Inspection Status: Partial Pass
Inspection History: COT - FCON - Underground Pressure
| Date |
Description |
Inspector |
Results |
Comments |
| 02/07/2025 |
COT - FCON - Underground Pressure |
|
Partial Pass |
OK to pour thrust block and bury stub out and 1 section of pipe. |
| 05/07/2025 |
COT - FCON - Underground Pressure |
|
Partial Pass |
Inspected the riser sweep that was moved inside building #3, still needs pressure test. |
| 03/05/2025 |
COT - FCON - Underground Pressure |
|
Passed |
|
| 09/11/2025 |
COT - FCON - Underground Pressure |
|
Passed |
|
| 06/12/2025 |
COT - FCON - Underground Pressure |
|
Re-inspection required |
Ok to burry last 8 ft of pipe. Still need the 200lb pressure test and flush on the entire line. |
| 01/08/2025 |
COT - FCON - Underground Pressure |
|
Partial Pass |
building 3 riser |
| 05/02/2025 |
COT - FCON - Underground Pressure |
|
Partial Pass |
Inspected building 3's riser that was moved, will still need to be pressurized. |