Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Search

Parcel Attributes
Parcel117200110
JurisdictionTucson
City of Tucson ZoningO-3
Tucson WardWard 1
Tucson Downtown Incentive ZoneDowntown Infill Incentive District, Downtown Core
Rio Nuevo DowntownRio Nuevo - Downtown
Rio Nuevo Multipurpose Facilities DistrictYes
Tucson Registered NeighborhoodDowntown
RedevelopmentDowntown Redevelopment District
Structure on National Register of Historic Places

Individually Listed

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map

Historic Records Requests

Address: 115 N CHURCH AV
Date - 11/23/2024 5:33 a.m.
Total Number Of Historic Records Requests - (1)
Name Action
Address: 115 N CHURCH AV - Doc Type: DOCUMENTS VIEW

Annexations & Original City Zoning (OCZ)

Address: 115 N CHURCH AV
Date - 11/23/2024 5:33 a.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
Original Town Of Tucson ORIGINAL None

Permits

Address: 115 N CHURCH AV
Date - 11/23/2024 5:33 a.m.
Total Number Of Permits - (90)
Permit Status Apply Date Expired Date Unit Type Description
T21RW05422 Approved 12/30/2021 N/A Right-of-Way (ROW) Replace existing handi-cap ramp North west corner Church and Pennington 1.INGRESS/ EGRESS FOR; Work Order: TA24872.01
TR-UTL-1222-00535 Complete 12/29/2022 10/23/2023 Right-of-Way (ROW) - Utility Cox to Pull 4748' through Existing conduit and Overlash 2321' to existing aerial for system tie.
TR-ROW-0924-01037 Complete 09/11/2024 10/07/2024 Right-of-Way (ROW) Tucson Meet Yourself - Event takes place on Jacome Plaza and the surrounding streets. Traffic control set up and take down: 10/1/24, 6pm is first closure. Next closure is 10/2/24, 6pm. Final closure is 10/4/24, 6pm and lasts through 10/6/24.
T22RW02666 Complete 07/26/2022 09/28/2022 Right-of-Way (ROW) RELOCATE HISTORIC STREET LIGHT POLE CURRENTLY LOCATED ON THE NORTHWEST CORNER OF CHURCH AV / PENNING; Work Order: TA24872.01
TR-ROW-0723-00924 Complete 07/04/2023 10/16/2023 Right-of-Way (ROW) Street closures for the 50th annual Tucson Meet Yourself festival. Tues 10/10: set-up 6pm Wed 10/11: set-up 6pm Fri 10/13: set-up 6pm Sun 10/15: take-down 11:30pm
TR-ROW-0523-00783 Complete 05/18/2023 10/21/2023 Right-of-Way (ROW) Dig new 6'D X 30" wide foundation remove existing Street light and place on new foundation. Replace 2 existing pullboxes. Remove concrete edge wing and replace top same grade. Replace existing brick sidewalk as needed.***
TF-FOP-0423-00857 Complete 04/11/2023 04/23/2024 Fire Operational Permit 20'x80' and 10' x 100' anchored by water barrels
TF-FOP-0423-00861 Void 04/11/2023 N/A Fire Operational Permit VOID-RESUBMITTED ON PERMIT#TF-FOP-0423-00857-add on to previous application 10'x60' with water barrels and sidewalls
TR-ROW-0323-00515 Complete 03/20/2023 04/16/2023 UNIT 200 Right-of-Way (ROW) The Vecinos Block Party charity fundraising event Set up will begin at 5 am and tear down will occur after the party ends at 11 pm through 5 am on Sunday, April 16. Southwest Barricades will be handling our requested road closures and
T21RW00889 Complete 02/24/2021 06/26/2022 Right-of-Way (ROW) REMOVE AND REPLACING ASPHALT AND CONCRETE STRUCTURES, PLEASE SEE PLANS.NOTE: PROJECT WILL NOT TA; Work Order: 24872
TF-FOP-0223-00539 Complete 02/20/2023 04/16/2023 UNIT 200 Fire Operational Permit El Rio Vecinos Block Party/charity fundraiser Event will feature live music, DJ, Casino and food sampling from 20+ restaurants and multiple beverage vendors. "Rain or Shine" event. Tickets and sponsorships are sold in advance, not day of event. Proceeds of the event will benefit El Rio's Peer Health Navigator Initiative. Increasing teen's access to healthcare in the community.
