Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Parcel Search: 117200110
Parcel Search
Parcel Attributes
Parcel | 117200110 |
---|---|
Jurisdiction | Tucson |
City of Tucson Zoning | O-3 |
Tucson Ward | Ward 1 |
Tucson Downtown Incentive Zone | Downtown Core, Downtown Infill Incentive District |
Rio Nuevo Downtown | Rio Nuevo - Downtown |
Rio Nuevo Multipurpose Facilities District | Yes |
Tucson Registered Neighborhood | Downtown |
Redevelopment | Downtown Redevelopment District |
Structure on National Register of Historic Places | Individually Listed |
Pima County Data | Assessor, Recorder, Treasurer, ... |
Parcel Map | Map |
Address |
Annexations & Original City Zoning (OCZ)
Date - 11/23/2024 1:39 a.m.
Total Number Of OZC Plans - (1)
Plan | Description | Annexation Ordinance | Effective Date | OCZ Ordinance |
---|---|---|---|---|
Original Town Of Tucson | ORIGINAL | 08/07/1877 | None |
Permits
Parcel Number - 117200110
Date - 11/23/2024 1:39 a.m.
Total Number Of Permits - (86)
Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TF-FOP-0223-00539 | Complete | 02/20/2023 | 04/16/2023 | UNIT 200 | Fire Operational Permit | El Rio Vecinos Block Party/charity fundraiser Event will feature live music, DJ, Casino and food sampling from 20+ restaurants and multiple beverage vendors. "Rain or Shine" event. Tickets and sponsorships are sold in advance, not day of event. Proceeds of the event will benefit El Rio's Peer Health Navigator Initiative. Increasing teen's access to healthcare in the community. |
T21RW00889 | Complete | 02/24/2021 | 06/26/2022 | Right-of-Way (ROW) | REMOVE AND REPLACING ASPHALT AND CONCRETE STRUCTURES, PLEASE SEE PLANS.NOTE: PROJECT WILL NOT TA; Work Order: 24872 | |
TR-ROW-0323-00515 | Complete | 03/20/2023 | 04/16/2023 | UNIT 200 | Right-of-Way (ROW) | The Vecinos Block Party charity fundraising event Set up will begin at 5 am and tear down will occur after the party ends at 11 pm through 5 am on Sunday, April 16. Southwest Barricades will be handling our requested road closures and |
TF-FOP-0423-00857 | Complete | 04/11/2023 | 04/23/2024 | Fire Operational Permit | 20'x80' and 10' x 100' anchored by water barrels | |
TF-FOP-0423-00861 | Void | 04/11/2023 | N/A | Fire Operational Permit | VOID-RESUBMITTED ON PERMIT#TF-FOP-0423-00857-add on to previous application 10'x60' with water barrels and sidewalls | |
TR-ROW-0523-00783 | Complete | 05/18/2023 | 10/21/2023 | Right-of-Way (ROW) | Dig new 6'D X 30" wide foundation remove existing Street light and place on new foundation. Replace 2 existing pullboxes. Remove concrete edge wing and replace top same grade. Replace existing brick sidewalk as needed.*** | |
TR-ROW-0623-00884 | Complete | 06/20/2023 | 08/09/2023 | Right-of-Way (ROW) | Monitor well abandonment. 12"x12" saw cut to remove vault from Pennington then repair roadway according to PAG Type 1 street repair. | |
TR-ROW-0723-00924 | Complete | 07/04/2023 | 10/16/2023 | Right-of-Way (ROW) | Street closures for the 50th annual Tucson Meet Yourself festival. Tues 10/10: set-up 6pm Wed 10/11: set-up 6pm Fri 10/13: set-up 6pm Sun 10/15: take-down 11:30pm | |
