Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/05/2026 | PDSD Engineering Division Pre-Construction SITE | Passed | Pre-Construction meeting held on-site with Geoff. Stormwater controls need to be put in place immediately. Grading work is in progress. Temp fencing is being erected currently. "NPPO Pre-Construction" inspection should be called in asap. "Stormwater Initial" inspection should be called in no later than 1/7/26 to confirm horizontal controls are in place prior to rainfall. |