T01EX01372 CLOSED 11/26/2001 01/25/2002 EXCAV EXCAV:TRENCHING FOR FIBRE OPTIC
T15TC02657 EXPIRED 11/24/2015 N/A BARRICAD SIDEWALK CLOSURE FOR PALM TREE TRIMMING
T16EX00582 FINAL 02/26/2016 05/02/2016 EXCAV INSTALL TWO 4' X 1' X 1' CONCRETE FOOTERS. REINSTALL RED BRICK PLEASE CONTACT PARK TUCSON AT 791-5071; THIS IS A PERMIT AREA. This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Jonathan Mabry, Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Contact Jonathan Mabry at 520-837-6968 or jonathan.mabry@tucsonaz.gov with any questions.
T16EX01766 FINAL 05/09/2016 07/08/2016 EXCAV Geotechnical boring (vertical) at one (1) location on Church Avenue with soil sampling to a depth of 3 feet between Alameda St and Pennington St. 409 BOND PROJECT FY17
T16RW01098 EXPIRED 08/17/2016 01/19/2017 ROW PLACE A ROLL OFF DUMPSTER IN LEFT TURN BAY ON PENNINGTON ST. PIMA COUNTY OLD COURT HOUSE INTERIOR DEMOLITION( XOCHRT ) SOLICIATION # 221728 *** PLEASE CONTACT PARK TUCSON AT 791-5071. THIS IS A PERMIT AREA. *** PLEASE BE ADVISED IF COMPLAINTS RECEIVED TRAFFIC CONTROL SHALL HAVE TO BE TAKEN DOWN @ 4:00 PM 10/26/2016-R1 EB LTL ONTO NORTH CHURCH AV-COMPLETE DURATION OF JOB
T16TC00469 FINAL 02/26/2016 N/A BARRICAD INSTALL TWO 4' X 1' X 1' CONCRETE FOOTERS. REINSTALL RED BRICK
T16TC00638 FINAL 03/14/2016 N/A BARRICAD THREE ROLL OFF DUMPSTERS WITHIN E/B LEFT TURN BAY FOR N/B ACCESS
T16TC00757 FINAL 03/25/2016 N/A BARRICAD GET MOVING TUCSON HALF-MARATHON EVENTS STAGING IS GOING TO TAKE PLACE AT 100 N CHURCH, JACOME PLAZA, BUT THE EVENT TAKES PLACE ON DOWNTOWN-AREA STREETS *** NO ALCOHOL CONSUMPTION IN THE RIGHT-OF-WAY ***
T16TC01139 EXPIRED 05/09/2016 N/A BARRICAD Geotechnical boring (vertical) at one (1) location on Church Avenue with soil sampling to a depth of 3 feet between Alameda St and Pennington St. 409 BOND PROJECT FY17
T17RW04097 FINAL 09/15/2017 10/29/2017 ROW GET MOVING TUCSON - STONE/PENNINGTON TO ST MARY'S TO I10, SILVERBELL TO CONGRESS, COVERING A MAJORITY OF DOWNTOWN.
T17RW04454 EXPIRED 10/09/2017 11/10/2017 ROW 20 LF FRONT ASPHALT TO RENEW WATER SERVICE
T17RW05349 FINAL 12/01/2017 12/09/2017 ROW BARRICADES TO STAGE CRAN AND PIPE DELIVERY TRUCK INTO TURN LANE OF PENNINGTON ST. LIFT PIPE FROM TRUCK INTO BASEMENT OF 115 N CHURCH
T18FC00492 WITHDRWN 06/12/2018 N/A FIRECONS REPLACEMENT OF EXISTING FIRE ALARM SYSTEM @ THE PIMA COUNTY HISTORIC COURTHOUSE.