T22RW02666 | Complete | 07/26/2022 | 09/28/2022 | Right-of-Way (ROW) | RELOCATE HISTORIC STREET LIGHT POLE CURRENTLY LOCATED ON THE NORTHWEST CORNER OF CHURCH AV / PENNING; Work Order: TA24872.01 | |
TR-ROW-0924-01037 | Complete | 09/11/2024 | 10/07/2024 | Right-of-Way (ROW) | Tucson Meet Yourself - Event takes place on Jacome Plaza and the surrounding streets. Traffic control set up and take down: 10/1/24, 6pm is first closure. Next closure is 10/2/24, 6pm. Final closure is 10/4/24, 6pm and lasts through 10/6/24. | |
TR-UTL-1222-00535 | Complete | 12/29/2022 | 10/23/2023 | Right-of-Way (ROW) - Utility | Cox to Pull 4748' through Existing conduit and Overlash 2321' to existing aerial for system tie. | |
T21RW05422 | Approved | 12/30/2021 | N/A | Right-of-Way (ROW) | Replace existing handi-cap ramp North west corner Church and Pennington 1.INGRESS/ EGRESS FOR; Work Order: TA24872.01 | |
T16EX00582 | Final | 02/26/2016 | 05/02/2016 | EXCAV | INSTALL TWO 4' X 1' X 1' CONCRETE FOOTERS. REINSTALL RED BRICK PLEASE CONTACT PARK TUCSON AT 791-5071; THIS IS A PERMIT AREA. This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Jonathan Mabry, Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Contact Jonathan Mabry at 520-837-6968 or jonathan.mabry@tucsonaz.gov with any questions. | |
T16EX01766 | Final | 05/09/2016 | 07/08/2016 | EXCAV | Geotechnical boring (vertical) at one (1) location on Church Avenue with soil sampling to a depth of 3 feet between Alameda St and Pennington St. 409 BOND PROJECT FY17 | |
T16RW01098 | Expired | 08/17/2016 | 01/19/2017 | ROW | PLACE A ROLL OFF DUMPSTER IN LEFT TURN BAY ON PENNINGTON ST. PIMA COUNTY OLD COURT HOUSE INTERIOR DEMOLITION( XOCHRT ) SOLICIATION # 221728 *** PLEASE CONTACT PARK TUCSON AT 791-5071. THIS IS A PERMIT AREA. *** PLEASE BE ADVISED IF COMPLAINTS RECEIVED TRAFFIC CONTROL SHALL HAVE TO BE TAKEN DOWN @ 4:00 PM 10/26/2016-R1 EB LTL ONTO NORTH CHURCH AV-COMPLETE DURATION OF JOB | |
T16TC00469 | Final | 02/26/2016 | N/A | BARRICAD | INSTALL TWO 4' X 1' X 1' CONCRETE FOOTERS. REINSTALL RED BRICK | |
T16TC01139 | Expired | 05/09/2016 | N/A | BARRICAD | Geotechnical boring (vertical) at one (1) location on Church Avenue with soil sampling to a depth of 3 feet between Alameda St and Pennington St. 409 BOND PROJECT FY17 | |
T17RW04097 | Final | 09/15/2017 | 10/29/2017 | ROW | GET MOVING TUCSON - STONE/PENNINGTON TO ST MARY'S TO I10, SILVERBELL TO CONGRESS, COVERING A MAJORITY OF DOWNTOWN. | |
T17RW04454 | Expired | 10/09/2017 | 11/10/2017 | ROW | 20 LF FRONT ASPHALT TO RENEW WATER SERVICE | |
T17RW05349 | Final | 12/01/2017 | 12/09/2017 | ROW | BARRICADES TO STAGE CRAN AND PIPE DELIVERY TRUCK INTO TURN LANE OF PENNINGTON ST. LIFT PIPE FROM TRUCK INTO BASEMENT OF 115 N CHURCH | |
T18FC00492 | Withdrwn | 06/12/2018 | N/A | FIRECONS | REPLACEMENT OF EXISTING FIRE ALARM SYSTEM @ THE PIMA COUNTY HISTORIC COURTHOUSE. | |
