RECORD DRAWING I-2000-024 FOR THE MEDIAN ISLAND CONSTRUCTION DETAILS. 05/18/2021 - PLAN ADD AFTER THE FACT - R1 NIGHT WORK COMPLETED ON 05/06/2021 WITH APPROVED TNE PRIOR TO PERMIT BEING UPDATED: Relocation of an existing water service line that interrupts our bore pit. Will need to cut and dig asphalt to remove existing water service line and connect and install a temporary water service line. |