T18FO00310 FINAL 04/19/2018 10/31/2018 FIREOPER 33RD ANNUAL TUCSON FOLK FESTIVAL 5 TENTS SETUP DATE 5/4/18
T18RW01851 EXPIRED 04/24/2018 05/27/2018 ROW CONCRETE PUMPING
T18RW01922 FINAL 04/27/2018 05/28/2018 ROW CLOSING A LANE OF TRAFFIC ON CHURCH TO HOIST HVAC EQUIPMENT ONTO THE ROOF
T18RW02531 FINAL 06/06/2018 08/25/2018 ROW 1807476 & 1807476 8lf front of address in asphalt to Renew 2" galvanized service and replace fire protection valve
T18RW02624 EXPIRED 06/12/2018 08/13/2018 ROW CONCRETE PUMPING
T18RW03186 VOID 07/23/2018 N/A ROW DAYTIME PAVEMENT PATCH & NIGHTIME SIDEWALK CLOSURE FOR POURING .
T18RW03881 FINAL 08/29/2018 01/01/2019 ROW Job requires access to MH #1362 to splice existing fibers. Barricade only.
T18RW04045 FINAL 09/10/2018 10/17/2018 ROW 6 LF IN ASPHALT TO REPLACE WATER VALVE IN THE MIDDLE OF THE INTERSECTION NOTE: WEEKEND WORK ONLY. DO NOT RESTRICT ACCESS TO THE PARKING GARAGE DURING NORMAL OPERATION.
T18RW04173 FINAL 09/18/2018 10/19/2018 ROW 55 TON CRANE TO SET AIR HANDLERS INSIDE PENTHOUSE OF BUILDING LOCATED AT 115 N CHURCH (OLD PIMA COUNTY COURTHOUSE).
T18RW04543 FINAL 10/08/2018 N/A ROW GET MOVING TUCSON - STONE/PENNINGTON TO ST MARY'S TO I10, SILVERBELL TO CONGRESS, COVERING A MAJORITY OF DOWNTOWN.
T18RW04619 FINAL 10/12/2018 05/13/2019 ROW PARK TRUCK TO PUMP CONCRETE INTO BUILDING 12/14/2018-PLAN CHANGE MOVING FURNITURE INTO NEW BUILDING 01/17/19 - 24 HR CLOSURE ON PENNINGTON.
T18RW04629 FINAL 10/12/2018 11/14/2018 ROW CITY OF TUCSON MEDIAN PALM CARE, PASEO REDONDO AND GRANADA FROM ALAMEDA TO CONGRESS
T18TC00002 VOID 09/18/2018 N/A BARRICAD 50 Ton Crane to set air handlers inside penthouse of building located at 115 N Church (Old PC Courthouse). Truck will be in the Curb lane and SB travel on Church, EB travel on Alameda and WB travel on Alameda will be impacted. Downtown area and ASZ area.
T19FC01041 FINAL 12/11/2019 06/23/2020 FIRECONS removal of one 2,000 gallon bare steel underground storage tank
T19RW01838 FINAL 04/08/2019 05/08/2019 ROW LANE CLOSURE TO REMOVE DIRT FROM PLANTERS
T19RW02299 FINAL 04/25/2019 05/29/2019 ROW UNLOAD TRUCKS- NO EXCAVATION
T19RW03088 FINAL 05/31/2019 07/03/2019 ROW TRUCK UNLOADING
T19RW03134 FINAL 06/04/2019 08/04/2019 ROW ACCESSING MH #1362 TO SPLICE FIBER
T19RW03236 FINAL 06/10/2019 08/05/2019 ROW PALM TREE TRIMMING
T19RW03300 FINAL 06/12/2019 08/11/2019 ROW NEED ACCESS TO UNDERGROUND PULL BOX/VAULT, NEED LANE CLOSURE (ALAMEDA PORTION)
T19RW03301 FINAL 06/12/2019 08/11/2019 ROW NEED ACCESS TO UNDERGROUND PULL BOX/VAULT, NEED LANE CLOSURE (PENNINGTON PORTION)
T19RW03327 FINAL 06/12/2019 07/17/2019 ROW EXCAVATION AND BORING TO INSTALL UG FIBER OPTICS CABLE
T19RW03785 FINAL 07/08/2019 08/09/2019 ROW NEED ACCESS TO UNDERGROUND PULL BOX/VAULT, NEED LANE CLOSURE CONTRACTOR SHALL COORDINATE WORK W/CONTRACTORS WORKING IN THE AREA
T19RW03823 FINAL 07/09/2019 08/09/2019 ROW CRANE LIFT
T19RW04163 FINAL 07/29/2019 09/06/2019 ROW PERFORM A VERTICAL BORING TO AN APPOXIMATE DEPTH OF 10 FEET BELOW EXISTING GRADE. THE BORE HOLE WILL BE APPROXIMATELY 7 INCHES IN DIAMETER. THE LOCATION OF THE BORING WILL BE APPROXIMATELY 5 FEET NORTH OF THE CURB ADJACENT TO PENNINGTON STREET (see site plan for details). DUE TO THE POTENTIAL FOR UNDERGROUND UTILITIES INTERFERING WITH OUR BORING AN ALTERNATIVE BORING LOATION IS IN THE STREET, APPRIMATELY 4 FEET SOUTH OF THE CURB. WORK WILL TAKE APPROXIMATELY 1 HOUR TO COMPLETE.