T18FO00310 | Final | 04/19/2018 | 10/31/2018 | FIREOPER | 33RD ANNUAL TUCSON FOLK FESTIVAL 5 TENTS SETUP DATE 5/4/18 | |
T18RW01851 | Expired | 04/24/2018 | 05/27/2018 | ROW | CONCRETE PUMPING | |
T18RW01922 | Final | 04/27/2018 | 05/28/2018 | ROW | CLOSING A LANE OF TRAFFIC ON CHURCH TO HOIST HVAC EQUIPMENT ONTO THE ROOF | |
T18RW02531 | Final | 06/06/2018 | 08/25/2018 | ROW | 1807476 & 1807476 8lf front of address in asphalt to Renew 2" galvanized service and replace fire protection valve | |
T18RW02624 | Expired | 06/12/2018 | 08/13/2018 | ROW | CONCRETE PUMPING | |
T18RW03186 | Void | 07/23/2018 | N/A | ROW | DAYTIME PAVEMENT PATCH & NIGHTIME SIDEWALK CLOSURE FOR POURING . | |
T18RW03881 | Final | 08/29/2018 | 01/01/2019 | ROW | Job requires access to MH #1362 to splice existing fibers. Barricade only. | |
T18RW04045 | Final | 09/10/2018 | 10/17/2018 | ROW | 6 LF IN ASPHALT TO REPLACE WATER VALVE IN THE MIDDLE OF THE INTERSECTION NOTE: WEEKEND WORK ONLY. DO NOT RESTRICT ACCESS TO THE PARKING GARAGE DURING NORMAL OPERATION. | |
T18RW04173 | Final | 09/18/2018 | 10/19/2018 | ROW | 55 TON CRANE TO SET AIR HANDLERS INSIDE PENTHOUSE OF BUILDING LOCATED AT 115 N CHURCH (OLD PIMA COUNTY COURTHOUSE). | |
T18RW04543 | Final | 10/08/2018 | N/A | ROW | GET MOVING TUCSON - STONE/PENNINGTON TO ST MARY'S TO I10, SILVERBELL TO CONGRESS, COVERING A MAJORITY OF DOWNTOWN. | |
T18RW04619 | Final | 10/12/2018 | 05/13/2019 | ROW | PARK TRUCK TO PUMP CONCRETE INTO BUILDING 12/14/2018-PLAN CHANGE MOVING FURNITURE INTO NEW BUILDING 01/17/19 - 24 HR CLOSURE ON PENNINGTON. | |
T18RW04629 | Final | 10/12/2018 | 11/14/2018 | ROW | CITY OF TUCSON MEDIAN PALM CARE, PASEO REDONDO AND GRANADA FROM ALAMEDA TO CONGRESS | |
T19FC01041 | Final | 12/11/2019 | 06/23/2020 | FIRECONS | removal of one 2,000 gallon bare steel underground storage tank | |
T19RW01838 | Final | 04/08/2019 | 05/08/2019 | ROW | LANE CLOSURE TO REMOVE DIRT FROM PLANTERS | |
T19RW02299 | Final | 04/25/2019 | 05/29/2019 | ROW | UNLOAD TRUCKS- NO EXCAVATION | |
T19RW03088 | Final | 05/31/2019 | 07/03/2019 | ROW | TRUCK UNLOADING | |
T19RW03134 | Final | 06/04/2019 | 08/04/2019 | ROW | ACCESSING MH #1362 TO SPLICE FIBER | |
T19RW03236 | Final | 06/10/2019 | 08/05/2019 | ROW | PALM TREE TRIMMING | |
T19RW03300 | Final | 06/12/2019 | 08/11/2019 | ROW | NEED ACCESS TO UNDERGROUND PULL BOX/VAULT, NEED LANE CLOSURE (ALAMEDA PORTION) | |
T19RW03301 | Final | 06/12/2019 | 08/11/2019 | ROW | NEED ACCESS TO UNDERGROUND PULL BOX/VAULT, NEED LANE CLOSURE (PENNINGTON PORTION) | |
T19RW03327 | Final | 06/12/2019 | 07/17/2019 | ROW | EXCAVATION AND BORING TO INSTALL UG FIBER OPTICS CABLE | |
T19RW03785 | Final | 07/08/2019 | 08/09/2019 | ROW | NEED ACCESS TO UNDERGROUND PULL BOX/VAULT, NEED LANE CLOSURE CONTRACTOR SHALL COORDINATE WORK W/CONTRACTORS WORKING IN THE AREA | |
T19RW03823 | Final | 07/09/2019 | 08/09/2019 | ROW | CRANE LIFT | |
