Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Permit Details
Status:
Final
Type:
Barricade and Excavation
Apply Date:
04/26/2021
Applicant:
COX COMMUNICATIONS
Description:
Orginal Permit reference T20RW05542
Part 1: From The TEP Pole East 144 S 5th Ave, begin 30' aerial overlash, adding 288ct fiber, heading South, continue 263' aerial overlash heading East, continue 142' aerial overlash heading North. Riser down and begin 10' trench/bore placing 2-2'' conduit and 288ct and 48ct fiber heading North, place 4x4 pothole and place new COX Vault. Continue 15' trench/bore heading North. Continue 30' trench/bore heading West to out of ROW .
Part 2 : From the TEP pole S of 210 S 12th Ave , riser down and begin 6' trench/bore heading East, placing 2-2'' conduit and 288ct and 48ct fiber, continue North to existing COX power supply. Continue 7' trench/ bore heading East and placing 4x4 pothole, 2-2'' conduit and 288ct and 48ct fiber, place new COX Cabinet, continue 7' and place 4x4 pothole and place new COX vault, continue 7' trench/bore and place 4x4 pothole and place new COX ped, tie in.
Work starts along west side of S 5th Av just north of E 12th St, continues east along north side of E 12th St and turns north along west side of S Herbert Av.
Proof of notification is required at the time of the preconstruction meeting.
Documents
| File Name |
Document Type |
|
| T21RW02007.PDF |
ROW-RIGHT OF WAY |
VIEW
|