T19RW05374 FINAL 09/18/2019 11/17/2019 ROW STARTING AT COX VAULT ON THE NORTH SIDE OF W CONGRESS ST AND EAST OF W PENNINGTON ST PULL THUR EXISTING 350' GOING WEST CONTINUE 155' GOING NORTH THEN 105' GOING WEST TO COX VAULT. 11/01/2019: Adding 4 - 3X3 potholes will add 12' of Trench/bore. NOTES: This street is under a pavement moratorium, any new asphalt that is disturbed will require a 2" mill and overlay for 50' in each direction from the outside of the cut for all effected travel lanes. This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Allison Diehl at allison.diehl@tucsonaz.gov with any questions.
T19RW05580 FINAL 09/24/2019 01/01/2020 ROW CRANE LIFT A NOTICE OF TEMPORARYHOLIDAY RESTRICTION APPLIES TO THIS PERMIT AND WILL BE IN EFFECT FROM THANKSGIVING DAY TO JANUARY 2. DUE TO THE INCREASING TRAFFIC VOLUME ON MANY OF THE CITY'S ROADS, IT IS NECESSARY TO RESTRICT LANE CLOSURES ON CERTAIN ROADS DURING THE HOLIDAY SEASON 10/18/2019-PLAN CHANGE: THIS IS FOR A ONE DAY WORK; DEC. 2, 2019 HOUR- 3AM-2PM DISPLAY CASE DELIVERY 11/26/19 - PLAN CHANGE: ADDING ONE DAY CLOSURE FOR CONCRETE POUR ON 11/27/19 FROM 4AM - 4PM
T19RW05825 FINAL 10/02/2019 12/01/2019 ROW ACCESS TO MH#1362 TO PLACE NEW FIBER BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 FOR COORDINATION. A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from Thanksgiving Day to January 2. Due to the increasing traffic volume on many of the City's roads, it is necessary to restrict lane closures on certain roads during the holiday season.
T19RW05960 FINAL 10/09/2019 10/28/2019 ROW LONG-STANDING CHARITY RUN/WALK WITHA A 13.1 MILE HALF MARATHON, A 5K AND A 1-MILE KIDS RUN. JUMPING CASTLES, LIVE MUSIC, FOOD TRUCKS, STAGED IN JACOME PLAZA ADDRESS ON APPLICATION- STAGING, DOWNTOWN, JACOME PLAZA WITH ROUTES THROUGHOUT DOWNTOWN, A-MOUNTAIN ETC.
T19RW06261 FINAL 10/18/2019 10/21/2019 ROW SET UP FOR DROP OFF/LOADING FOR EVENT
T19RW06333 FINAL 10/21/2019 11/22/2019 ROW PLACE LIFT IN STREET TO LOAD SUPPLIES INTO BUILDING
T19RW06505 FINAL 10/25/2019 06/23/2021 ROW TWO STREET-SIDE BANNERS ON LIGHT POLES DIRECTLY IN FRONT OF THE HISTORIC COUNTY COURTHOUSE ALONG WESTSIDE OF CHURCH AV, BETWEEN ALAMEDA & PENNINGTON R1 PLAN CHANGE: CHANGE EXISTING BANNER TO "COMING SOON" R2 PLAN CHANGE: TWO BANNER DESIGNS: FOR VISITOR CENTER AND UA GEM & MINERAL MUSEUM. ADDED ADDITIONAL BANNERS ON THE SAME BLOCK. COVERED UNDER THE INITAL FEE DUE TO PLACEMENT ON THE SAME BLOCK.