T19RW04163 | Final | 07/29/2019 | 09/06/2019 | ROW | PERFORM A VERTICAL BORING TO AN APPOXIMATE DEPTH OF 10 FEET BELOW EXISTING GRADE. THE BORE HOLE WILL BE APPROXIMATELY 7 INCHES IN DIAMETER. THE LOCATION OF THE BORING WILL BE APPROXIMATELY 5 FEET NORTH OF THE CURB ADJACENT TO PENNINGTON STREET (see site plan for details). DUE TO THE POTENTIAL FOR UNDERGROUND UTILITIES INTERFERING WITH OUR BORING AN ALTERNATIVE BORING LOATION IS IN THE STREET, APPRIMATELY 4 FEET SOUTH OF THE CURB. WORK WILL TAKE APPROXIMATELY 1 HOUR TO COMPLETE. | |
T19RW05374 | Final | 09/18/2019 | 11/17/2019 | ROW | STARTING AT COX VAULT ON THE NORTH SIDE OF W CONGRESS ST AND EAST OF W PENNINGTON ST PULL THUR EXISTING 350' GOING WEST CONTINUE 155' GOING NORTH THEN 105' GOING WEST TO COX VAULT. 11/01/2019: Adding 4 - 3X3 potholes will add 12' of Trench/bore. NOTES: This street is under a pavement moratorium, any new asphalt that is disturbed will require a 2" mill and overlay for 50' in each direction from the outside of the cut for all effected travel lanes. This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Allison Diehl at allison.diehl@tucsonaz.gov with any questions. | |
T19RW05580 | Final | 09/24/2019 | 01/01/2020 | ROW | CRANE LIFT A NOTICE OF TEMPORARYHOLIDAY RESTRICTION APPLIES TO THIS PERMIT AND WILL BE IN EFFECT FROM THANKSGIVING DAY TO JANUARY 2. DUE TO THE INCREASING TRAFFIC VOLUME ON MANY OF THE CITY'S ROADS, IT IS NECESSARY TO RESTRICT LANE CLOSURES ON CERTAIN ROADS DURING THE HOLIDAY SEASON 10/18/2019-PLAN CHANGE: THIS IS FOR A ONE DAY WORK; DEC. 2, 2019 HOUR- 3AM-2PM DISPLAY CASE DELIVERY 11/26/19 - PLAN CHANGE: ADDING ONE DAY CLOSURE FOR CONCRETE POUR ON 11/27/19 FROM 4AM - 4PM | |
T19RW05825 | Final | 10/02/2019 | 12/01/2019 | ROW | ACCESS TO MH#1362 TO PLACE NEW FIBER BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 FOR COORDINATION. A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from Thanksgiving Day to January 2. Due to the increasing traffic volume on many of the City's roads, it is necessary to restrict lane closures on certain roads during the holiday season. | |
T19RW05960 | Final | 10/09/2019 | 10/28/2019 | ROW | LONG-STANDING CHARITY RUN/WALK WITHA A 13.1 MILE HALF MARATHON, A 5K AND A 1-MILE KIDS RUN. JUMPING CASTLES, LIVE MUSIC, FOOD TRUCKS, STAGED IN JACOME PLAZA ADDRESS ON APPLICATION- STAGING, DOWNTOWN, JACOME PLAZA WITH ROUTES THROUGHOUT DOWNTOWN, A-MOUNTAIN ETC. | |
T19RW06261 | Final | 10/18/2019 | 10/21/2019 | ROW | SET UP FOR DROP OFF/LOADING FOR EVENT | |
T19RW06333 | Final | 10/21/2019 | 11/22/2019 | ROW | PLACE LIFT IN STREET TO LOAD SUPPLIES INTO BUILDING | |
T19RW06505 | Final | 10/25/2019 | 06/23/2021 | ROW | TWO STREET-SIDE BANNERS ON LIGHT POLES DIRECTLY IN FRONT OF THE HISTORIC COUNTY COURTHOUSE ALONG WESTSIDE OF CHURCH AV, BETWEEN ALAMEDA & PENNINGTON R1 PLAN CHANGE: CHANGE EXISTING BANNER TO "COMING SOON" R2 PLAN CHANGE: TWO BANNER DESIGNS: FOR VISITOR CENTER AND UA GEM & MINERAL MUSEUM. ADDED ADDITIONAL BANNERS ON THE SAME BLOCK. COVERED UNDER THE INITAL FEE DUE TO PLACEMENT ON THE SAME BLOCK. | |
