Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel Search

 
Parcel Attributes
Parcel11702133A
JurisdictionTucson
City of Tucson ZoningHR-2
Water Course

Washes

Tucson WardWard 1
Tucson Downtown Incentive ZoneDowntown Infill Incentive District
Tucson Registered NeighborhoodWest University
Major Streets & Routes

Arterial or Collector

,

Intersection Buffer

National Register Historic District

West University Historic District

Structure on National Register of Historic Places

Contributing

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address

Annexations & Original City Zoning (OCZ)

Date - 12/23/2024 6:10 p.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
Original Town Of Tucson ORIGINAL 08/07/1877 None

Rezoning Cases

Date - 12/23/2024 6:10 p.m.
Total Number Of Rezone Cases - (1)
Case No. Description New Zone Status Status Date Address
C9-83-49 West University Historic District HR-2 Effectuated 09/23/2010 N STONE

Special Development Requests & Requirements

Date - 12/23/2024 6:10 p.m.
Total Number Of Special Development Permits - (1)
Activity Number Status Apply Date Expired Date Type Description
T20SA00305 Approved N/A De Anza Park-New Dog Park and Restroom building remodel

Permits

Parcel Number - 11702133A
Date - 12/23/2024 6:10 p.m.
Total Number Of Permits - (12)
Permit Permit Status Entered Date Expired Date Unit Type Description
TC-COM-0423-01043 Complete 04/12/2023 10/02/2024 Commercial Building 2 Umbrellas and 2 Benches
T21CM05370 Issued 06/29/2021 04/24/2023 Commercial Building Renovation of existing Anza ParkThis work includes: New Restroom Building
T22RW03711 Complete 10/10/2022 12/19/2022 Right-of-Way (ROW) Job Order Contract (JOC) for Traffic Signal & Street Light Construction, CONTRACT NO. 181906-2CO
DP20-0212 Issued 10/15/2020 02/28/2023 Development Package SITE - Anza Park, Phase One, new dog park.
DP20-0214 Issued 10/16/2020 04/18/2023 Development Package SITE - Anza Park, restroom buildings.
TS-PRM-1223-00631 Issued 12/07/2023 08/20/2024 Sign - Permanent New sign in median adjacent to 1000 N Stone (Miracle Mile - neon - HCD project - ROW permit issued - DTM leading inspections except Neon)
TC-DMO-1222-00029 Issued 12/20/2022 09/09/2023 Demolition Permit Demolish old Anza Park restroom structure and salvage any valuable materials that can be reasonably salvaged. Cap existing utilities and clean up site. Work to be performed by Parks Department on-call contractor Durazo Construction and subcontractor.
T07EL01747 Final 09/27/2007 11/01/2008 ELECT REPLACE ELECTRICAL CABINET
T12CM06281 Final 10/08/2012 05/19/2013 COMBO REPLACE: PANELBOARD FEEDER AND RELOCATE ELECTRICAL FOR AN IRRIGATION BOOSTER PUMP
T22RW00257 Final 01/27/2022 08/27/2022 ROW TRENCH 30'L X 2'W X 4'D FOR A NEW SEWERLINE PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF PRECONSTRUCTION MEETING
T22RW00321 Final 02/01/2022 03/06/2022 ROW Install new water line on 1st. Trench 75’L X 2’W X 3’D on north side of 1st between curb and sidewalk then under sidewalk and into the park. No sidewalk will be removed. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. DAN ROBERTSON AT 520-400-6722 OR TOM ADKINS AT 520-400-3813. After the fact permit - Any legal questions related to this work shall be directed to Durazo Construction Corp to address since DTM did not have an opportunity to review, approve or inspect work.
T22RW03047 Final 08/24/2022 10/02/2022 ROW Tie new sidewalk into existing side walk . ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP. UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 50’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES.

Code Enforcement

Parcel Number - 11702133A
Date - 12/23/2024 6:10 p.m.
Total Number Of Code Cases - 1
Case Number Case Status Entered Date Closed Date Unit Type Description
T18DV05709 Referred 09/13/2018 N/A DNR_VIOL LT - Weeds & Refuse

Plans

Parcel Number - 11702133A
Date - 12/23/2024 6:10 p.m.
Total Number Of Plans - 1
Plan Number Plan Status Application Date Expired Date Unit Type Description
SD-0523-00054 Complete 05/16/2023 N/A Special Districts 2 Umbrellas and 2 Benches