T19RW06843 FINAL 11/06/2019 12/06/2019 ROW REMOVE CONCRETE SIDEWALK AND INSTALL NEW BUILDING WATER SERVICE FROM PREVIOUSLY INSTALLED WATER SERVICE STUB, FROM CURB TO SITE (APPROX. 12 SQ.FEET) SIDEWALK CLOSURE ONLY YOU MAY NEED TO COORDINATE WITH OTHER CONTRACTORS THAT ARE WORKING IN THE SAME AREA.
T19RW07274 FINAL 11/27/2019 12/03/2019 ROW ONE DAY PARKING ON DECEMBER 02, 2019 TO UNLOAD TRUCKS FOR THE PIMA COUNTY COURTHOUSE. RESTRICTIONS WILL BE ON ALAMEDA ST NOTE: LEAVE RIGHT TURN LANE ACCESSIBLE TO VEHICULAR TRAFFIC AND PEDESTRIANS.
T19RW07276 FINAL 11/27/2019 12/17/2019 ROW ONE DAY PARKING ON DECEMBER 16, 2019 TO UNLOAD TRUCKS FOR THE PIMA COUNTY COURTHOUSE. RESTRICTIONS WILL BE ON ALAMEDA ST NOTE: LEAVE RIGHT TURN LANE ACCESSIBLE TO VEHICULAR TRAFFIC AND PEDESTRIANS.
T19RW07659 FINAL 12/20/2019 12/24/2019 ROW PARKING TO UNLOAD TRUCKS.
T19RW07748 FINAL 12/30/2019 12/31/2020 ROW LOADING AND UNLOADING OF MATERIALS.
T19RW07765 FINAL 12/30/2019 01/11/2020 ROW LOADING AND UNLOADING OF MATERIALS.
T19RW07795 FINAL 12/31/2019 01/30/2020 ROW LOADING AND UNLOADING OF MATERIALS NOTES: BUS STOP IN AREA, YOU WILL HAVE TO NOTIFY SUNTRAN 24 HOURS PRIOR TO WORK SUN TRAN CONTACTS: BEA PAULUS 520-206-8826 CHRISTINA ROCK 520-206-8934 DUE TO HOLIDAY RESTRICTION (GEM SHOW) NO WORK CAN BE DONE AT ALL BEGINNING JANUARY 31, 2020 - FEBUARY 16, 2020.
T20RW00068 FINAL 01/07/2020 03/07/2020 ROW Starting at Cox vault on the North side of W Congress St and East of Pennington St pull thru existing 350' going West Continue 155' going North then 105' going West to Cox Vault, adding 4-3x3 potholes will add 12' of trench/bore. NOTES: This street is under a pavement moratorium, any new asphalt that is disturbed will require a 2" mill and overlay for 50' in each direction from the outside of the cut for all effected travel lanes. This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Allison Diehl at allison.diehl@tucsonaz.gov with any questions. BUS STOP IN AREA, YOU WILL HAVE TO NOTIFY SUNTRAN 24 HOURS PRIOR TO WORK SUN TRAN CONTACTS: BEA PAULUS 520-206-8826 CHRISTINA ROCK 520-206-8934 CONTRACTOR SHALL NOT SET UP TRAFFFIC CONTROL PRIOR TO 9:00 AM AND TRAFFIC COTROL SHELL BE REMOVED PRIOR TO 3:30 PM DUE TO HOLIDAY RESTRICTION (GEM SHOW) NO WORK SHELL BE DONE BETWEEN JANUARY 31, 2020 - FEBUARY 16, 2020.
T20RW00414 FINAL 01/23/2020 01/16/2020 ROW LOADING AND UNLOADING OF MATERIALS.