T19RW06843 | Final | 11/06/2019 | 12/06/2019 | ROW | REMOVE CONCRETE SIDEWALK AND INSTALL NEW BUILDING WATER SERVICE FROM PREVIOUSLY INSTALLED WATER SERVICE STUB, FROM CURB TO SITE (APPROX. 12 SQ.FEET) SIDEWALK CLOSURE ONLY YOU MAY NEED TO COORDINATE WITH OTHER CONTRACTORS THAT ARE WORKING IN THE SAME AREA. | |
T19RW07274 | Final | 11/27/2019 | 12/03/2019 | ROW | ONE DAY PARKING ON DECEMBER 02, 2019 TO UNLOAD TRUCKS FOR THE PIMA COUNTY COURTHOUSE. RESTRICTIONS WILL BE ON ALAMEDA ST NOTE: LEAVE RIGHT TURN LANE ACCESSIBLE TO VEHICULAR TRAFFIC AND PEDESTRIANS. | |
T19RW07276 | Final | 11/27/2019 | 12/17/2019 | ROW | ONE DAY PARKING ON DECEMBER 16, 2019 TO UNLOAD TRUCKS FOR THE PIMA COUNTY COURTHOUSE. RESTRICTIONS WILL BE ON ALAMEDA ST NOTE: LEAVE RIGHT TURN LANE ACCESSIBLE TO VEHICULAR TRAFFIC AND PEDESTRIANS. | |
T19RW07659 | Final | 12/20/2019 | 12/24/2019 | ROW | PARKING TO UNLOAD TRUCKS. | |
T19RW07748 | Final | 12/30/2019 | 12/31/2020 | ROW | LOADING AND UNLOADING OF MATERIALS. | |
T19RW07765 | Final | 12/30/2019 | 01/11/2020 | ROW | LOADING AND UNLOADING OF MATERIALS. | |
T19RW07795 | Final | 12/31/2019 | 01/30/2020 | ROW | LOADING AND UNLOADING OF MATERIALS NOTES: BUS STOP IN AREA, YOU WILL HAVE TO NOTIFY SUNTRAN 24 HOURS PRIOR TO WORK SUN TRAN CONTACTS: BEA PAULUS 520-206-8826 CHRISTINA ROCK 520-206-8934 DUE TO HOLIDAY RESTRICTION (GEM SHOW) NO WORK CAN BE DONE AT ALL BEGINNING JANUARY 31, 2020 - FEBUARY 16, 2020. | |
T20RW00068 | Final | 01/07/2020 | 03/07/2020 | ROW | Starting at Cox vault on the North side of W Congress St and East of Pennington St pull thru existing 350' going West Continue 155' going North then 105' going West to Cox Vault, adding 4-3x3 potholes will add 12' of trench/bore. NOTES: This street is under a pavement moratorium, any new asphalt that is disturbed will require a 2" mill and overlay for 50' in each direction from the outside of the cut for all effected travel lanes. This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Allison Diehl at allison.diehl@tucsonaz.gov with any questions. BUS STOP IN AREA, YOU WILL HAVE TO NOTIFY SUNTRAN 24 HOURS PRIOR TO WORK SUN TRAN CONTACTS: BEA PAULUS 520-206-8826 CHRISTINA ROCK 520-206-8934 CONTRACTOR SHALL NOT SET UP TRAFFFIC CONTROL PRIOR TO 9:00 AM AND TRAFFIC COTROL SHELL BE REMOVED PRIOR TO 3:30 PM DUE TO HOLIDAY RESTRICTION (GEM SHOW) NO WORK SHELL BE DONE BETWEEN JANUARY 31, 2020 - FEBUARY 16, 2020. | |
T20RW00414 | Final | 01/23/2020 | 01/16/2020 | ROW | LOADING AND UNLOADING OF MATERIALS. | |
T20RW00835 | Final | 02/10/2020 | 02/12/2020 | ROW | LOADING AND UNLOADING OF MATERIALS | |
T20RW01376 | Final | 03/03/2020 | 06/05/2020 | ROW | N.434309 - JOB WILL REQUIRE ACCESS TO MH #1362 TO SPLICE AND PLACE FIBER | |
