Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Parcel Search: 117031120
Parcel Search
Parcel Attributes
Parcel | 117031120 |
---|---|
Jurisdiction | Tucson |
City of Tucson Zoning | C-3 |
Tucson Ward | Ward 1 |
Tucson Downtown Incentive Zone | Downtown Infill Incentive District |
Tucson Registered Neighborhood | Dunbar Spring |
Major Streets & Routes | Arterial or Collector ,Intersection Buffer |
Pima County Data | Assessor, Recorder, Treasurer, ... |
Parcel Map | Map |
Address |
Annexations & Original City Zoning (OCZ)
Date - 11/23/2024 3:09 a.m.
Total Number Of OZC Plans - (1)
Plan | Description | Annexation Ordinance | Effective Date | OCZ Ordinance |
---|---|---|---|---|
Original Town Of Tucson | ORIGINAL | 08/07/1877 | None |
Special Development Requests & Requirements
Date - 11/23/2024 3:09 a.m.
Total Number Of Special Development Permits - (1)
Activity Number | Status | Apply Date | Expired Date | Type | Description |
---|---|---|---|---|---|
T22SA00298 | Complete | N/A | Zoning Compliance Letter |
Permits
Parcel Number - 117031120
Date - 11/23/2024 3:09 a.m.
Total Number Of Permits - (204)
Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. | |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 1 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 1 UNIT 1101 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 1 UNIT 1102 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 1 UNIT 1103 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 1 UNIT 1201 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 1 UNIT 1202 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 1 UNIT 1203 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 2 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 2 UNIT 2101 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 2 UNIT 2102 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 2 UNIT 2103 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 2 UNIT 2104 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 2 UNIT 2105 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 2 UNIT 2201 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 2 UNIT 2202 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 2 UNIT 2203 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 2 UNIT 2204 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 2 UNIT 2205 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 2 UNIT 2301 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 2 UNIT 2302 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 2 UNIT 2303 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 2 UNIT 2304 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 2 UNIT 2305 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3101 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3102 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3103 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3104 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3105 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3106 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3107 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3108 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3109 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3110 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3111 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3112 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3113 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3114 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3115 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3116 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3117 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3118 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3119 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3120 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3121 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3122 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3123 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3125 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3126 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3127 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3128 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3129 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3130 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3131 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3201 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3202 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3203 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3204 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3205 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3206 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3207 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3208 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3209 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3210 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3211 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3212 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3213 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3214 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3215 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3216 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3217 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3218 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3219 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3220 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3221 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3222 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3223 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3224 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3225 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3226 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3227 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3228 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3229 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3230 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3231 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3301 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3302 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3303 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3304 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3305 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3306 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3307 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3308 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3309 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3310 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3311 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3312 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3313 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3314 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3315 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3316 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3317 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3318 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3319 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3320 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3321 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3322 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3323 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3324 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3325 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3326 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3327 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3328 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3329 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3330 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3331 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3402 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3403 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3404 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3405 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3406 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3407 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3408 