T20RW00835 FINAL 02/10/2020 02/12/2020 ROW LOADING AND UNLOADING OF MATERIALS
T20RW01376 FINAL 03/03/2020 06/05/2020 ROW N.434309 - JOB WILL REQUIRE ACCESS TO MH #1362 TO SPLICE AND PLACE FIBER
T20RW01400 FINAL 03/03/2020 02/28/2021 ROW LANE AND SIDEWALK CLOSURE - West side of Church (right lane only) starting at Alameda and continuing South on Church to the crosswalk in front of Pima County Historic Courthouse. This lane and sidewalk closure permit are requested for Tuesday's and Wednesday's from (9:00AM-3:30PM) 6:00AM-2:30PM through April 30, 2020. Lloyd Construction will have subcontractors loading and unloading materials. If there are no deliveries scheduled on these days there will be no barricades. Pedestrian crosswalks on the Southwest corner of Church and Alameda will be permanently closed for the duration of this permit. Signage rerouting pedestrian paths will remain until permit is closed. Lloyd Construction Company is responsible for the sidewalk closure on the east side of the courthouse/southbound Church. Please see attached pedestrian reroute diagram. OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP. BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 FOR COORDINATION. 08/05/2020 - CHANGE IN DAYS OF WORK, MONDAY - FRIDAY - R5
T20RW02397 FINAL 04/28/2020 05/28/2020 ROW TRANSPORTATION & MOBILITY SIGN SHOP WILL BE REPLACING STREET NAME SIGNS (TWO-SIDED) ON EACH OF THE FOUR OVERHEAD TRAFFIC SIGNAL MAST ARMS.
T20RW03590 FINAL 06/24/2020 07/02/2021 ROW installing cable in underground vaults, need lane closure This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions.
T20RW03785 FINAL 07/06/2020 11/08/2020 ROW As part of the January 8th Memorial project, TEP is requesting that the County relocate existing TEP infrastructure underneath the new memorial at El Persidio Plaza to Church Ave. Contractor will connect into two separate existing TEP manholes. ADDING FUTURE USE CONDUIT FOR TEP. Decorative crosswalks to be replaced. Maintain pedestrian and bus access Contact the inspector for a preconstruction meeting before work begins. Work at night will require a temporary noise exemption Pavement replacement shall be for the full width of the lane(s) disturbed This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions. R1 PLAN CHANGE/RENEWAL - 30 DAY RENEWAL AND BARRICADE COMPANY CHANGED TO BORDER TRAFFIC 10/05/2020 - PLAN CHANGE/RENEWAL - 30 DAYS RENEWAL AND BARRICADE COMPANY CHANGED TO NBC. NIGHTWORK FOR 10/10/2020 PER APPROVED TNE.
T20RW04851 FINAL 09/01/2020 01/31/2022 ROW APPROXIMATELY 156 STREET POLE BANNERS FOR DOWNTOWN REOPENING MARKETING CAMPAIGN IN PARTNERSHIP WITH PIMA COUNTY BACK-TO-BUSINESS INITIATIVE. PLEASE REFER TO MAP FOR STRETCHES OF STREET BANNERS WILL BE INSTALLED AND THE NUMBER OF POLES (BANNERS) ON EACH STRETCH. "WELCOME BACK" "READY FOR YOU" "HOLA - LISTO PARA SERVIR" "CLEAN & SAFE" WITH "DOWNTOWNTUCSON.ORG" AND DTP LOGO TO LEAD PEOPLE TO A LISTING OF OPEN BUSINESSES DOWNTOWN WHO HAVE BEEN