T20RW01400 | Final | 03/03/2020 | 02/28/2021 | ROW | LANE AND SIDEWALK CLOSURE - West side of Church (right lane only) starting at Alameda and continuing South on Church to the crosswalk in front of Pima County Historic Courthouse. This lane and sidewalk closure permit are requested for Tuesday's and Wednesday's from (9:00AM-3:30PM) 6:00AM-2:30PM through April 30, 2020. Lloyd Construction will have subcontractors loading and unloading materials. If there are no deliveries scheduled on these days there will be no barricades. Pedestrian crosswalks on the Southwest corner of Church and Alameda will be permanently closed for the duration of this permit. Signage rerouting pedestrian paths will remain until permit is closed. Lloyd Construction Company is responsible for the sidewalk closure on the east side of the courthouse/southbound Church. Please see attached pedestrian reroute diagram. OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP. BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 FOR COORDINATION. 08/05/2020 - CHANGE IN DAYS OF WORK, MONDAY - FRIDAY - R5 | |
T20RW02397 | Final | 04/28/2020 | 05/28/2020 | ROW | TRANSPORTATION & MOBILITY SIGN SHOP WILL BE REPLACING STREET NAME SIGNS (TWO-SIDED) ON EACH OF THE FOUR OVERHEAD TRAFFIC SIGNAL MAST ARMS. | |
T20RW03590 | Final | 06/24/2020 | 07/02/2021 | ROW | installing cable in underground vaults, need lane closure This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions. | |
T20RW03785 | Final | 07/06/2020 | 11/08/2020 | ROW | As part of the January 8th Memorial project, TEP is requesting that the County relocate existing TEP infrastructure underneath the new memorial at El Persidio Plaza to Church Ave. Contractor will connect into two separate existing TEP manholes. ADDING FUTURE USE CONDUIT FOR TEP. Decorative crosswalks to be replaced. Maintain pedestrian and bus access Contact the inspector for a preconstruction meeting before work begins. Work at night will require a temporary noise exemption Pavement replacement shall be for the full width of the lane(s) disturbed This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions. R1 PLAN CHANGE/RENEWAL - 30 DAY RENEWAL AND BARRICADE COMPANY CHANGED TO BORDER TRAFFIC 10/05/2020 - PLAN CHANGE/RENEWAL - 30 DAYS RENEWAL AND BARRICADE COMPANY CHANGED TO NBC. NIGHTWORK FOR 10/10/2020 PER APPROVED TNE. | |
T20RW04851 | Final | 09/01/2020 | 01/31/2022 | ROW | APPROXIMATELY 156 STREET POLE BANNERS FOR DOWNTOWN REOPENING MARKETING CAMPAIGN IN PARTNERSHIP WITH PIMA COUNTY BACK-TO-BUSINESS INITIATIVE. PLEASE REFER TO MAP FOR STRETCHES OF STREET BANNERS WILL BE INSTALLED AND THE NUMBER OF POLES (BANNERS) ON EACH STRETCH. "WELCOME BACK" "READY FOR YOU" "HOLA - LISTO PARA SERVIR" "CLEAN & SAFE" WITH "DOWNTOWNTUCSON.ORG" AND DTP LOGO TO LEAD PEOPLE TO A LISTING OF OPEN BUSINESSES DOWNTOWN WHO HAVE BEEN CERTIFIED BY THE PC HEALTH DEPT. AS 'READY FOR YOU.' BANNERS TO BE INSTALLED BY DTP ON A SUNDAY/MONDAY EARLY MORNING 4AM-7AM. A SEPARATE TRACK ACCESS APPLICATION WILL BE SUBMITTED TO SUN LINK. POWER DOWN OF STREETCAR OCS LINE WILL BE REQUESTED FOR BANNERS BEING INSTALLED ON CONGRESS AND BROADWAY FOR TIME(S) AFTER THE STREETCAR IS NON-OPERATIONAL. RUSS STONE, MAINTENANCE AND SAFETY SUPERVISOR (520-940-0806) WILL PERFORM INSTALL WITH USE OF DTP BUCKET TRUCK. CITY OF TUCSON NOT RESPONSIBLE FOR REPLACEMENT OF BRACKETS NOR BANNERS MOUNTED ON ANY CITY LIGHT POLES DAMAGED OR REMOVED BY WEATHER OR VEHICLE MAINTAIN BANNERS IN GOOD CONDITION, CHECK AFTER SEVERE WEATHER. REPLACE AS NECESSARY WITH PERMISSION FROM TDOT. SHALL PROVIDE FLAGGERS, KEEP PEDESTRIAN WALKWAYS SAFE, INSTALL DURING NON BUSINESS HOURS AND REPAIR ANY DAMAGE THEY CAUSE. SHALL COORDINATE WITH SUNLINK PRIOR TO STARTNG WORK CHURCH AVE BETWEEN ALAMEDA AND PENNINGTON AVE (7 BANNERS) | |
