Plan Details
Status:
Submitted
Type:
TW CIP Planning & Engineering
Apply Date:
03/31/2026
Applicant:
Tucson Water
Description:
The Grant Large Meter replacement has been pushed back for plans; The new policy requiring a plan set to be ready before construction will push the start date for this meter site into fy27; Contractor was ready to start 5/11. CEC has been contracted, and PO-007983 has been created for the plan set.
Architects:
- HERMAN CONTRACTING
- Tucson Water