CERTIFIED BY THE PC HEALTH DEPT. AS 'READY FOR YOU.' BANNERS TO BE INSTALLED BY DTP ON A SUNDAY/MONDAY EARLY MORNING 4AM-7AM. A SEPARATE TRACK ACCESS APPLICATION WILL BE SUBMITTED TO SUN LINK. POWER DOWN OF STREETCAR OCS LINE WILL BE REQUESTED FOR BANNERS BEING INSTALLED ON CONGRESS AND BROADWAY FOR TIME(S) AFTER THE STREETCAR IS NON-OPERATIONAL. RUSS STONE, MAINTENANCE AND SAFETY SUPERVISOR (520-940-0806) WILL PERFORM INSTALL WITH USE OF DTP BUCKET TRUCK. CITY OF TUCSON NOT RESPONSIBLE FOR REPLACEMENT OF BRACKETS NOR BANNERS MOUNTED ON ANY CITY LIGHT POLES DAMAGED OR REMOVED BY WEATHER OR VEHICLE MAINTAIN BANNERS IN GOOD CONDITION, CHECK AFTER SEVERE WEATHER. REPLACE AS NECESSARY WITH PERMISSION FROM TDOT. SHALL PROVIDE FLAGGERS, KEEP PEDESTRIAN WALKWAYS SAFE, INSTALL DURING NON BUSINESS HOURS AND REPAIR ANY DAMAGE THEY CAUSE. SHALL COORDINATE WITH SUNLINK PRIOR TO STARTNG WORK CHURCH AVE BETWEEN ALAMEDA AND PENNINGTON AVE (7 BANNERS)
T20RW04992 FINAL 09/11/2020 10/30/2020 ROW 20R2403 - REPAIR MAIN AND VALVE IN THE INTERSECTION OF N CHURCH AVE & W PENNINGTON ST @ 20 LF IN THE ASPHALT. OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP. EMERGENCY - AFTER THE FACT PERMIT
T20RW05945 FINAL 10/30/2020 12/04/2020 ROW REMOVE AND REPLACE ASPHALT AND CONCRETE @ 30 LF WEST OF THE INTERSECTION OF CHURCH AV AND PENNINGTON ST. APPROVED TNE FOR THE NIGHTS OF November 4th Through November 7th FROM 6:00 PM TO 6:00 AM.
T20RW06618 FINAL 12/23/2020 06/13/2021 ROW SCAFFOLDING INSTALLATION AROUND BUILDING
T20RW06656 WITHDRWN 12/30/2020 N/A ROW ROW IMPROVEMENTS ALONG W ALAMEDA ST, N CHURCH AV, & W PENNINGTON ST INCLUDING SIDEWALK, DROP-OFF ACCESS & DUMPSTER ENCLOSURES.
T21FC00180 WITHDRWN 03/04/2021 N/A FIRECONS TIE IN OF NEW FIRE ALARM DEVICES INTO EXISTING SYSTEM
T21FO00636 FINAL 09/22/2021 04/26/2022 FIREOPER United Way Event - Donor Recognition and 100 Year Kick Off Private Event on 10/27/21 at 6pm
T21RW00915 FINAL 02/25/2021 06/30/2021 ROW PARTIAL LANE CLOSURE ON PENNINGTON ST FOR WATERPROOFING ON THE COURTHOUSE. SHALL COORDINATE WITH TRAFFIC CONTROL AND CONTRACTORS IN THE AREA
T21RW00981 FINAL 03/02/2021 06/06/2021 ROW LANE CLOSURE FOR LOADING AND UNLOADING TRUCKS AS NEEDED.
T21RW01085 FINAL 03/09/2021 05/15/2021 ROW PARTIAL CLOSURE OF SIDEWALK WHICH STILL ENABLES PEDESTRIAN USE. INSTALLATION OF FENCING ON CHURCH AVE SOUTH SECTION.
T21RW01216 FINAL 03/16/2021 06/22/2021 ROW LANE CLOSURE ON PENNINGTON ST FOR DUMPSTER PLACEMENT OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP
T21RW02774 FINAL 06/07/2021 08/21/2021 ROW EAST OF 115 N CHURCH AV., PLACE 3x3 POTHOLE TO REPAIR DAMAGED CONDUIT. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP. BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
T21RW03447 FINAL 07/22/2021 12/24/2021 ROW 24 HOUR RIGHT LANE CLOSURE FOR STORING HAUL OFF MATERIAL AND TO LOAD TRUCKS . PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. 09/23/2021 - ALL EQUIPMENT WILL BE REMOVED FOR ANY UPCOMING SPECIAL EVENTS.