T20RW04992 | Final | 09/11/2020 | 10/30/2020 | ROW | 20R2403 - REPAIR MAIN AND VALVE IN THE INTERSECTION OF N CHURCH AVE & W PENNINGTON ST @ 20 LF IN THE ASPHALT. OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP. EMERGENCY - AFTER THE FACT PERMIT | |
T20RW05945 | Final | 10/30/2020 | 12/04/2020 | ROW | REMOVE AND REPLACE ASPHALT AND CONCRETE @ 30 LF WEST OF THE INTERSECTION OF CHURCH AV AND PENNINGTON ST. APPROVED TNE FOR THE NIGHTS OF November 4th Through November 7th FROM 6:00 PM TO 6:00 AM. | |
T20RW06618 | Final | 12/23/2020 | 06/13/2021 | ROW | SCAFFOLDING INSTALLATION AROUND BUILDING | |
T20RW06656 | Withdrwn | 12/30/2020 | N/A | ROW | ROW IMPROVEMENTS ALONG W ALAMEDA ST, N CHURCH AV, & W PENNINGTON ST INCLUDING SIDEWALK, DROP-OFF ACCESS & DUMPSTER ENCLOSURES. | |
T21FC00180 | Withdrwn | 03/04/2021 | N/A | FIRECONS | TIE IN OF NEW FIRE ALARM DEVICES INTO EXISTING SYSTEM | |
T21FO00636 | Final | 09/22/2021 | 04/26/2022 | FIREOPER | United Way Event - Donor Recognition and 100 Year Kick Off Private Event on 10/27/21 at 6pm | |
T21RW00915 | Final | 02/25/2021 | 06/30/2021 | ROW | PARTIAL LANE CLOSURE ON PENNINGTON ST FOR WATERPROOFING ON THE COURTHOUSE. SHALL COORDINATE WITH TRAFFIC CONTROL AND CONTRACTORS IN THE AREA | |
T21RW00981 | Final | 03/02/2021 | 06/06/2021 | ROW | LANE CLOSURE FOR LOADING AND UNLOADING TRUCKS AS NEEDED. | |
T21RW01085 | Final | 03/09/2021 | 05/15/2021 | ROW | PARTIAL CLOSURE OF SIDEWALK WHICH STILL ENABLES PEDESTRIAN USE. INSTALLATION OF FENCING ON CHURCH AVE SOUTH SECTION. | |
T21RW01216 | Final | 03/16/2021 | 06/22/2021 | ROW | LANE CLOSURE ON PENNINGTON ST FOR DUMPSTER PLACEMENT OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP | |
T21RW02774 | Final | 06/07/2021 | 08/21/2021 | ROW | EAST OF 115 N CHURCH AV., PLACE 3x3 POTHOLE TO REPAIR DAMAGED CONDUIT. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP. BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. | |
T21RW03447 | Final | 07/22/2021 | 12/24/2021 | ROW | 24 HOUR RIGHT LANE CLOSURE FOR STORING HAUL OFF MATERIAL AND TO LOAD TRUCKS . PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. 09/23/2021 - ALL EQUIPMENT WILL BE REMOVED FOR ANY UPCOMING SPECIAL EVENTS. | |
T21RW03457 | Final | 07/23/2021 | 09/02/2021 | ROW | PLACE CRANE ON PENNINGTON TO LIFT EQUIPMENT AND MATERIALS IN & OUT OF COURTYARD INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. MAINTAIN PEDESTRIAN ACCESS | |
