Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Address:
211 N 4TH AV
Address NEW:
211 N 4TH AV
Apply Date:
12/13/2023
Applicant:
Kate McCaughey
Description:
ROAD CLOSURE TO INSTALL UNDERGROUND RETENTION SYSTEM AND STORM DRAIN, TIE INTO EXISTING STORM DRAIN

Permit Reviews

Permit Number - TR-ROW-1223-01450
Permit Status: Complete
Permit Description: ROAD CLOSURE TO INSTALL UNDERGROUND RETENTION SYSTEM AND STORM DRAIN, TIE INTO EXISTING STORM DRAIN
Start Date Submittal Complete Date Status  
12/13/2023 RIGHT-OF-WAY REVIEW v.1 12/19/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ROW-1223-01450
Permit Status: Complete
Permit Description: ROAD CLOSURE TO INSTALL UNDERGROUND RETENTION SYSTEM AND STORM DRAIN, TIE INTO EXISTING STORM DRAIN
Total Outstanding Activity Conditions - 2
Date Name
12/14/2023 Traffic/Mobility Control Plan (MCP) approved as submitted.
12/19/2023

Outstanding Inspections

Permit Status: Complete
Permit Number: TR-ROW-1223-01450
Permite Description: ROAD CLOSURE TO INSTALL UNDERGROUND RETENTION SYSTEM AND STORM DRAIN, TIE INTO EXISTING STORM DRAIN
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
04/03/2024 TRSP - ROW - SITE INSPECTION N/A Partial Pass
04/15/2024 TRSP - ROW - Drainage - Pipe Installation/Removal N/A Re-inspection required

Completed Inspections

Permit Status: Complete
Permit Number: TR-ROW-1223-01450
Permit Description: ROAD CLOSURE TO INSTALL UNDERGROUND RETENTION SYSTEM AND STORM DRAIN, TIE INTO EXISTING STORM DRAIN
Total Completed Inspections - 3
Date Description Inspector Results Comments
04/11/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
05/07/2024 TRSP - ROW - Final/Close-Out Passed
05/07/2024 TRSP - ROW - Drainage - Pipe Installation/Removal Passed