Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Parcel Search: 11705069E
Parcel Search
Parcel Attributes
Parcel | 11705069E |
---|---|
Jurisdiction | Tucson |
City of Tucson Zoning | I-1 |
Tucson Ward | Ward 6 |
Tucson Downtown Incentive Zone | Downtown Infill Incentive District |
Flood Related Information | FEMA Floodplain Area |
Tucson Registered Neighborhood | Downtown |
Major Streets & Routes | Arterial or Collector ,Intersection Buffer |
National Register Historic District | Warehouse Historic District |
Structure on National Register of Historic Places | Contributing |
Pima County Data | Assessor, Recorder, Treasurer, ... |
Parcel Map | Map |
Addresses |
Rezoning Cases
Date - 12/01/2024 5:36 p.m.
Total Number Of Rezone Cases - (1)
Case No. | Description | New Zone | Status | Status Date | Address |
---|---|---|---|---|---|
C9-11-05 | Downtown Links UOD | UOD | Closed | 03/23/2011 | E 7TH |
Permits
Parcel Number - 11705069E
Date - 12/01/2024 5:36 p.m.
Total Number Of Permits - (40)
Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TS-PRM-0123-00106 | Withdrawn | 01/05/2023 | 07/04/2023 | Sign - Permanent | WITHDRAWN 5/11/2023 - SIGN DESIGN IS CHANGING, PER CONTRACTOR - Install (1) set of canopy mounted neon illuminated letters | |
T22FC00067 | Complete | 01/27/2022 | 05/03/2023 | Fire Construction Permit | Automatic Fire Extingshing Sys - 8 uprights for new bathroom walls.; Commercial Fire Sprinkler Systems - Modification of heads: 8 | |
TR-ROW-0223-00332 | Complete | 02/02/2023 | 10/31/2023 | Right-of-Way (ROW) | LANE CLOSURES FOR CORBETT BLOCK, I-2020-017 - PIA T20PI00018; Work Order: CORBETT BLOCK PLAN 1 - HARD CLOSURE ON 7TH ST TO INSTALL STORM DRAIN - EXCAVATE APROX. 40’L X 8’D X 5’W. PLAN 2- REMOVE AND REPLACE 6' OF CURB AT THE SOUTH EST CORNER OF 6TH AV AND 7TH ST. 24 HR CLOSURES. | |
TS-PRM-0223-00183 | Needs resubmittal | 02/13/2023 | 08/12/2023 | Sign - Permanent | Fabricate & Install (2) canopy mounted ID signs "The Corbett" internally illuminated aluminum cabinet sign with copy routed from face and backed in acrylic, mounted to existing brick wall/pillar structure. Smaller tenant sign suspended below main sign cabinet | |
TR-UTL-0323-01100 | Issued | 03/16/2023 | 09/05/2023 | Right-of-Way (ROW) - Utility | COX TO OVERLASH 1350' OF AERIAL STRAND FOR SYSTEM TIE. | |
T19FC00348 | Complete | 05/08/2019 | 03/25/2023 | Fire Construction Permit | Automatic Fire Extingshing Sys - REINSTALL NEW RISER AND 1ST FLOOR SPRINKLER SYSTEM = 61 HEADS; Commercial Fire Sprinkler Systems - Modification of heads: 61 | |
TC-COM-0523-01285 | Issued | 05/16/2023 | 12/17/2023 | Commercial Building | Install new Electrical Meter to power existing site lighting. TEP is requesting a new permit for the new meter. plans live under T21CM06128 (340 N 6TH AV Unit:BLDG 2 TUCSON, AZ 85705) Permit for TEP purposes only. | |
TC-CFO-0524-00115 | Denied | 05/23/2024 | 09/25/2024 | BLDG 2 | Certificate of Occupancy | PLEASE PAY TCO EXTENSION UNDER TC-CFO-0823-00120 . ONCE PAID NEW TCO WILL EXTEND ANOTHER 30 DAYS AND WILL EXPIRE 12/25/2024. PLEASE REQUEST TCO EXTENSION UNDER TC-CFO-0823-00120 IN DECEMBER PRIOR TO 12/22/24 IF NEEDED. New metal building shell, covered patios, and interior restaurant fit out. Scope includes Architect |
DP20-0125 | Issued | 06/11/2020 | 08/30/2026 | Development Package | Site/Grading/SWPPP / IID - Corbett Block, new entertainment and food service. | |
TS-PRM-0623-00370 | Complete | 06/23/2023 | 03/12/2024 | Sign - Permanent | Fabricate & Install (1) set of neon illuminated open pan channel letters with clear acrylic faces, mounted to 2" steel square tube frame, mounted to canopy. | |
T18CM05456 | Needs resubmittal | 07/12/2018 | 02/18/2024 | BLDG 1 | Commercial Building | TI: SHELL |
TC-CFO-0724-00150 | Issued | 07/25/2024 | 12/25/2024 | BLDG 2 | Certificate of Occupancy | New metal building shell, covered patios, and interior restaurant fit out. Scope includes Architect |