T21RW03457 FINAL 07/23/2021 09/02/2021 ROW PLACE CRANE ON PENNINGTON TO LIFT EQUIPMENT AND MATERIALS IN & OUT OF COURTYARD INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. MAINTAIN PEDESTRIAN ACCESS
T21RW04993 FINAL 11/12/2021 12/14/2021 ROW UNLOADING (1) 24FT TRUCK, (3) 16FT TRUCKS, (2) CARGO VANS - ALONG THE SOUTHSIDE OF ALAMEDA ST WEST OF N COURT AV FOR FILMING CREW. VEHICLES WILL BE SWAPPING SPACE DURING THE UNLOADING AND LOADING PHASES THROUGHOUT THE DAY. DO NOT BLOCK ACCESS TO THE EL PRESIDIO PUBLIC GARAGE. DO NOT BLOCK CROSSWALK. DO NOT BLOCK SIDEWALK. MAINTAIN PEDESTRIAN ACCESS.
T22FO00158 FINAL 02/16/2022 08/22/2022 FIREOPER ORNAMENTAL IRON FENCE ON THE SOUTH WEST CORNER OF CHURCH AVE AND ALAMEDA ABOUT 1" INSIDE THE SIDEWALK. CUTTING AND WELDING MISC STEEL RAILS AND PCIEKTS TOGETHER TO ERECT THE FENCE.
T22RW00339 FINAL 02/02/2022 05/09/2022 ROW Boring through existing pavement for asphalt and soils evaluation @ 1 location along Church Ave. between Alameda and Pennington. Total depth of 8" auger to depth of 5.0'. (Location on attached map.) ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. IS UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 50’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions. WORK IS BEHIND 115 N CHURCH AV - ADDRESS ON PERMIT IS FOR PERMITTING PURPOSES ONLY ADDRESS ON APPLICATION- Church Ave.: Alameda to Pennington ARTERIAL/COLLECTOR STREET 1. BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 24-HOURS PRIOR TO START OF WORK FOR COORDINATION. 2. PLACE "BUSINESS ACCESS" SIGNS APPROPRIATELY. SEVERAL BUSINESSES ALONG ROUTE. 3. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 4. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. 5. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. 6. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.) 7. ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE. 8. REPLACE/ REFRESH ALL STRIPING THAT IS INTERRUPTED BY PATCHES. 9. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. 10. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. 11. MAINTAIN PEDESTRIAN ACCESS 12. MAINTAIN ACCESS TO BUS STOPS AND FOR PEDESTRIAN INGRESS/ EGRESS. 13. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. IF WEEKEND WORK, MAKE CONTACT 48 HOURS PRIOR TO THE WEEKEND. DAN ROBERTSON- 520-400-6722 OR TOM ADKINS- 520-400-3813
T22RW01714 FINAL 05/03/2022 06/13/2022 ROW PLACE LIFT ON SIDEWALK TO PAINT FRONT OF BUILDING THIS PROJECT IS LOCATED IN AN ARCHAEOLOGICAL SENSITIVITY ZONE. AN ARCHAEOLOGICAL MONITOR HIRED BY THE PERMIT APPLICANT IS REQUIRED TO BE ON-SITE DURING ANY DIGGING, UNLESS A WAIVER IS ISSUED. MONITORING REPORTS ARE TO BE SUBMITTED TO HISTORIC PRESERVATION OFFICE, CITY OF TUCSON, P.O. BOX 27210, TUCSON, AZ 85726.** PLEASE CONTACT JODIE BROWN AT JODIE.BROWN@TUCSONAZ.GOV WITH ANY QUESTIONS. BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
T22RW02158 FINAL 06/14/2022 07/23/2022 ROW CLOSE EB LEFT LANE ON PENNINGTON TO PLACE LIFT TO PAINT SIDE OF BUILDING

Record Requests

Address: 115 N CHURCH AV
Date - 11/23/2024 5:33 a.m.
Total Number Of Requests - (1)
Request Number Status Request Date Completed Date Type Description
REQ-0723-03792 Complete 07/11/2023 07/19/2023 Requests 90 day Extension Request: Cox to Pull 4748' through Existing conduit and Overlash 2321' to existing aerial for system tie.