Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Parcel Search
 
Parcel Attributes
Parcel11015232Q
JurisdictionTucson, Pima County
City of Tucson ZoningR-2, C-2
Tucson WardWard 2
Major Street & Route

Arterial or Collector

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Date - 10/11/2026 5:44 p.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-59-19 North To Roger Rd. And East To Kolb Rd. 1895 04/26/1959 1957

Rezoning Cases

Date - 10/11/2026 5:44 p.m.
Total Number Of Rezone Cases - (1)
Case No. Description New Zone Status Status Date Address
C9-81-41 Morrison - Grant Road B-2A Effectuated 10/21/2010 5801 E GRANT

Permits

Parcel Number - 11015232Q
Date - 10/11/2026 5:44 p.m.
Total Number Of Permits - (12)
Permit Permit Status Entered Date Expired Date Unit Type Description
TD-DEV-0323-00159 Complete 03/03/2023 02/12/2027 Development Package Adding open air pavilion to existing cemetery. Used Checklist for Minor Development Changes to Existing Commercial/Industrial Sites
TD-DEV-0423-00220 Withdrawn 04/21/2023 09/17/2026 Development Package Customer requested (REQ-0925-00537) to withdraw permitted DP in order to submit new DP plan. confirmed via email conversation with Theresa Hadley. She was offered the option to do a revision instead, but chose to withdraw the old DP and go through the process with a new DP. Addition of a two car garage accessed off of an existing garage as well as a walled patio with open trellise.
TF-FCP-0626-00418 Inspections 06/25/2026 01/22/2027 Fire Construction Permit Modify existing fire sprinkler system & install new piping in new additions
TF-FCP-0725-00603 Complete 07/24/2025 02/05/2026 Fire Construction Permit Johnson Controls to add a cellular communicator to existing FACP
TC-COM-0823-01994 Withdrawn 08/15/2023 02/11/2024 Commercial Building Addition of a service garage and outdoor patio. Internal TI to catering room off of patio. Note, associated DP; TD-DEV-0423-00220
DP18-0199 Complete 08/16/2018 04/25/2020 Development Package E SITE/GRADING - NEW MASOLEUM- EAST LAWN PALMS
TR-UTL-0823-02295 Complete 08/17/2023 10/27/2023 Right-of-Way (ROW) - Utility W.2986185-2: ACCESS OF EX HH 29784 FOR SPLICING
TD-DEV-0825-00230 Issued 08/29/2025 08/27/2029 Development Package Revision 1-Minor DP for a building expansion in the NEC of the East Lawn Funeral Home
TW-CONS-0926-0085 Pre-construction 09/10/2026 N/A TW CIP Planning & Engineering The Grant Large Meter replacement has 100% plans to review.
TC-COM-1025-01809 Issued 10/06/2025 10/07/2027 Commercial Building REV 1 - Started 08/14/26 update the drawing set to show an unseparated occupancy with calculations and egress plans to support. Please note that the firewalls at the garage will remain. NEW GARAGE ADDITION, EXPANSION OF VENUE #2 AND REMODEL OF SELECT EXISTING SPACES. ASSOCIATED PERMIT - MINOR DP - TD-DEV-0825-00230
TC-UTL-1225-00115 Issued 12/08/2025 07/02/2029 Utilities Permit Minor DP for a building expansion in the NEC of the East Lawn Funeral Home
TC-COM-1222-00359 Complete 12/22/2022 07/20/2024 Commercial Building Adding new open air pavilion to existing cemetery

Code Enforcement

Parcel Number - 11015232Q
Date - 10/11/2026 5:44 p.m.
Total Number Of Code Cases - 1
Case Number Case Status Entered Date Closed Date Unit Type Description
CE-VIO1122-00635 Closed - resolved 11/23/2022 06/28/2023 Code Enforcement Case building a mausoleum without proper permits.

Plans

Parcel Number - 11015232Q
Date - 10/11/2026 5:44 p.m.
Total Number Of Plans - 2
Plan Number Plan Status Application Date Expired Date Unit Type Description
CWH-18-0199 Active 08/16/2018 04/25/2020 Basin E SITE/GRADING - NEW MASOLEUM- EAST LAWN PALMS
TW-PLAN-0326-0071 Awaiting submittal 03/31/2026 N/A TW CIP Planning & Engineering The Grant Large Meter replacement has 100% plans approved and the contractor is set to construct on Monday the 21st.