T21CM06128 | In review | 07/28/2021 | 11/18/2024 | BLDG 2 | Commercial Building | New metal building shell, covered patios, and interior restaurant fit out. Scope includes Architect |
TC-CFO-0723-00102 | Denied | 07/28/2023 | N/A | BLDG 2 | Certificate of Occupancy | This project needs the okay for a Temporary Certificate of Occupancy from a Building Inspector and Engineering Inspector and the Temporary Certificate of Occupancy (TCO) level for the building. Please re-request on the inspector has given the okay for TCO Requesting stock and training TCO. We have received the building finals, the health dept approval for a stock and train, and the fire approval for stock and train, and we have uploaded the water sterilization report. |
TF-FOP-0723-01302 | Complete | 07/31/2023 | 08/28/2024 | BLDG 2 | Fire Operational Permit | places of assembly permit |
TF-FOP-0723-01303 | Complete | 07/31/2023 | 08/28/2024 | BLDG 3 | Fire Operational Permit | places of public assembly |
TF-FOP-0723-01304 | Complete | 07/31/2023 | 12/27/2024 | BLDG 1 | Fire Operational Permit | place of assembly |
TC-CFO-0823-00107 | Denied | 08/04/2023 | N/A | BLDG 2 | Certificate of Occupancy | Project is A2 assembly (restaurant). New ground up construction structure with covered patios and site amenities. Full furnished interior dining areas, health dept compliant kitchen, bar, and restrooms. New HVAC, Plumbing, and Electrical service. |
TC-CFO-0823-00108 | Denied | 08/04/2023 | N/A | BLDG 3 | Certificate of Occupancy | Please pay TCO extension under TC-CFO-0823-00119 This project needs the okay for a Temporary Certificate of Occupancy from a Building Inspector, Fire Inspector, and Engineering Inspector and the Temporary Certificate of Occupancy (TCO) level for the building. Please re-request on the inspector has given the okay for TCO Project is A2 assembly (restaurant bar) and A2 assembly outdoor areas (ramadas and pickleball courts). New ground up construction structures, covered patios, and pickleball court site amenities. health dept compliant bar. New HVAC, Plumbing, and Electrical service. |
TS-PRM-0823-00448 | Complete | 08/07/2023 | 03/12/2024 | Sign - Permanent | Install (1) non-illuminated open pan cabinet with inlaid wooden planks w/ stencilled lettering "Corbett's", mounted to repurposed freestanding steel archway structure. *Steel archway requires separate building permit.* | |
TE-FPU-0823-00293 | Issued | 08/14/2023 | N/A | Floodplain Use | tenant improvement within existing shell. Work includes Architecture and Electrical. | |
TE-FPU-0823-00293 | Issued | 08/14/2023 | N/A | BLDG 1 | Floodplain Use | tenant improvement within existing shell. Work includes Architecture and Electrical. |
TF-FCP-0823-00997 | Complete | 08/16/2023 | 02/24/2024 | Fire Construction Permit | Add 6 sidewalls under overhead doors | |
T22RW03002 | Complete | 08/20/2022 | 02/03/2023 | Right-of-Way (ROW) | LANE CLOSURES FOR CORBETT BLOCK, I-2020-017 - PIA T20PI00018; Work Order: CORBETT BLOCK PLAN 1 - HARD CLOSURE ON 7TH ST TO INSTALL STORM DRAIN - EXCAVATE APROX. 40’L X 8’D X 5’W. PLAN 2- REMOVE AND REPLACE 6' OF CURB AT THE SOUTH EST CORNER OF 6TH AV AND 7TH ST. 24 HR CLOSURES. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. THIS PROJECT IS LOCATED IN AN ARCHAEOLOGICAL SENSITIVITY ZONE. STOP WORK AND NOTIFY HPO IF ANY BURIED CULTURAL MATERIALS ARE ENCOUNTERED DURING CONSTRUCTION. 1. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 2. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. 3. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. 4. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.) 5. ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE. 6. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. 7. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION 8. MAINTAIN PEDESTRIAN ACCESS 9. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. IF WEEKEND WORK, MAKE CONTACT 48 HOURS PRIOR TO THE WEEKEND. DAN ROBERTSON- 520-400-6722 | |
