Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/15/2026 | ENGR Engineering Final | Partial Pass | landscape is not complete still installing DG. Need to put address on the building and label the building |
|
| 04/22/2026 | ENGR Engineering Final | Partial Pass | contractor needs to complete installing all the DG. Clean all the construction material around the buildings and finish planning some of the plants in the front |
|
| 04/27/2026 | ENGR Engineering Final | Partial Pass | missing one tree at building two south east corner The gates are not working as of today the contractor is on site working on the gates |
|
| 04/28/2026 | ENGR Engineering Final | Passed |