Inspection Status: Partial Pass

Inspection History: COT - FCON - Underground Pressure

Date Description Inspector Results Comments
02/07/2025 COT - FCON - Underground Pressure Partial Pass OK to pour thrust block and bury stub out and 1 section of pipe.
05/07/2025 COT - FCON - Underground Pressure Partial Pass Inspected the riser sweep that was moved inside building #3, still needs pressure test.
03/05/2025 COT - FCON - Underground Pressure Passed
09/11/2025 COT - FCON - Underground Pressure Passed
06/12/2025 COT - FCON - Underground Pressure Re-inspection required Ok to burry last 8 ft of pipe. Still need the 200lb pressure test and flush on the entire line.
01/08/2025 COT - FCON - Underground Pressure Partial Pass building 3 riser
05/02/2025 COT - FCON - Underground Pressure Partial Pass Inspected building 3's riser that was moved, will still need to be pressurized.