Parcel Search: 11504498B
Parcel Search
Parcel Attributes
Parcel | 11504498B |
---|---|
Jurisdiction | Tucson |
City of Tucson Zoning | UC-1, UC-1 |
Tucson Ward | Ward 6 |
Tucson Registered Neighborhood | West University |
Major Streets & Routes | Arterial or Collector ,Intersection Buffer |
National Register Historic District | West University Historic District |
Pima County Data | Assessor, Recorder, Treasurer, ... |
Parcel Map | Map |
Special Development Requests & Requirements
Date - 11/14/2024 11:34 p.m.
Total Number Of Special Development Permits - (2)
Activity Number | Status | Apply Date | Expired Date | Type | Description |
---|---|---|---|---|---|
T17SA00305 | Approved | 10/17/2018 | MAJOR IID Project:The HUB III proposal is for a new mixed-use development at the southwest corner of Speedway Boulevard and Tyndall Avenue. The Project is 0.67 of an acre and is currently zoned C-1. The Project is located in the Main Gate Overlay District (MGO) within Area 1, Tyndall Sub-area. The Project will have approximately 57 residential units with 186 beds. | ||
T18SA00400 | Final | N/A | TEMPORARY NOISE EXEMPTION |
Permits
Parcel Number - 11504498B
Date - 11/14/2024 11:34 p.m.
Total Number Of Permits - (14)
Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T20CM02355 | Expired | 04/17/2020 | 10/20/2020 | 110 | Commercial Building | ELECTRICAL RECONNECT |
DP17-0301 | Complete | 12/22/2017 | 05/31/2020 | Development Package | SITE/GRADING/MGD-17-02 - HUB III | |
T16OT00019 | Expired | 01/06/2016 | 07/10/2016 | SIGN | WALL SIGN | |
T18BU00593 | Issued | 10/24/2018 | 02/05/2020 | POOL/SPA | POOL & SPA | |
T18CM00899 | Final | 02/05/2018 | 01/11/2020 | COMBO | FOUNDATION 1ST AND STUDENT HOUSING AFTER | |
T18CM00946 | C of o | 02/06/2018 | 06/10/2020 | COMBO | APARTMENTS | |
T18CM04532 | Expired | 06/11/2018 | 12/17/2018 | COMBO | CONSTRUCTION TRAILER WITH TEMPORARY POWER | |
T18FC00749 | Final | 09/11/2018 | 02/17/2020 | FIRECONS | Install new fire alarm system | |
T18FC00825 | Final | 10/08/2018 | 03/09/2020 | FIRECONS | Install new fire sprinkler system | |
T18RW01949 | Final | 05/01/2018 | 06/01/2018 | ROW | (2) 5X5 bellholes in concrete alley--- to repair/replace gas line Approx 30 ft trench across Tyndall Ave | |
T18RW03900 | Expired | 08/30/2018 | 02/17/2019 | ROW | Installation of new 6" primary electric conduit from existing electrical panels on the West side of Wildcat Laundry North on Tyndall to Speedway and West on Speedway to the alley on the West side of the future HUB III building. All work (saw cutting, pavement removal, potholing, trenching, conduit installation, backfill) will be performed during night shift. Asphalt paving will need to be done during the day, or on a Saturday when the batch plant is open. Night work will be limited to Thursday 9/20/18 through Wednesday 9/26/18 per the TNE. With weather impacts, possible work on Sunday night will be required. Final paving will be scheduled within 10 days of night work (prior to 10/5/18). Note: Existing bus stop on Speedway is already out-of-service. No impacts to SunTran will be realized. | |
T19FC00476 | Final | 06/19/2019 | 02/17/2020 | FIRECONS | Emergency Responder Radio Coverage Installation | |
T19RW00851 | Final | 02/14/2019 | 03/22/2019 | ROW | (2) 5x5 IN DIRT/ASPHALT ALLEY TO REPAIR/REPLACE GAS LINE | |
T19RW02893 | Final | 05/23/2019 | 06/23/2019 | ROW | (2) 5x5 IN DIRT/ASPHALT ALLEY TO UPGRADE GAS LINE |
Code Enforcement
Parcel Number - 11504498B
Date - 11/14/2024 11:34 p.m.
Total Number Of Code Cases - 4
Case Number | Case Status | Entered Date | Closed Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T17DV06449 | Noverify | 12/04/2017 | N/A | DNR_VIOL | 12 ft graffiti tag on west wall of vacant bldg | |
T21DV08634 | Complian | 12/07/2021 | N/A | DNR_VIOL | leak coming out from the celing or wall not sure near the built in microwave that cause a fire already last weekend tenant got burnt. Tenant thinks it might be an electrical issue. APT 209 | |
T22DV05117 | Noverify | 09/02/2022 | N/A | DNR_VIOL | Unit 303 No hot water for the last 8 days | |
T22DV05510 | Complian | 09/23/2022 | N/A | DNR_VIOL | Raw sewage leaking onto ground in parking garage |
Plans
Parcel Number - 11504498B
Date - 11/14/2024 11:34 p.m.
Total Number Of Plans - 3
Plan Number | Plan Status | Application Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
CWH-17-0301 | Active | 12/22/2017 | 05/31/2020 | Basin | SITE/GRADING/MGD-17-02 - HUB III | |
T18PI00006 | Approved | 02/23/2018 | 01/30/2021 | Private Improvement Agreement | THE HUB AT TUCSON PHASE III | |
T18PI00008 | Void | 03/29/2018 | N/A | PAVING & SEWER | THE HUB AT TUCSON PH III - TEST PURPOSES |