Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Not Ready
Inspection History: COT - SIGN - Sign Electrical
| Date |
Description |
Inspector |
Results |
Comments |
| 03/17/2025 |
COT - SIGN - Sign Electrical |
|
Not Ready |
Needed, disconnect switch, UL label and installer label on out side of sign box as shown on plans. Also timer and 20amp breaker inside of building. |
| 04/17/2025 |
COT - SIGN - Sign Electrical |
|
Passed |
|