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3409 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3410 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3411 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3412 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3413 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3414 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3415 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3416 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3417 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3418 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3419 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3420 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3421 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3422 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3423 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3424 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3425 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3426 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 3 UNIT 3427 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 4 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 4 UNIT 4101 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 4 UNIT 4102 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 4 UNIT 4201 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 4 UNIT 4202 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 4 UNIT 4301 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 4 UNIT 4302 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 5 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 5 UNIT 5101 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 5 UNIT 5102 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 5 UNIT 5103 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 5 UNIT 5104 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 5 UNIT 5105 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 5 UNIT 5106 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 5 UNIT 5107 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 5 UNIT 5108 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 5 UNIT 5109 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 5 UNIT 5110 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 5 UNIT 5201 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 5 UNIT 5202 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 5 UNIT 5203 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 5 UNIT 5204 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 5 UNIT 5205 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 5 UNIT 5206 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 5 UNIT 5207 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 5 UNIT 5208 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 5 UNIT 5209 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 5 UNIT 5210 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 5 UNIT 5301 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 5 UNIT 5302 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 5 UNIT 5303 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 5 UNIT 5304 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 5 UNIT 5305 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 5 UNIT 5306 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 5 UNIT 5307 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 5 UNIT 5308 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 5 UNIT 5309 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | BLDG 5 UNIT 5310 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | UNIT 151 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TR-ROW-0123-00229 | Complete | 01/10/2023 | 06/07/2023 | UNIT 415 | Right-of-Way (ROW) | Air Vacuum Utility Potholing of various utilities with +/-12"x12" holes at 49 locations for the design phase of City of Tucson Road Recovery Proposition 101 Rehabilitation Package 10. |
TD-DEV-0923-00396 | Issued | 09/13/2023 | 08/28/2027 | Development Package | Development Plan for an existing building being converted to Gem Show wholesale. Projects under the IID option | |
T00AN00553 | Issued | 07/25/2000 | N/A | #101 | ADDRNEW | |
T00AN00554 | Issued | 07/25/2000 | N/A | #155 | ADDRNEW | |
T00EL02188 | Final | 09/12/2000 | N/A | #101 | ELECT | 400AMP-2 200AMP:SEPERATE SERVICES |
T00OT00020 | Withdrwn | 01/24/2000 | N/A | C-OF-O | C OF O INSPECTION:SKATE PARK | |
T02EL02271 | Final | 11/19/2002 | 07/09/2003 | #101 | ELECT | ELECTRIC:RECONNECT |
T03OT00627 | Withdrwn | 04/11/2003 | N/A | #101 | C-OF-O | C OF O:TUCSON SKATE PARK |
T04EL00438 | Closed | 03/02/2004 | 09/13/2004 | #101 | ELECT | ELECTRIC:RECONNECT 2 UNITS |
T05AN00770 | Issued | 07/14/2005 | N/A | ADDRNEW | ||
T05CM03734 | C of o | 07/14/2005 | 08/22/2006 | COMBO | TI: SERVICE & REPAIR SHOP | |
T05OT01747 | Closed | 07/15/2005 | 01/24/2006 | SIGN | SIGN: GREASE MONKEY CUSTOMS | |
T05OT01764 | Final | 07/18/2005 | 02/28/2006 | SIGN | SIGN:9364 GREASE MONKEY CUSTOMS | |
T06OT00364 | Final | 02/07/2006 | 07/10/2010 | SIGN | 10599 | |
T11CM01097 | Withdrwn | 04/14/2011 | N/A | COMBO | ADD; SOLAR VOLTAIC SYSTEM TO COMMERCIAL BLDG | |
T12CM01462 | Final | 03/29/2012 | 06/29/2014 | COMBO | HCS REPAIR - COMM | |
T12EX00128 | Closed | 03/29/2012 | 05/28/2012 | EXCAV | TRENCH FOR HCS REPAIR | |
T12EX00562 | Closed | 10/25/2012 | 12/24/2012 | EXCAV | REPAIR MANHOLE AT INTERSECTION 2ND ST / ASH ST | |
T14OT00430 | Expired | 04/09/2014 | 01/07/2015 | SIGN | BANNER - 90 DAYS APRIL 9, 2014 THRU JULY 8, 2014 | |
T15CM04922 | Expired | 07/17/2015 | 04/24/2016 | COMBO | TI: WAREHOUSE & OFFICE | |
T17CM05896 | Final | 08/02/2017 | 04/24/2018 | COMBO | TI; ADEQ REMEDIATION | |
T20CM02349 | Final | 04/17/2020 | 10/14/2020 | COMBO | ELECTRICAL RECONNECT |
Code Enforcement
Parcel Number - 117031120
Date - 11/23/2024 3:09 a.m.
Total Number Of Code Cases - 12
Case Number | Case Status | Entered Date | Closed Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T14DV01570 | Complian | 03/14/2014 | N/A | DNR_VIOL | Business displaying merchandise for sale outside the building. Specifically toilets and other merchandise. | |
T14DV04702 | Complian | 07/11/2014 | N/A | DNR_VIOL | THE STOCKYARD -- ILLEGAL SIGNS | |
T14DV05173 | Noverify | 07/23/2014 | N/A | DNR_VIOL | GPC WILL NOT REMOVE - n/side of bldg is tagged | |
T16DV02794 | Noverify | 05/05/2016 | N/A | DNR_VIOL | Illegal business being ran out of home. "Bright Properties" it's called. and refuse our front. | |
T16DV03026 | Complian | 05/19/2016 | N/A | DNR_VIOL | REFUSE AND DEBRIS OUT FRONT OF COMMERCIAL BUSINESS INCLUDING COUCH AND CINDER BLOCK. | |
T17DV00413 | Complian | 01/31/2017 | N/A | DNR_VIOL | GRAFFITI - 847 N Stone is under construction & has graffiti on the bldg | |
T17DV02598 | Complian | 06/20/2017 | N/A | DNR_VIOL | Graffitti large bubble letters on the north facing wall. | |
T17DV06756 | Complian | 12/22/2017 | N/A | DNR_VIOL | Large bubble graffiti on the north side of the building | |
T18DV03572 | Complian | 06/19/2018 | N/A | DNR_VIOL | EXCESSIVE TRASH, ABANDONED BUILDING. LOOKS AS IF HOMELESS POPULATIONIS USING THIS AS A SHELTER. | |
T18DV05260 | Complian | 08/30/2018 | N/A | DNR_VIOL | There is excessive trash at this run down, abandoned building. It looks as if the homeless population is using this as a shelter which is making residents in the community very uncomfortable. | |
T18DV06528 | Complian | 10/09/2018 | N/A | DNR_VIOL | TRASH AND DEBRIS IN FENCED AREA BEHIND ABANDONED BUILDING | |
T98VL00750 | Complian | 09/22/1998 | N/A | CODEVIOL | COMPLAINT:SIGN:A-FRAME VIOLATION:A-FRAME W/O PERMITS |
Plans
Parcel Number - 117031120
Date - 11/23/2024 3:09 a.m.
Total Number Of Plans - 3
Plan Number | Plan Status | Application Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
SD-1023-00118 | Complete | 10/26/2023 | N/A | Special Districts | IID request for adaptive reuse of existing building to allow for Gem Show office/gallery space and restaurant. | |
TP-PRE-0523-00207 | Complete | 05/11/2023 | N/A | Pre-Application | Proposed offices and cafe, phased development, adaptive reuse of existing historic building. | |
TP-PRE-0923-00327 | In review | 09/21/2023 | N/A | Pre-Application | Historic Courtesy Review - Proposed offices and cafe, phased development, adaptive reuse of existing historic building. |