TC-CFO-0823-00119 | Fees due | 08/21/2023 | 12/22/2024 | BLDG 3 | Certificate of Occupancy | PLEASE PAY TCO. ONCE PAID NEW TCO WILL EXTEND ANOTHER 30DAYS AND WILL EXPIRE 12/22/24. PLEASE REQUEST TCO EXTENSION IN DECEMBER PRIOR TO 12/22/24 IF NEEDED. Project is A2 assembly (restaurant bar) and A2 assembly outdoor areas (ramadas and pickleball courts). New ground up construction, covered patios, and pickleball court site amenities. New HVAC, Plumbing, and Electrical service. |
TC-CFO-0823-00120 | Complete | 08/21/2023 | 12/25/2024 | BLDG 2 | Certificate of Occupancy | Project is A2 assembly (restaurant). New ground up construction structure with covered patios and site amenities. Full furnished interior dining areas, health compliant kitchen, bar, and restrooms. New HVAC, Plumbing, and Electrical service. |
TC-CFO-0823-00121 | Fees due | 08/22/2023 | 12/22/2024 | BLDG 1 | Certificate of Occupancy | PLEASE PAY TCO. ONCE PAID NEW TCO WILL EXTEND ANOTHER 30DAYS AND WILL EXPIRE 12/22/24. PLEASE REQUEST TCO EXTENSION IN DECEMBER PRIOR TO 12/22/24 IF NEEDED. Project is A2 assembly (Pickleball Courts) tenant Improvement within existing building . New HVAC, Plumbing, and Electrical service. |
T21OT00712 | Issued | 09/27/2021 | 03/28/2022 | Floodplain Use | New metal building shell, covered patios, and interior restaurant fit out. Scope includes Architectu | |
TF-FOP-1024-01178 | Fees due | 10/14/2024 | 01/21/2025 | Fire Operational Permit | Corbett's - Downtown Jazz Fiesta 2025 | |
TR-ROW-1024-01211 | Approved | 10/14/2024 | N/A | Right-of-Way (ROW) | Downtown Jazz Fiesta 2025 Traffic control set up and take down: Sunday, January 19, 12PM - Monday, January 20, 11PM | |
T21RW04795 | Complete | 10/21/2021 | 03/19/2023 | Right-of-Way (ROW) | OFFSITE IMPROVEMENTS FOR CORBETT BLOCK, PIA T20PI00018, DP20-0125PLACEMENT OF FENCE ONLY AROUND; Work Order: DP20-0125 | |
T21RW04859 | Complete | 10/29/2021 | 04/01/2022 | Right-of-Way (ROW) | CORBETT BLOCK, T20PI00018 , DP20-0125TRENCH TO INSTALL ELECTRIC CONDUIT 704L’ X 2’W X 3’D’ . TH; Work Order: CORBETT BLOCK | |
TC-COM-1022-00003 | Needs resubmittal | 10/31/2022 | N/A | Commercial Building | Existing building renovation, new commercial building, site work | |
TC-COM-1122-00037 | In review | 11/03/2022 | 02/19/2024 | BLDG 3 | Commercial Building | courtyard remodel to add 3 Pickleball courts, small bar building , ramadas, and storage structure. Architectural, Mechanical, Plumbing, and electrical. |
TC-COM-1122-00039 | Issued | 11/03/2022 | 02/27/2024 | BLDG 1 | Commercial Building | tenant improvement within existing shell. Work includes Architecture and Electrical. |
T21FC00829 | Complete | 11/08/2021 | 05/03/2023 | Fire Construction Permit | Automatic Fire Extingshing Sys - New fire sprinkler system - 89 heads. | |
TF-FCP-1122-00116 | Complete | 11/18/2022 | N/A | Fire Construction Permit | EXTEND THE EXISTING MONITORING CIRCUIT TO THE NEW SPRINKLER RISER AND KITCHEN HOODS FIRE RELAY -UPDATED TO NEW NOTIFICATION SYSTEM | |
TF-FOP-1123-01781 | Complete | 11/19/2023 | 01/16/2024 | Fire Operational Permit | Downtown Jazz Fiesta | |
T21FC00884 | Complete | 12/03/2021 | 05/03/2023 | Fire Construction Permit | Automatic Fire Extingshing Sys - Installation of Protex II Fire Suppression System for kitchen hood.; Commercial Cooking Suppression - New System: 1; Additional Plan Reviews: 1 | |
TR-ROW-1223-01447 | Complete | 12/12/2023 | 01/16/2024 | Right-of-Way (ROW) | Downtown Jazz Fiesta Traffic Control set up and take down: Sunday, January 14, 9am - Monday, January 15, 11pm |
Plans
Parcel Number - 11705069E
Date - 12/01/2024 5:36 p.m.
Total Number Of Plans - 1
Plan Number | Plan Status | Application Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T20PI00018 | Complete | 10/13/2022 | 04/11/2023 | Private Improvement Agreement | Offsite Improvement Plan for Corbett Block - 7th Street, 5th Avenue, 5th Avenue Link, and Corbett Lane - including new public roads of 5th Avenue Link and Corbett Lane, and a new traffic circle at 5th Avenue and 5th Avenue Link intersection, and new asphalt, sidewalk, curb, ramps, multi-use path along Corbett Lane, and new angled reverse parking on 5th avenue. |