Parcel: 11706077R


Addresses:

211 N 4TH AV


Inspection Status: Not Ready

Inspection History: FCON – OH Piping & Hydro

Permit Number - TF-FCP-0123-00325

Inspection Description - FCON – OH Piping & Hydro

Inspection Status - Not Ready

Date Description Inspector Results Comments
FCON – OH Piping & Hydro Not Ready system was leaking at 8am.
01/17/2024 FCON – OH Piping & Hydro Partial Pass Level 10A 225psi.
01/23/2024 FCON – OH Piping & Hydro Partial Pass Level 10B 220psi.
01/29/2024 FCON – OH Piping & Hydro Partial Pass Level 10C 225psi.
02/06/2024 FCON – OH Piping & Hydro Partial Pass Level 11A 220psi.
02/12/2024 FCON – OH Piping & Hydro Partial Pass Level 11B 220psi.
02/21/2024 FCON – OH Piping & Hydro Partial Pass Level 12A and 12B. 220psi.
02/28/2024 FCON – OH Piping & Hydro Partial Pass Level 13A and 13B. 225psi.
03/14/2024 FCON – OH Piping & Hydro Partial Pass Level 1 except for retail space. 215psi.
Level 3 Amenities area. 230psi.
08/17/2023 FCON – OH Piping & Hydro Partial Pass OH Hydro on 3B. 200psi.
08/29/2023 FCON – OH Piping & Hydro Partial Pass OH hydro on section 3C 240 psi and section 4A 225 psi.
09/14/2023 FCON – OH Piping & Hydro Partial Pass Level 4C 225psi
09/21/2023 FCON – OH Piping & Hydro Partial Pass Level 5A 235psi
09/28/2023 FCON – OH Piping & Hydro Partial Pass Level 5B 205psi.
10/04/2023 FCON – OH Piping & Hydro Partial Pass Level 5C 200psi
10/16/2023 FCON – OH Piping & Hydro Partial Pass Level 6A and 6B. 230psi and 220psi.
10/18/2023 FCON – OH Piping & Hydro Partial Pass Level 6C 215psi.
11/01/2023 FCON – OH Piping & Hydro Partial Pass Level 7A and 7B. 230psi.
11/07/2023 FCON – OH Piping & Hydro Partial Pass Level 7C 235psi.
11/22/2023 FCON – OH Piping & Hydro Partial Pass Level 8A 200psi.
12/05/2023 FCON – OH Piping & Hydro Partial Pass Level 8B and 8C. 220psi and 230psi
12/20/2023 FCON – OH Piping & Hydro Partial Pass Level 9A and 9B. 220psi.
08/07/2024 FCON – OH Piping & Hydro Passed
08/14/2023 FCON – OH Piping & Hydro Partial Pass Partial for Section 3A. 225psi.
09/05/2023 FCON – OH Piping & Hydro Partial Pass Basement Parking Garage 215psi
2nd Floor Parking Garage 200psi
Level 4B 230psi