Parcel Search: 11717020A
Parcel Search
Parcel Attributes
| Parcel | 11717020A |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | C-3 |
| Tucson Ward | Ward 6 |
| Tucson Downtown Incentive Zone | Downtown Infill Incentive District, Downtown Core |
| Rio Nuevo Downtown | Rio Nuevo - Downtown |
| Rio Nuevo Multipurpose Facilities District | Yes |
| Redevelopment | Downtown Redevelopment District |
| Tucson Registered Neighborhood | Armory Park |
| Major Street & Route | Gateway Route |
| National Register Historic District | Downtown Tucson Historic District |
| Structure on National Register of Historic Places | Contributor |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Addresses | |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Date - 08/17/2026 3:30 a.m.
Total Number Of OZC Plans - (1)
| Plan | Description | Annexation Ordinance | Effective Date | OCZ Ordinance |
|---|---|---|---|---|
| Original Town Of Tucson | ORIGINAL | 08/07/1877 |
Special Development Requests & Requirements
Date - 08/17/2026 3:30 a.m.
Total Number Of Special Development Permits - (2)
| Activity Number | Status | Apply Date | Expired Date | Type | Description |
|---|---|---|---|---|---|
| H000000217 | Closed | N/A | |||
| H000000219 | Closed | N/A |
Permits
Parcel Number - 11717020A
Date - 08/17/2026 3:30 a.m.
Total Number Of Permits - (11)
| Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TF-FOP-1122-00077 | Complete | 11/16/2022 | N/A | Fire Operational Permit | 12-31-22 Cassandra Gelt AA 1 20' x 60' Clear Canopy with a 20' x 20' Clear Canopy Attached w/ 165' of 8' High Sidewall Clear w/ Water Barrels | |
| TF-FOP-1224-01537 | Complete | 12/26/2024 | 01/02/2025 | Fire Operational Permit | Stillwell House Kelly Knipe - Tent 1 - 20' x 60' x 8' H Clear Canopy w/ 1 - 20' x 20' x 8' H Clear Canopy | |
| T16RW00595 | Expired | 07/18/2016 | 08/17/2016 | ROW | EXCAVATE TO REPLACE WATER SERVICE LINE. WILL REQUIRE HARD CLOSURE OF 5TH AVE FROM BROADWAY TO 12TH ST WORK ORDER # 16011218 | |
| T16RW01913 | Final | 10/07/2016 | 11/10/2016 | ROW | EXCAVATE TO REPLACE WATER SERVICE LINE. WILL REQUIRE HARD CLOSURE OF 5TH AVE FROM BROADWAY BL TO 12TH ST. | |
| T17RW01752 | Final | 04/24/2017 | 04/26/2017 | ROW | BISHOP KICANAS 50TH ANNIVERSARY CELEBRATION | |
| T17RW05095 | Final | 11/16/2017 | 11/30/2017 | ROW | BISHOP WEISENBURGER RECEPTION RECEPTION FOR THE NEWLY INSTALLED BISHOP OF TUCSON STILLWELL HOUSE | |
| T20RW04866 | Final | 09/02/2020 | 11/01/2020 | ROW | Starting on the West side of 5th Ave and North of 12th St, Riser up TEP pole and overlash 45' going North. Riser down and trench/bore 10' going West to out of ROW. NOTE: S 5TH AV & E 12TH ST is under a pavement moratorium, any new asphalt that is disturbed will require a 2” mill and overlay for 50’ in each direction from the outside of the cut for all effected travel lanes. This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions. ADDRESS ON APPLICATION WAS 130 S 5TH AV | |
| T20RW05542 | Final | 10/09/2020 | 12/08/2020 | ROW | Part 1: From The TEP Pole East 144 S 5th Ave, begin 30' aerial overlash, adding 288ct fiber, heading South, continue 263' aerial overlash heading East, continue 142' aerial overlash heading North. Riser down and begin 10' trench/bore placing 2-2'' conduit and 288ct and 48ct fiber heading North, place 4x4 pothole and place new COX Vault. Continue 15' trench/bore heading North. Continue 30' trench/bore heading West to out of ROW . Part 2 : From the TEP pole S of 210 S 12th Ave , riser down and begin 6' trench/bore heading East, placing 2-2'' conduit and 288ct and 48ct fiber, continue North to existing COX power supply. Continue 7' trench/ bore heading East and placing 4x4 pothole, 2-2'' conduit and 288ct and 48ct fiber, place new COX Cabinet, continue 7' and place 4x4 pothole and place new COX vault, continue 7' trench/bore and place 4x4 pothole and place new COX ped, tie in. This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jody Brown at Jody.Brown@tucsonaz.gov with any questions. PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTAINED | |
| T20RW06328 | Final | 11/30/2020 | 01/30/2021 | ROW | From the TEP pole East of 134 S 5th Ave, begin 35' aerial overlash, adding 48ct fiber heading North, riser down and begin 301' pull through existing conduit adding 48 ct fiber heading North to existing COX ped. Continue 25' pull through existing conduit to out of ROW. This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office, City of Tucson, P.O. Box 27210, Tucson, AZ 85726.** Please contact Jodie Brown at Jodie.Brown@tucsonaz.gov with any questions. | |
| T21RW02007 | Final | 04/26/2021 | 06/28/2021 | ROW | Orginal Permit reference T20RW05542 Part 1: From The TEP Pole East 144 S 5th Ave, begin 30' aerial overlash, adding 288ct fiber, heading South, continue 263' aerial overlash heading East, continue 142' aerial overlash heading North. Riser down and begin 10' trench/bore placing 2-2'' conduit and 288ct and 48ct fiber heading North, place 4x4 pothole and place new COX Vault. Continue 15' trench/bore heading North. Continue 30' trench/bore heading West to out of ROW . Part 2 : From the TEP pole S of 210 S 12th Ave , riser down and begin 6' trench/bore heading East, placing 2-2'' conduit and 288ct and 48ct fiber, continue North to existing COX power supply. Continue 7' trench/ bore heading East and placing 4x4 pothole, 2-2'' conduit and 288ct and 48ct fiber, place new COX Cabinet, continue 7' and place 4x4 pothole and place new COX vault, continue 7' trench/bore and place 4x4 pothole and place new COX ped, tie in. Work starts along west side of S 5th Av just north of E 12th St, continues east along north side of E 12th St and turns north along west side of S Herbert Av. Proof of notification is required at the time of the preconstruction meeting. | |
| T22FO00784 | Final | 09/19/2022 | 04/18/2023 | FIREOPER | STILLWELL HOUSE - FUNDRAISER BRUNCH 10/2/22 |
Code Enforcement
Parcel Number - 11717020A
Date - 08/17/2026 3:30 a.m.
Total Number Of Code Cases - 1
| Case Number | Case Status | Entered Date | Closed Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| T09FR01830 | Field | 05/29/2009 | N/A | FIREINSP | System needs Hyrdo |