Address Search: 780 W EL PUENTE LN
Search
Parcel Attributes
| Parcel | 11811015M |
|---|---|
| Jurisdiction | Tucson, Pima County |
| Water Course | Wash |
| City of Tucson Zoning | I-1 |
| Tucson Ward | Ward 1 |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Address: 780 W EL PUENTE LN
Date - 08/20/2026 8:22 a.m.
Total Number Of Annexations & Original City Zoning (1)
Permits
Address: 780 W EL PUENTE LN
Date - 08/20/2026 8:22 a.m.
Total Number Of Permits - (5)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TC-COM-1025-01905 | Withdrawn | 10/15/2025 | N/A | Commercial Building | Installation of new electric vehicle charging stations on existing parking lot locations | |
| TD-DEV-0725-00187 | Approved - Awaiting Customer Attention | 07/15/2025 | N/A | Development Package | Proposed parking lot revisions to accommodate EV chargers and larger parking stalls. The proposed work includes trench and directional boring for electrical and telecom conduits, repaving, milling and restriping. Landscape islands will be relocated. Limited grading is proposed as the proposed lot will largely match the existing grading conditions with minor tweaks to ensure rainwater harvesting at the landscape islands. | |
| TE-FPU-0725-00281 | Issued | 07/15/2025 | N/A | Floodplain Use | The proposed work includes parking lot revisions to accommodate EV chargers and larger parking stalls. The proposed work includes trenching and directional boring for electrical and telecom conduits, repaving, milling, and restriping. Landscape island will be relocated. Overall, the impervious cover on this parcel will decrease by around 1,000 SF. Limited grading/earthwork is proposed on this lot. The new pavement will largely match the existing grades with minor tweaks to ensure rainwater harvesting at the new landscape island location. This is being done in conjunction with work on the east side of S Fiandaca, which includes EV charger and Automated Vehicle Inspection building construction. | |
| TC-COM-0726-01095 | Needs Resubmittal | 07/14/2026 | N/A | Commercial Building | Installation of (20) Level 3 electric vehicle chargers. Electrical distribution equipment consisting of panel boards and step-down transformers will be fed from a new electrical service fed from a utility owned 1500KVA medium voltage transformer. Proposed building square footage is 0sf Limit of disturbance area: 1.8 acres | |
| TR-ROW-0126-00017 | Complete | 01/09/2026 | 05/31/2026 | Right-of-Way (ROW) | Proposed work in ROW for electrical conduit connection along W Silverlake and S Fiandaca. |
Plans
Address: 780 W EL PUENTE LN
Date - 08/20/2026 8:22 a.m.
Total Number Of Plans - (5)
| Plan Number | Status | Application Date | Exp Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| T19BA00026 | Submitted | 07/10/2019 | N/A | -- Stormwater Basin | Retention/Detention Basin 6 | |
| T19BA00027 | Submitted | 07/10/2019 | N/A | -- Stormwater Basin | Underground Detention System | |
| T19BA00028 | Submitted | 07/10/2019 | N/A | -- Stormwater Basin | Retention/Detention Basin 7 | |
| TC-BCA-0126-00007 | Complete | 01/30/2026 | N/A | -- Building Code Appeal | Electrical service cannot be located on a separate non-contiguous parcel. Each non-contiguous parcel will require separate electrical services. | |
| TR-PUR-1225-00003 | In Review | 12/18/2025 | 12/17/2028 | -- Public Utility Review | Proposed electrical connection from west parking lot (11811015M) to east parking lot (11811015L) across S Fiandaca Blvd. Crossing is approximately at the northern driveway of each parcel. Power is for proposed EV chargers. |