Parcel Search: 11811015M
Parcel Search
Parcel Attributes
| Parcel | 11811015M |
|---|---|
| Jurisdiction | Tucson, Pima County |
| Water Course | Wash |
| City of Tucson Zoning | I-1 |
| Tucson Ward | Ward 1 |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Address | |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Date - 08/17/2026 2:48 p.m.
Total Number Of OZC Plans - (1)
Special Development Requests & Requirements
Date - 08/17/2026 2:48 p.m.
Total Number Of Special Development Permits - (2)
| Activity Number | Status | Apply Date | Expired Date | Type | Description |
|---|---|---|---|---|---|
| T18SA00437 | Complete | N/A | |||
| T19SA00448 | Complete | N/A | ZONING LETTER |
Permits
Parcel Number - 11811015M
Date - 08/17/2026 2:48 p.m.
Total Number Of Permits - (6)
| Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TR-ROW-0126-00017 | Complete | 01/09/2026 | 05/31/2026 | Right-of-Way (ROW) | Proposed work in ROW for electrical conduit connection along W Silverlake and S Fiandaca. | |
| TC-COM-0726-01095 | Needs resubmittal | 07/14/2026 | N/A | Commercial Building | Installation of (20) Level 3 electric vehicle chargers. Electrical distribution equipment consisting of panel boards and step-down transformers will be fed from a new electrical service fed from a utility owned 1500KVA medium voltage transformer. Proposed building square footage is 0sf Limit of disturbance area: 1.8 acres | |
| TD-DEV-0725-00187 | Approved - awaiting customer attention | 07/15/2025 | N/A | Development Package | Proposed parking lot revisions to accommodate EV chargers and larger parking stalls. The proposed work includes trench and directional boring for electrical and telecom conduits, repaving, milling and restriping. Landscape islands will be relocated. Limited grading is proposed as the proposed lot will largely match the existing grading conditions with minor tweaks to ensure rainwater harvesting at the landscape islands. | |
| TE-FPU-0725-00281 | Issued | 07/15/2025 | N/A | Floodplain Use | The proposed work includes parking lot revisions to accommodate EV chargers and larger parking stalls. The proposed work includes trenching and directional boring for electrical and telecom conduits, repaving, milling, and restriping. Landscape island will be relocated. Overall, the impervious cover on this parcel will decrease by around 1,000 SF. Limited grading/earthwork is proposed on this lot. The new pavement will largely match the existing grades with minor tweaks to ensure rainwater harvesting at the new landscape island location. This is being done in conjunction with work on the east side of S Fiandaca, which includes EV charger and Automated Vehicle Inspection building construction. | |
| TC-COM-1025-01905 | Withdrawn | 10/15/2025 | N/A | Commercial Building | Installation of new electric vehicle charging stations on existing parking lot locations | |
| T19RW01361 | Final | 03/15/2019 | 05/18/2019 | ROW | DIG 4 PITS TO PLACE NEW POLES AND REMOVE EXISTING PEDS. |
Plans
Parcel Number - 11811015M
Date - 08/17/2026 2:48 p.m.
Total Number Of Plans - 7
| Plan Number | Plan Status | Application Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| T19BA00026 | Submitted | 07/10/2019 | N/A | Basin | Retention/Detention Basin 6 | |
| T19BA00027 | Submitted | 07/10/2019 | N/A | Basin | Underground Detention System | |
| T19BA00028 | Submitted | 07/10/2019 | N/A | Basin | Retention/Detention Basin 7 | |
| TC-BCA-0126-00007 | Complete | 01/30/2026 | N/A | Appeal - Building Official | Electrical service cannot be located on a separate non-contiguous parcel. Each non-contiguous parcel will require separate electrical services. | |
| TP-PRE-0325-00050 | Complete | 03/19/2025 | N/A | Pre-Application | Work for the proposed development shall include reconfiguration of parking lots for installation of EV chargers and construction of an 1,800 S.F. Automated Vehicle Inspection (AVI) building. Site improvements include re-striping of a parking lot, trenching and pavement repair, associated earthwork, and utility connections. | |
| TP-PRE-0325-00051 | Void | 03/19/2025 | N/A | Pre-Application | *void* please refer to TP-PRE-0325-00050 // Work for the proposed development shall include reconfiguration of parking lots for installation of EV chargers and construction of an 1,800 S.F. Automated Vehicle Inspection (AVI) building. Site improvements include re-striping of a parking lot, trenching and pavement repair, associated earthwork, and utility connections. | |
| TR-PUR-1225-00003 | In review | 12/18/2025 | 12/17/2028 | Public Utility Review | Proposed electrical connection from west parking lot (11811015M) to east parking lot (11811015L) across S Fiandaca Blvd. Crossing is approximately at the northern driveway of each parcel. Power is for proposed EV chargers. |