T21RW04993 | Final | 11/12/2021 | 12/14/2021 | ROW | UNLOADING (1) 24FT TRUCK, (3) 16FT TRUCKS, (2) CARGO VANS - ALONG THE SOUTHSIDE OF ALAMEDA ST WEST OF N COURT AV FOR FILMING CREW. VEHICLES WILL BE SWAPPING SPACE DURING THE UNLOADING AND LOADING PHASES THROUGHOUT THE DAY. DO NOT BLOCK ACCESS TO THE EL PRESIDIO PUBLIC GARAGE. DO NOT BLOCK CROSSWALK. DO NOT BLOCK SIDEWALK. MAINTAIN PEDESTRIAN ACCESS. | |
T22FO00158 | Final | 02/16/2022 | 08/22/2022 | FIREOPER | ORNAMENTAL IRON FENCE ON THE SOUTH WEST CORNER OF CHURCH AVE AND ALAMEDA ABOUT 1" INSIDE THE SIDEWALK. CUTTING AND WELDING MISC STEEL RAILS AND PCIEKTS TOGETHER TO ERECT THE FENCE. | |
T22RW00339 | Final | 02/02/2022 | 05/09/2022 | ROW | Boring through existing pavement for asphalt and soils evaluation @ 1 location along Church Ave. between Alameda and Pennington. Total depth of 8" auger to depth of 5.0'. (Location on attached map.) ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. IS UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 50’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions. WORK IS BEHIND 115 N CHURCH AV - ADDRESS ON PERMIT IS FOR PERMITTING PURPOSES ONLY ADDRESS ON APPLICATION- Church Ave.: Alameda to Pennington ARTERIAL/COLLECTOR STREET 1. BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 24-HOURS PRIOR TO START OF WORK FOR COORDINATION. 2. PLACE "BUSINESS ACCESS" SIGNS APPROPRIATELY. SEVERAL BUSINESSES ALONG ROUTE. 3. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 4. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. 5. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. 6. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.) 7. ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE. 8. REPLACE/ REFRESH ALL STRIPING THAT IS INTERRUPTED BY PATCHES. 9. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. 10. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. 11. MAINTAIN PEDESTRIAN ACCESS 12. MAINTAIN ACCESS TO BUS STOPS AND FOR PEDESTRIAN INGRESS/ EGRESS. 13. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. IF WEEKEND WORK, MAKE CONTACT 48 HOURS PRIOR TO THE WEEKEND. DAN ROBERTSON- 520-400-6722 OR TOM ADKINS- 520-400-3813 | |
T22RW01714 | Final | 05/03/2022 | 06/13/2022 | ROW | PLACE LIFT ON SIDEWALK TO PAINT FRONT OF BUILDING THIS PROJECT IS LOCATED IN AN ARCHAEOLOGICAL SENSITIVITY ZONE. AN ARCHAEOLOGICAL MONITOR HIRED BY THE PERMIT APPLICANT IS REQUIRED TO BE ON-SITE DURING ANY DIGGING, UNLESS A WAIVER IS ISSUED. MONITORING REPORTS ARE TO BE SUBMITTED TO HISTORIC PRESERVATION OFFICE, CITY OF TUCSON, P.O. BOX 27210, TUCSON, AZ 85726.** PLEASE CONTACT JODIE BROWN AT JODIE.BROWN@TUCSONAZ.GOV WITH ANY QUESTIONS. BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. | |
T22RW02158 | Final | 06/14/2022 | 07/23/2022 | ROW | CLOSE EB LEFT LANE ON PENNINGTON TO PLACE LIFT TO PAINT SIDE OF BUILDING |
Code Enforcement
Parcel Number - 117200110
Date - 11/23/2024 1:39 a.m.
Total Number Of Code Cases - 1
Case Number | Case Status | Entered Date | Closed Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T17DV02086 | Cancel | 05/18/2017 | N/A | DNR_VIOL | open wiring for panal box for irridation susystem |